7/28/2019 0 CANDY Vista Geral 1
1/1
Construction Computer Software www.ccssa.com Cape Town: + 27 21 465 2637 Centurion + 27 12 643 0380
Portugal +351 21 486 6440
Introduo ao CANDY
Construction Computer Software
Bill of Quantities
CCS Demonstration Job
Item Description Qty/Unit Gross Rate Gross Amount
SECTION 2: VENTILATION SHAFT
SCHEDULE NO.1: FAN FOUNDATION
EARTHWORKS
A Clear and strip site 3,600m2 1.10 3,960.00
B Excavate in bulk, Class A material anddispose within 2km freehaul distance
7,200m3 11.00 79,200.00
C Excavation in foundations ne 2m deep 750m3 9.75 7,312.50
D Excavate for working space in Class A
material and backfill and compact to95% mod. AASHTO.
440m3 6.26 2,754.40
E Excavate in class A material fortrenches and use for backfill, compact,and dispose of surplus material
260m3 17.42 4,529.20
F Extra over all excavations in Class Amaterial for Class B material
210m3 91.14 19,139.40
G Fill ing under floors and aroundfoundations in layers of 150mm,compacted to 95% mod AASHTO
7,680m3 7.93 60,902.40
H Overhaul 14,400
m3.km
0.56 8,064.00
I Dewatering of excavations 1Sum
Construction Computer SoftwareRailway Line
Standard Barchart
CCS Demonstration Job
Printed 13:53:38 12 July 2002 Page 1 of 2
Activity Description Durn Start Finish
Current
25May
8 22June
6 20July
3 17 31August
14 28Sep
12 26October
9 23November
7 21Dec
2001
4 18January
1 15February
1 15 29March
12April
2002
A220 ContractualA200 Award contract 1 18/05/2001 18/05/2001A190 Set up site 10 21/05/2001 01/06/2001
A210 Tunnel at Ch 2200 - 3450A080 Construct west tunnel portal 45 04/06/2001 03/08/2001A160 Construct east tunnel portal 45 06/08/2001 12/10/2001A090 Drive tunnel 85 06/08/2001 07/12/2001
A100 Line tunnel 85 20/08/2001 11/01/2002
A250 StructuresA150 Build bridge A 90 04/06/2001 12/10/2001A170 Station buildings 140 04/06/2001 11/01/2002A180 Build bridge B 90 10/09/2001 08/02/2002
A230 Linear operationsA260 PreparationA00 0 St ri p topsoi l Ch 0000 - 1400 20 04/06/2 001 29/0 6/2001A27 0 St ri p topsoi l Ch 1470 - 2000 8 02/07/2 001 11/0 7/2001A01 0 St ri p topsoi l Ch 8000 - 6950 15 12/07/2 001 01/0 8/2001A28 0 St ri p topsoi l Ch 6800 - 3500 47 02/08/2 001 12/1 0/2001A020 Drainage Ch 0000 - 1400 20 18/06/2001 13/07/2001A290 Drainage Ch 1470 - 2000 8 16/07/2001 25/07/2001A030 Drainage Ch 8000 - 6950 15 26/07/2001 15/08/2001A300 Drainage Ch 6800 - 3500 47 16/08/2001 26/10/2001A040 Fill Ch 0000 - 1400 20 02/07/2001 27/07/2001A310 Fill Ch 1470 - 2000 8 30/07/2001 08/08/2001A050 Fill Ch 8000 - 6950 15 09/08/2001 29/08/2001A320 Fill Ch 6800 - 3500 47 30/08/2001 09/11/2001A060 Sub Base Ch 0000 - 1400 20 16/07/2001 10/08/2001A330 Sub Base Ch 1470 - 2000 8 13/08/2001 22/08/2001A070 Sub Base Ch 8000 - 6950 15 23/08/2001 12/09/2001A340 Sub Base Ch 6800 - 3500 47 13/09/2001 23/11/2001
Award contract
Set up site
080 Construct west tunnel portal
A160 Construct east tunnel portal
A090 Drive tunnel
A100 Line tunnel
150 Build bridge A
170 Station buildings
A180 Build bridge B
0 00 St ri p to ps oi l Ch 0 00 0 - 1 40 0
A270 Strip topsoil Ch 1470 - 2000
A 010 S tr ip tops oi l C h 8000 - 6950
A280 Strip topsoil Ch 6800 - 3500
A0 20 Draina ge Ch 00 00 - 1400
A290 Drainage Ch 1470 - 2000
A030 Dr ai nage C h 8000 - 6950
A300 Drainage Ch 6800 - 3500
A040 Fill Ch 0000 - 1400
A310 Fil l Ch 1470 - 2000
A05 0 Fi ll C h 80 00 - 69 50
A320 Fill Ch 6800 - 3500
A0 60 Sub Base Ch 0 00 0 - 1 400
A330 Sub Base Ch 1470 - 2000
A0 70 S ub Ba se Ch 80 00 - 6 95 0
A340 Sub Base Ch 6800 - 3500
.
CONSTRUCTIONCOMPUTERSOFTWARE
Construction Computer Software CCS Demonstration Job incl IndirectCASHFLOW ANALYSIS SUMMARY. Code: 08 Name: Foreign Currency
-70,000,000
-60,000,000
-50,000,000
-40,000,000
-30,000,000
-20,000,000
-10,000,000
0
10,000,000
20,000,000
30,000,000
40,000,000
50,000,000
60,000,000
70,000,000
80,000,000
90,000,000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Months
Value
OutFlow
Inflow
CashFlow
CONSTRUCTIONCOMPUTERSOFTWARE
Construction Computer SoftwareRailway Line
Time Chainage Report
CCS Demonstration Job incl Indirect
25
May
8
22
June
6
20
July
3
17
31
August
14
28
September
12
26
October
9
23
Nove
mber
714
Dec
2001
18
January
1
15
February
1
15
29
March
12
26
April
10
24
May
7
21
June
2002
0
RaillinkEast
1,4
00
BridgeA
2,0
00
Eastportal
3,5
00
Westportal
5,8
00
Stationboundry
6,2
00
Stationboundry
6,8
00
BridgeB
8,0
00
RaillinkWest
trackstart
ConstructEastportal C
onstructWestportal
Drive
tunn
el
Line
tunn
el
BuildbridgeA
Stationbuildings B
uildbridgeB
StriptopsoilC
h0000-1400
Striptopsoil
StriptopsoilCh8000-6950
StriptopsoilCh6800-3500
DrainageCh00
00-1400
DrainageCh8000-6950
DrainageCh6800-3500
FillCh0000-1
400FillCh
1470-2000
FillCh8000-6950
FillCh6800-3500
SubBaseCh
0000-1400
SubBaseCh14
70-2000
SubBaseCh8000-6950
SubBaseCh6800-3500
Ballast Ch 0-2000
Ballastthr
utunnel20
00-3500
Ballastpasttunnel3500 -
6800Lay track Ch 0 - 8000
Handoverpro
. !