Tempos Padres para execuo de instalaes eltricas ( Bblia )

Digitalizada por Ricardo Andr S. Nascimento

2

tecapTtulo Eng. Civil Trabalho executado no solo.................................................................................................. Trabalho em concreto .......................................................................................................... Trabalho em pisos e paredes ................................................................................................ Diversos ............................................................................................................................... Serralheria, pintura Serralheria ........................................................................................................................... Pintura ................................................................................................................................. Instalao de equipamentos de fora e controle Painis auxiliares e mesas de comando ............................................................................... Painis carregadores de baterias .......................................................................................... Cubculos de fora ............................................................................................................... Acumuladores ...................................................................................................................... Capacitores .......................................................................................................................... Transformadores .................................................................................................................. Caixas de ligao ................................................................................................................. Botoeiras, Captores e Sinalizadores .................................................................................... Aparelhos sonoros ............................................................................................................... Motores ................................................................................................................................ Encaminhamento para cabos Fixao de suportes ............................................................................................................. Eletroduto rgido ................................................................................................................. Eletroduto flexvel .............................................................................................................. Perfilado .............................................................................................................................. Leito para cabos .................................................................................................................. Eletrocalha ........................................................................................................................... 25 27 30 30 31 33 15 16 17 18 20 20 22 23 24 25 11 13 7 8 9 11 Pg.

3

tecapTtulo Lanamento de cabos de cobre, isol. a seco Cabos de comando com ou sem blindagem......................................................................... Cabos de fora at 1000 V .................................................................................................. Cabos de fora de 3,6 KV ................................................................................................... Cabos de fora de 6 / 10 KV ............................................................................................... Cabos de fora de 8,7 / 15 KV ............................................................................................ Cabos de fora 20 / 35 KV .................................................................................................. Cabo telefnico ................................................................................................................... Fio e cabo singelo para iluminao ..................................................................................... Ligaes de cabos de cobre a seco Cabo de comando ................................................................................................................ Cabo de fora de 1000 V ..................................................................................................... Cabo de mdia tenso ......................................................................................................... Cabo telefnico ................................................................................................................... Fio e cabo singelo para iluminao ..................................................................................... Montagem de equipamentos at 600 V em painis Equipamentos de fora ........................................................................................................ Equipamentos de comando, sinalizao e proteo ............................................................ Equipamentos de comando, sinalizao e proteo, utilizando o critrio do borne til ..... Modificaes em painis existentes .................................................................................... Barramento blindado de cobre Barramento blindado de cobre para baixa tenso ............................................................... Barramento blindado de cobre para mdia tenso .............................................................. Furao de extremidade de barramento blindado de baixa ou mdia tenso ...................... 55 55 55 50 52 53 54 44 45 47 49 50 33 35 38 39 40 41 43 44 Pg.

4

tecapTtulo SubEstao de Alta Tenso ao tempo Estruturas de concreto e metlicas para suportes de equipamentos ................................... Isoladores de vidro ou porcelana ........................................................................................ Montagem de equipamentos ............................................................................................... Transformadores ................................................................................................................. Diversos .............................................................................................................................. Iluminao Iluminao comercial e residencial .................................................................................... Iluminao industrial .......................................................................................................... Iluminao externa ............................................................................................................. Postes .................................................................................................................................. Equipamentos, acessrios e servios diversos de iluminao ............................................ Aterramento Lanamentos de cabos de cobre n ..................................................................................... Conexo por solda ( Tipo Cadweld ) .................................................................................. Conexes aparafusadas atravs de conectores, grampos, terminais e etc............................ Servios diversos ................................................................................................................ Para-raio e seus acessrios ................................................................................................. Linhas areas Linhas areas at 15 KV ..................................................................................................... 72 69 70 70 71 71 61 62 64 66 67 56 57 58 59 60 Pg.

5

tecapTtulo Testes Equipamento de manobra de alta tenso............................................................................. Equipamento de manobra de mdia tenso ........................................................................ Equipamento de manobra de baixa tenso ......................................................................... Motores .............................................................................................................................. Transformadores ................................................................................................................. Rels ................................................................................................................................... TCs e TPs de mdia e baixa tenso .................................................................................. Barramentos e Cabos .......................................................................................................... Baterias, Carregadores, etc ................................................................................................. Diversos .............................................................................................................................. Manuteno Equipamento de manobra de alta tenso ............................................................................ Equipamento de manobra de mdia tenso ........................................................................ Equipamento de manobra de baixa tenso ......................................................................... Motores ............................................................................................................................... Transformadores ................................................................................................................. Rels ................................................................................................................................... TCs e TPs de mdia e baixa tenso .................................................................................. Barramentos Blindados ....................................................................................................... Baterias, Carregadores, etc ................................................................................................. Diversos .............................................................................................................................. 87 88 90 91 92 93 94 95 95 96 76 77 78 79 80 81 82 82 83 84 Pg.

