10

Hotel Paradisus Rio de Oro after Ike (20/10/08)

Embed Size (px)

DESCRIPTION

This is the situation of the recuperation works Paradisus Rio de Oro. All the buildings whose roofs suffered damage have been completely repaired as well as all the rubbish from the gardens has been removed. The hotel is in the last stage of works, which includes change of image of all the restaurants, the Front Desk, and final details at the Spa, swimming pool and beach. Paradisus Rio de Oro will be in perfect conditions to welcome our precious clients on October 27, 2008.

Citation preview

Page 1: Hotel Paradisus Rio de Oro after Ike (20/10/08)
Page 2: Hotel Paradisus Rio de Oro after Ike (20/10/08)
Page 3: Hotel Paradisus Rio de Oro after Ike (20/10/08)
Page 4: Hotel Paradisus Rio de Oro after Ike (20/10/08)
Page 5: Hotel Paradisus Rio de Oro after Ike (20/10/08)
Page 6: Hotel Paradisus Rio de Oro after Ike (20/10/08)
Page 7: Hotel Paradisus Rio de Oro after Ike (20/10/08)
Page 8: Hotel Paradisus Rio de Oro after Ike (20/10/08)
Page 9: Hotel Paradisus Rio de Oro after Ike (20/10/08)
Page 10: Hotel Paradisus Rio de Oro after Ike (20/10/08)