6

tecapIntroduo Os tempos elementares constantes deste trabalho so expressos em Homens / horas. Eles incluem as horas realmente trabalhadas, bem como os tempos mortos ( os decimais indicam centsimos de hora ). Os tempos mortos provm de redues no ritmo de trabalho causadas por fatores diversos tais como chuvas, cafzinho, superviso insuficiente, mo-de-obra direta pouco eficiente, etc... Os tempos deste trabalho so vlidos para obras a serem realizadas no sul do pais, zona onde se encontra a melhor qualidade da mo-de-obra. Para outras reas, o oramentista dever aplicar fatores de correo que levam em conta condies climticas adversas, bem como mo-de-obra pouco produtiva. Os tempos deste trabalho foram levantados em obra de grande e mdio porte, onde os trabalhos, uma vez iniciados, progridem com uma relativa rapidez, uma vez que os servios se tornam rotineiros para o operrio. Para obras de pequeno porte, devem ser estudados coeficientes de correo. Por ltimo, alertamos que os tempos de mobilizao e desmobilizao do canteiro devem ser previstos a parte.

7

tecapAberturas de Valas ( Servio executado manualmente ) quando aps a abertura houver o reaterro aplicar um coeficiente de: 1.40 quando houver tubulaes enterradas aplicar um coeficiente de: 1.20 quando houver escoramento das paredes aplicar um coeficiente de: 1.40 ( utilizado para valas prof.. >1.20 e largura 1.30 e larg. < de 2/3 da prof. ). quando o terreno tiver quantidade aprecivel de pedras aplicar um coeficiente de: 2.30

Larg.Prof. 40 cm 60 cm 80 cm 100 cm 150 cm 200 cm

H/h por metro linear 70 cm 100 cm 150 cm EL M AJ EL M AJ EL M AJ .037 .053 .079 .054 .077 .120 .072 .103 .150 .091 .130 .190 .140 .200 .300 .180 .260 .390

8

tecapPreparao de Trincheira para Cabos Diretamente Enterrados1) Execuo de um Leito de Areia de Aproximadamente 10 cm de Espessura EL H/h p/ m M AJ .10

2) Execuo de um Leito em Concreto Magro de Aproximadamente 6 cm de Espessura EL H/h p/ m M AJ .50

Envelope de ConcretoEsto inclusos: a identificao com tinta vermelha, a abertura e reaterro de vala e concreto magro. Est excluso o lanamento dos eletrodutos ( ver captulo 4 ). H/h por metro linear 30x30 cm 40x40 cm 50x50 cm 60x60 cm 80x80 cm 100x100 cm EL M AJ EL M AJ EL M AJ EL M AJ EL M AJ EL M AJ 2 2.50 3 4 6 9

Fabricao de Concreto ( Quantidade de Componentes )Trao 1:5:10 Lastos de Pisos Envelopes Cimento Areia Mdia Pedra 2 e 3 Ferro CA-25 (1/2 A 1 ) Arame N8 Tbua de Pinho - 3 Sarrafo de Pnho 10 x 2,5mm 175 Kg 0,682m 0,982 m Quantidades por m de Concreto Trao 1:4:8 Trao 1:3:4 Lastros de Piso Sapatas Baldrames 211 Kg 0,574 m 0,945 m 315 Kg 0,642 m 0,705 m 96 Kg 240 Kg 2.4 m 4m Trao 1:3:4 Estruturas de Concreto: Lajes, vigas pilares 356 Kg 0,484 m 0,797 m 94 Kg 240 Kg 6 m 6m

9

tecapTrabalhos em concreto Est incluso: preparao de formas de madeira, enchimento de concreto e posterior retirada de madeira. Caixa de Passagem em Concreto Esto inclusos: os furos de entrada e sada dos eletrodutos e a tampa de visita e a eventual ferragem. 30x30x30 cm EL M AJ 3 3130x130x130 cm

H/h por pea 50x50x50 cm 70x70x70 cm EL M AJ EL M AJ 4 4 6 6150x150x150 cm 180x180x180 cm

100x100x100 cm

EL EL

M 9 M 30

AJ 9 AJ 30

200x200x200 cm

EL

M 11

AJ 11

EL

M 20

AJ 20

EL

M 25

AJ 25

Canaleta de Concreto Est incluso a fabricao de tampa e a abertura de vala. 20x20 cmEL M 1.50 AJ 1.50

H/h por metro linear 40x20 cm 60x30 cm 80x40 cmEL M 2.00 AJ 2.00 EL M 2.50 AJ 2.50 EL M 3.50 AJ 3.50

100x60 cmEL M 4.50 AJ 4.50

Trabalhos em pisos e paredes Furos em Piso de Concreto para Eletroduto Para o posterior acabamento com cimento aplicar um coeficiente de: 1.50 Prof. EL 10 cm M H/h por pea 20 cm EL M 30 cm M

AJ 2

AJ 3

EL

AJ 5

10

tecapFuros em Piso de Concreto para Leitos de Cabos Para o posterior acabamento com cimento aplicar um coeficiente de: 1.30 Prof. EL 10 cm M H/h por metro 20 cm EL M AJ 14 30 cm M

AJ 10

EL

AJ 18

Abertura de Canaleta no Piso de Concreto para Eletroduto Para o posterior acabamento com cimento aplicar um coeficiente de: 1.30 Est exclusa a instalao do eletroduto. EL H/h p/m. linear. p/01 eletr. M AJ 2

Abertura de Canaleta em Parede de Tijolo ou Bloco para Eletroduto Para posterior acabamento com cimento aplicar um coeficiente de: 2 Est exclusa a instalao do eletroduto EL Quebra de concreto EL H/h por m M AJ 15 H/h p/m. linear M AJ. .30

11

tecapDiversos Colocao de Pedra Britada em Subestao EL H/h p/ m M AJ .10

Fossa para leo de Transformador Esto inclusos: escavao, revestimento, fabricao de tampa e instalao de tubos coletores. Obs.: Quando a fossa serve a vrios transformadores considerar como potncia a soma de potncia dos vrios transformadores. H/h por peaTransf. de 2 MVAEL M 8 AJ 17

Transf. de 5 MVAEL M 11 AJ 24

Transf. de 10 MVAEL M 15 AJ 35

Transf. de 15 MVAEL M 17 AJ 41

Transf. de 25 MVAEL M 20 AJ 45

Transf. de 50 MVAEL M 24 AJ 56

Serralheria e Pintura De 7 a 15 eletrodutos EL H/h p/ pea M .50 AJ .50

De 2 a 4 eletrodutos H/h p/ pea EL M AJ .06 .06

De 5 a 7 eletrodutos H/h p/ pea EL M AJ .12 .12

12

tecapConfeco de Suportes para Leitos Fixao em parede Largura at 400 mm H/h p/ pea EL M AJ .45 .45 Fixao no teto 1 Leito EL M 1 1.25 H/h por pea 2 Leitos EL M AJ 1.50 1.50 1.75 1.75 3 Leitos EL M AJ 2 2 2.25 2.25 Largura de 500 a 1000 mm H/h p/ pea EL M AJ 1.50 .150

Largura at 400 mm Largura de 500 1000 mm

AJ 1 1.25

Fixao em parede para leito vertical 1 Leito EL M AJ 2.40 2.40 2.75 2.75 H/h por pea 2 Leitos EL M AJ 3 3 3.50 3.50 3 Leitos EL M AJ 4.50 4.50 5 5

Largura at 400 mm Largura de 500 1000 mm

13

tecapConfeco de Suporte para Botoeira Para fixao no piso EL Para fixao em parede EL H/h p/ pea M 1 AJ 1 H/h p/ pea M 2.50 AJ 2.50

Confeco de Base para painel EL H/h p/ metro linear M .50 AJ. .50

Confeco de Suportes Diversos EL Grandes perfilados Pequenos perfilados Pintura Aplicao com Pincel Perfilado U ( 2Kg/100 Kg de perfilado p/ 01demo ) h= 3 b= 1 h= 4 b=1 5/8 h= 6 b= 2 H/h por metro H/h por metro H/h por metro EL M AJ EL M AJ EL M AJ .10 .10 .15 .15 .24 .24 H/h p/ Kg M .15 .25 AJ .15 .25

14

tecapPerfilado L ( 2kg/100 kg de perfilado p/ 01 demo ) a= 1 a= 1 a= 2 H/h por metro EL M AJ EL M AJ EL M AJ .05 .05 .06 .06 .09 .09 Ferro Chato ( 2kg/100 kg de perfilado para 01 demo ) a= 1 a= 1 a= 2 H/h por metro EL M AJ EL M AJ EL M AJ .02 .02 .03 .03 .04 .04 a= 2 EL M .10 a= 2 EL M .05 AJ .05 AJ .10

Ferragens em Geral ( 2kg/100 kg de perfilado para um demo ) H/h por kg. de Ferro EL M AJ .02 .02 Chapa (1kg/m de chapa ( 1 face ) p/01 demo ) H/h cada m de chapa ( cada lado ) EL M .15

AJ .15

Grade metlica (1,5 kg/m de grade ( 2 faces ) p/ 01 demo ). H/h cada m de grade ( 2 lados ) EL M AJ .25 .25 Aplicao com Pistola Chapa EL H/h cada m de chapa ( cada lado ) M .10 AJ .10

15

tecapPainis Auxiliares e Mesas de Comando Servios inclusos: desembalagem, transporte dentro da obra, traado, chumbadores, fixao das bases, alinhamento, acoplamento eletro-mecnico entre painis. Tempos vlidos para instalao a nvel trreo. Painis de Rel, de Bornes, de Instrumentos, de Eletrnica, Montagem normalmente em Salas de Controle

MedidasAlt. 1100 1700 1700 2300 2300 Larg. 800 800 800 800 800 Prof. 400 400 600 400 600

Peso kg 85 120 140 160 190

EL

H/h p/ pea M 6.5 7.5 7.5 9 10

AJ 6.5 7.5 7.5 9 10

Painis Locais, Montagem no Campo, junto a Mquinas etc. Medidas Alt. 380 480 600 760 Larg. Prof. 320 380 480 600 170 220 220 220 Peso Kg. 20 30 45 60 P/ rea no classificada H-h p/ pea EL M AJ 2.5 2.5 3.0 3.0 5.0 5.0 6.5 6.5 Peso Kg. 25 50 80 90 p/ rea classificada H-h p/ hora EL M AJ 3.0 3.0 5.0 5.0 7.5 7.5 9.0 9.0

Painis de Iluminao N Cctos. p/ rea no classificada 1 Fase 2 Fase EL M AJ at 6 at 3 1 1 at 12 at 6 1 1 at 18 at 9 2 2 at 30 at 15 4 4 at 42 at 21 7.5 7.5

p/ rea classificada EL M AJ 5 5 5 5 7.5 7.5 10 10 15 15

16

tecapMesas de Comando Larg. A 600 600 600 1200 1200 1200 2000 2000 2000 Prof. B 800 800 800 800 800 800 800 800 800 C 1100 1100 1600 2100 1100 1600 2100 Altura D 1600 2100 E Peso kg 100 115 130 150 170 190 210 240 270 H/h p/ pea EL M 7.5 8 9 9 10 11 11 12 13 AJ 7.5 8 9 9 10 11 11 12 13

Painel Sintico, Tipo Mosaico EL H/h p/ m M 2 AJ 2

Painis Carregadores de Baterias ( Retificadores ) Servios inclusos: desembalagem, transporte dentro da obra, traado, chumbadores, fixao das bases, alinhamento, acoplamento eletro-mecnico entre painis. Tempos vlidos para instalao a nvel trreo. Sada Volt. Amp. 12 10 12 25 12 50 24 10 24 50 24 100 24 200 48 10 48 35 48 50 48 100 125 10 Alim. n Fases 1 1 1 1 1e3 3 3 1 1e3 1e3 3 1 Peso kg 15 30 90 25 110 180 370 35 120 150 220 55 EL H/h por pea M AJ 2.5 2.5 3.0 3.0 7.0 7.0 2.5 2.5 7.5 7.5 10.0 10.0 12.5 12.5 3.0 3.0 7.5 7.5 7.5 7.5 10.0 10.0 5.0 5.0

17

125 125 125 125 220 220 220 220 220

35 75 150 300 10 50 100 200 400

1e3 3 3 3 1e3 3 3 3 3

200 400 490 720 120 400 530 860 1300

10.0 12.5 15.0 17.5 7.5 12.5 15.0 17.5 30.0

10.0 12.5 15.0 17.5 7.5 12.5 15.0 17.5 30.0

Cubculos de Fora Servios Inclusos: desembalagem, transporte dentro da obra, traado, chumbadores, fixao das bases, alinhamento, acoplamento eletro-mecnico entre painis. Tempos validos para instalao a nvel trreo. Quadros de Distribuio de Energia em B.T. Cubculos Disjuntores Seccionadores com fusveis NH Fusveis Trif NH Disjuntores SeccIonadores com fusveis NH Fusveis Trif NH Disjuntores Seccionadores com fusveis NH Fusveis Trif NH Dimenso Alt. Larg. Prof. 1100 600 1000 1100 600 1000 1100 1100 1100 1100 1100 1100 1100 600 800 800 800 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 Cap. Amp. 1200 630 600 2000 2500 1200 4000 5000 2400 H/h p/ Cubculo EL M AJ 10 10 10 10 10 10 10 10 15 10 10 10 10 15 -

18

tecapQuadro para Comando de motores C.C.M. Tempo de Instalao para uma Coluna Coluna Tipo EL Entrada at 1600 A Entrada at 2500 A Entrada at 4000 A Sadas p/ motores e cargas H/h p/ coluna M 7.5 10.0 12.5 10.0 AJ 7.5 10.0 12.5 10.0

Cubculos Blindados para Mdia Tenso at 24kV Cubculo Para At 2 contactoes 1 Disjuntor At 2 contactores 1 Disjuntor Chave Seccionadora c/ carga Medio e Proteo Acumuladores Esto inclusos os seguintes servios: desembalagem, colocao nas bases ou estantes, conexo entre os elementos, montagem das estantes ou bases. Os elementos das baterias so considerados com o eletrlito j colocado. No caso em que o eletrlito vem separado utilizar um coeficiente k = 1.10 Dimenses Alt. Larg. Prof, 2300 1000 1200 2300 2300 2300 2300 2300 1000 1000 1000 1000 1000 1200 1500 2400 1200 1200 Cap. A 600 800 1600 2500 H/h por coluna EL M AJ 17.5 17.5 15.0 18.5 25.0 10.0 7.50 15.0 18.5 25.0 10.0 7.50

19

tecapInstalao dos Acumuladores Alcalinos ( 1,2 V p/ elemento ) A/h at 30 70 125 235 330 450 550 720 900 1100 Peso Aprox. kg 2.00 6.00 11.00 16.00 20.00 35.00 43.00 55.00 70.00 85.00 EL H/h p/ elemento M .35 .45 .60 .65 .70 .87 1.00 1.50 2.50 3.00 AJ .35 .45 .60 .65 .70 .87 1.00 1.50 2.50 3.00

Instalao dos Acumuladores Chumbo-cidos ( 2V p/ elemento ) Capac. At A/h 200 400 600 800 1100 1600 Peso Aprox. kg 25 40 50 65 90 120 EL H/h p/ elemento M .72 .95 1.40 2.30 3.00 4.00 AJ .72 .95 1.40 2.30 3.00 4.00

Instalao das Baterias Chumbo-cido Tenso V 6 6 6 6 6 6 6 12 12 12 Capa. At A/h 30 50 75 100 135 180 220 25 45 70 Peso Aprox. kg 18 21 24 27 48 63 66 22 33 48 EL H/h p/ Bateria M 2.0 2.0 2.0 2.0 2.5 3.0 3.0 2.0 2.0 2.5 AJ 2.0 2.0 2.0 2.0 2.5 3.0 3.0 2.0 2.0 2.5

20

12 12 12 Capacitores

90 110 170

63 66 72

3.0 3.0 3.0

3.0 3.0 3.0

Esto inclusos os seguintes servios: desembalagem, colocao nas bases ou suportes e fixao. No esto inclusos: ligaes eltricas e confeco dos suportes ou bases. Instalao dos Capacitores de Potncia B.T. Trifsicos at 480 VAC Potncia KVAR 3.0 7.5 15.0 25.0 40.0 50.0 60.0 100.0 Peso Aprox. kg 4 12 19 30 45 55 70 100 EL H/h p/ elemento M 1.5 1.8 2.0 2.0 2.5 2.5 3.0 3.0 AJ 1.5 1.8 2.0 2.0 2.5 2.5 3.0 3.0

Instalao dos Capacitores de Potncia Monofsico de Mdia Tenso at 15kv Potncia KVAR 25 50 100 200 Peso Aprox. kg 15 25 35 55 EL H/h p/ elemento M 2.0 2.0 2.5 2.5 AJ 2.0 2.0 2.5 2.5

Transformadores Esto inclusos os seguintes servios: descarga do caminho, colocao em base j existentes, fixao na base e bloqueio das rodas. No esto inclusos: confeco e instalao das bases, ligaes eltricas, carga no caminho e transporte.

21

tecapObs: Dever ser previsto eventualmente o aluguel de um guindaste. Tempos vlidos para instalao a nvel trreo. Trilhos e Cantoneiras Corte e instalao incluindo chumbamento de trilho e cantoneiras. EL H/h p/ kg M .10 AJ .10

Transformador a leo ou Seco Instalao em Parede Potncia KVA 5.0 10.0 15.0 25.0 37.5 Peso Aprox. kg 140 170 180 220 300 EL H/h por Pea M 5 5 7.5 7.5 10 AJ 5 5 7.5 7.5 10

Tranformador a leo Instalao em Base ou Trilhos Trifsicos MT / BT Potncia KVA 30 45 75 112.5 150 225 300 500 750 1000 1500 Peso Aprox. kg 300 400 500 650 750 1000 1200 1700 2600 3000 4200 EL H/h por pea M 2.5 2.5 4 6 5 7.5 7.5 10 15 15 25 AJ 2.5 2.5 4 6 5 7.5 7.5 10 15 15 25

22

tecapCaixas de Ligao Servios inclusos: desembalagem, transporte at ao local, demarcao, colocao dos chumbadores e fixao das caixas. Servios exclusos: furao das caixas para entrada dos eletrodutos, confeco de suportes. Obs.: Os tempos previstos so para um altura de 3 mts, para altura superior utilizar fator k = 1.3 Ref. Med. Aprox. Peterco Larg. Alt. Prof, R ou L A P WR R 75 115 80 14ap/12 R 100 140 125 14aP/14 R 140 170 145 14aP/17 R 140 275 145 14ap/27 R 140 440 145 14Ap/45 R 220 220 185 14aQ/22 R 275 220 185 14aM/22 R 275 400 185 14aM/40 R 275 550 185 14aM/55 R 275 685 185 14aM/70 R 350 400 245 14aG/40 R 350 550 245 14aG/55 H/h por pea Prova Tempo Prova Exploso EL M AJ EL M AJ .50 .50 .75 .75 .75 1.00 1.00 1.25 1.50 1.50 1.50 1.50 .50 .50 .75 .75 .75 1.00 1.00 1.25 1.50 1.50 1.50 1.50 .75 .75 1.00 1.00 1.00 1.50 1.50 1.75 2.00 2.00 2.00 2.00 .75 .75 1.00 1.00 1.00 1.50 1.50 1.75 2.00 2.00 2.00 2.00

23

R 14aG/70

350

685

245

1.75

1.75

2.50

2.50

Caixas de Ligao Redondas a Prova de Tempo Ref. Peterco R 10P R 10G Med. Aprox. Diam. Prof. 96 52 125 70 EL H/h p/ pea M .25 .25 AJ .25 .25

Caixas de Ligao Redondas com Base Quadrada Prova de Exploso Ref. Peterco WR 10P WR 10G WR 11/0 WR 11/01 WR 11/06 WR 11/03 WR 11/017110 WR 11/06729 WR 11/03738 Medidas Aprox. Diam. Prof. 90 80 150 110 90 120 140 140 180 240 140 180 245 180 240 370 415 430 EL H/h p/ pea M .35 .50 .75 1 1.50 1.50 1.50 1.75 1.75 AJ .35 .50 .75 1 1.50 1.50 1.50 1.75 1.75

Botoeiras, Captores e Sinalzadores Servios inclusos: demarcao, furao nas paredes ou suporte e fixao de suportes e aparelhos. Servios exclusos: confeco de suportes e ligaes.

24

tecapEquipamento Botoeiras com at 3 botes ou sinalzadores Botoeiras com mais de 3 botes ou sinalizadores Chave fim de curso de comando Chave fim de curso de fora Detetor de aproximao ( velocidade, rotao ) Ampermetro ou Voltmetro Aparelhos Sonoros Servios inclusos: demarcao, furao nas paredes ou suportes, fixao dos aparelhos e suportes. Servios exclusos: confeco de suportes e ligaes. Aparelhos Buzina Altofalante Telefone Interfone Prova de Tempo H/h p/ pea EL M AJ 1 1 1 1 1.50 1.50 1.50 1.50 Prova de Exploso H/h p/ pea EL M AJ 1.50 1.50 1.50 1.50 2.25 2.25 2.25 2.25 H/h por Pea Prova Tempo EL M AJ 1 1 Prova Exploso EL M AJ 1.50 1.50

1.50

1.50

2.25

2.25

1 1.50 1

1 1.50 1

1.50 2.25 1.50

1.50 2.25 1.50

1

1

1.50

1.50

25

tecapMotores ( Servio normalmente feito pela mecnica ) Servios inclusos: transporte do almoxarifado at ao lugar de instalao, colocao e alinhamento na base j existente, fixao na base e fechamento do acoplamento. Servios exclusos: ligao eltrica, eletrodutos flexveis. Potncia CV 5 10 50 100 200 Peso Aprox. kg 60 80 250 500 700 EL H/h p/ pea M 3 8 15 18 20 AJ 3 8 15 18 20

Fixao de suportes Esto inclusos: marcao do local, solda eventual, fixao dos chumbadores, fixao do suporte e nivelamento. Est excluso: a fabricao Tempos vlidos para montagem at 3m de altura. Usar um coeficiente de 1.20 para altura entre 3 e 7 m e 1.50 entre 7 e 10 mSuporte para feixe de eletrodutos At 300 mm de comp. De 300 a 600 mm de comp. Suporte para eletroduto individual

EL

H/h p/ pea M .20 .30 .15

AJ .20 .30 .15

26

tecapELSuporte para eletroduto utilizando perfilado 38x38 Comp. 100 mm Comp. de 100 mm e 300 mm Comp. de 300 mm e 600 mm Suporte para leito ou bandeja ou feixe de eletroduto tipo mo francesa para: 1 Leito at 500 mm 1 Leito acima de 500 mm 2 Leitos at 500 mm 2 Leitos acima de 500 mm 3 e 4 Leitos de 500 mm 3 e 4 Leitos acima de 500 mm 5 e 6 Leitos at 500 mm 5 e 6 Leitos acima de 500 mm Suporte para leito ou bandeja ou feixe de eletroduto tipo vergalho para: 1 leito at 500 mm 1 leito acima de 500 mm 2 leitos at 500 mm 2 leitos acima de 500 mm 3 e 4 leitos at 500 mm 3 e 4 leitos acima de 500 mm 5 e 6 leitos at 500 mm 5 e leitos acima de 500 mm Suporte para leito ou bandeja tipo U ( usado para leitos verticais ) para : 1 leito at 500 mm 1 leito acima de 500 mm 2 leitos at 500 mm

H/h p/ pea M

AJ

.15 .20 .30

.15 .20 .30

.50 .60 .65 .70 .80 .90 1.00 1.20

.50 .60 .65 .70 .80 .90 1.00 1.20

.75 .80 .90 .95 1.00 1.10 1.15 1.25

.75 .80 .90 .95 1.00 1.10 1.15 1.25

.65 .75 1.30

.65 .75 1.30

272 leitos acima de 500 mm 3 e 4 leitos at 500 mm 3 e 4 leitos acima de 500 mm 5 e 6 leitos at 500 mm 5 e 6 acima de 500 mm Suporte para perfilado 38x38 ou eletroduto Suporte para eletrocalha de largura: At 150 mm At 300 mm

1.40 1.60 1.70 1.90 2.00 .12

1.40 1.60 1.70 1.90 2.00 .12

.15 .20

.15 .20

Acima de 300mm normalmente usam-se suportes similares aos usados nos leitos. Eletroduto rgido Esto inclusos: Transporte at o local, abertura de rosca ou colagem, fixao das braadeiras, montagem dos eletrodutos com luvas. Est excluso: a montagem de acessrios tais como: caixas, conduletes, prensacabos, unies, fixao e fabricao de suportes. Nota: Quando o eletroduto for instalado a altura entre 3m e 7m usar coeficiente de: 1.20 e entre 7m e 10m usar 1.50.Eletroduto de ao tipo leve para instalar embutido em alvenaria ( piso ou parede ), confeco de curvas incluso, de:

EL

H/h p/ m. M

AJ

e 1 e 1 1 e 2Abertura de canaleta em parede de tijolo ou blocos Fechamento de canaleta em parede de tijolos ou blocos Eletroduto de PVC, com juntas para colagem, para instalar

.22 .40 .60

.22 .40 .60 .30 .40

28em alvenaria ( piso ou parede ), confeco de curva incluso, de:

e 1 e 1 1 e 2Abertura de canaleta em parede de tijolo ou blocos para eletroduto Fechamento de canaleta em parede de tijolo ou blocos para eletroduto

.22 .40 .60

.22 .40 .60 .30 .40

Eletroduto de ao galvanizado tipo leve para instalao exposta, confeco de curvas inclusas. Dimenso Trechos c/ comp. superior a 3m H/h por m. EL M AJ .22 .22 .35 .35 .39 .39 .42 .42 .50 .50 Trechos c/ comp. inferior a 3m H/h por m. EL M AJ .27 .27 .47 .47 .55 .55 .62 .62 .75 .75

e 1 1 1 2

Eletroduto de ao galvanizado tipo pesado ( schedule ou similar ) para instalao exposta, inclusa a fabricao de curvas. Dimenso Trecho c/ comp. superior a Trecho c/ comp. inferior a 3m 3m H/h p/ m. H/h p/ m. EL M AJ EL M AJ .30 .30 .50 .50 .35 .35 .55 .55 1 .45 .45 .65 .65 1 .50 .50 .75 .75 1 .55 .55 .80 .80 2 .65 .65 .90 .90 3 .75 .75 1.00 1.00 4 .95 .95 1.25 1.25

29

tecapConfeco de curva para eletroduto em ao galvanizado tipo pesado ( schedule 40 ou similar ), utilizando mquina hidrulica, de:Bitola H/h por pea EL M AJ .28 .28 .32 .32 Bitola 1 1 H/h por pea EL M AJ .37 .37 .40 .40 Bitola 1 2 H/h por pea EL M AJ .42 .42 .50 .50 Bitola 3 4 H/h por pea EL M AJ .70 .70 .90 .90

Eledroduto de PVC tipo pesado para instalao exposta, incluindo a fabricao de curvas. Dimenso 1 1 1 2Trecho c/ comp. superior a 3m Trecho c/ comp. inferior a 3m

EL

H/h p/ m M .20 .22 .35 .38 .42 .50

AJ .20 .22 .35 .38 .42 .50

EL

H/h p/ m M .25 .27 .47 .55 .62 .70

AJ .25 .27 .47 .55 .62 .70

Eletroduto de PVC ou fibra-cimento, para instalao enterrada em banco de dutos, incluindo a estrutura de ferro ou madeira para sustentaes. Exclusa a concretagem. Ver item abertura da vala. H/h por metro 2 3 4 5 6 EL M AJ EL M AJ EL M AJ EL M AJ EL M AJ .25 .25 .30 .30 .35 .35 .40 .40 .45 .45 Montagem de acessrios de eletroduto tais como conduletes, unies, unidades, seladoras ( sem a massa ), prensa-cabos e etc. , , 1 EL M AJ .13 .13 H/h por pea 1 , e 1 2 EL M AJ EL M .15 .15 .17 3 e 4 EL M AJ .20 .20

AJ .17

30

tecapEletrodutos Flexveis Esto inclusos: Transporte at o local, montagem do eletroduto flexvel pr-fabricado ( tempo de preparao de um flexvel no fabricado fornecido parte ). Instalao de eletroduto flexvel prova de tempo, constitudo por fita de ao em espiral, revestido por PVC, comprimento varivel entre 0.5m e 1.5 m, de:Bit. H/h p/ pea EL M AJ .25 .25 Bit. 1 1 H/h p/ pea EL M AJ .30 .30 Bit. 1 2 H/h p/ pea EL M AJ .35 .35 Bit. 3 H/h p/ pea EL M AJ .40 .40 Bit. 4 H/h p/ pea EL M AJ .55 .55

Instalao de eletroduto flexvel prova de exploso com capa externa de arame tranado, comprimento varivel entre 0.5m e 1.5mBit. H/h p/ pea EL M AJ .30 .30 Bit. 1 1 H/h p/ pea EL M AJ .33 .33 Bit. 1 2 H/h p/ pea EL M AJ .37 .37 Bit. 3 H/h p/ pea EL M AJ .45 .45 Bit. 4 H/h p/ pea EL M AJ .65 .65

Fabricao de um eletroduto flexvel a prova de tempo, com comprimento varivel entre 0.5 m e 1.5m, utilizando tubo construdo por fita de ao em espiral, revestida de PVC e conectores nas extremidades de:Bit. H/h p/ pea EL M AJ .12 .12 Bit. 1 1 H/h p/ pea EL M AJ .15 .15 Bit. 1 2 H/h p/ pea EL M AJ .17 .17 Bit. 3 H/h p/ pea EL M AJ .20 .20 Bit. 4 H/h p/ pea EL M AJ .25 .25

Perfilado Esto inclusos: Transporte at o local, fixao do perfilado no suporte j instalado ou com fixador e junes nas emendas. Est excluso: a fixao do suporte.

31

tecapObs.: Tempos vlidos para montagem at 3m. Quando for montado a altura entre 3 e 07 m usar um coeficiente de 1.20 e entre 7 e 10m usar 1.50. H/h p/ metro EL Perfilado 38x38mm liso ou perfurado Colocao de tampa Base para perfilado 38x38 mm Derivao de perfilado 38x38 mm para eletroduto Caixa de derivao para perfilado 38x38 mm Caixa com tomada ou fusvel para perfilado 38x38 mm Leito para Cabos Transporte at o local, fixao do leito no suporte, emendas e eventual colocao de tampa. Esto exclusos: Fixao de suporte, modificaes de peas. M .18 .04 .50 .10 AJ .18 .04 .50 .10

.15

.15

.10

.10

32

tecapObs.: Tempos vlidos para montagem at 3m. Quando for montado a altura entre 3 e 07m usar um coeficiente de 1.20 e entre 7 e 10m usar 1.50. Leito Pr-fabricado, Tipo Leve ou Mdio, Aba 75mm Largura Mont. Leito Coloc. tampa 200 e 300mm EL M AJ .45 .45 .04 .04 H/h por metro 400 e 500mm 600 e 700mm EL M AJ EL M AJ .55 .55 .58 .58 .05 .05 .06 .06 800 e 1000m EL M AJ .70 .70 .07 .07

Curvas, Cruzetas, T, Redues, etc. Para Leito Tipo Leve ou Mdio, aba 75mm Largura Mont. pea 200 e 300mm EL M AJ .55 .55 H/h por pea 400 e 500mm 600 e 700mm 800 e 1000mm EL M AJ EL M AJ EL M AJ .65 .65 .70 .70 .80 .80

Leito Pr-fabricado, tipo pesado, aba 100mm H/h por metro Largura Mont. Leito Coloc. tampa200,300 e 400mm 500,600 e 700mm 800 e 1000mm 1200 e 1500mm

EL

M .65 .06

AJ .65 .06

EL

M .70 .07

AJ .70 .07

EL

M .80 .08

AJ .80 .08

EL

M .90 .09

AJ .90 .09

33

tecapCurvas, Cruzetas, T, Redues, etc. Para Leito Tipo Pesado, Aba 100mm H/h por metro Largura Mont. Pea Coloc. tampa Eletrocalha Esto inclusos: Transporte at o local, fixao da calha no suporte, emendas e eventual colocao de tampa. Esto exclusos: Fixao dos suportes, modificao de peas. Obs.: Tempos vlidos para montagem at 3m. Quando for montada a altura entre 3 e 07m, usar um coeficiente de 1.20 e entre 7 e 10m usar 1.50. Eletrocalha Lisa ou Perfurada H/h por metro Largura Mont. Eletrocalha Coloc. tampa50 a 100mm 125 a 200mm 250 a 400mm 500 a 700mm 200,300 e 400mm 500,600 e 700mm 800 e 1000mm 1200 e 1500mm

EL

M AJ EL M AJ EL M AJ EL M AJ .75 .75 .80 .80 .90 .90 1.00 1.00 .07 .07 .08 .08 .09 .09 .10 .10

EL

M AJ EL M AJ EL M AJ EL M AJ .25 .25 .30 .30 .42 .42 .65 .65 .02 .02 .03 .03 .04 .04 .07 .07

34

tecapCurvas, Cruzetas, T, Redues, etc. Para eletrocalha Lisa ou Perfurada Largura Mont. Eletrocalha H/h por pea 50 a 100mm 125 a 200mm 250 a 400mm 500 a 700mm EL M AJ EL M AJ EL M AJ EL M AJ .30 .30 .35 .35 .50 .50 .75 .75

Lanamento de Cabos de Cobre, Isolamento a seco Est incluso: transporte do cabo at o local, lanamento do cabo com medio do comprimento, identificao do cabo, fixao no leito, cobertura de proteo e placa de aviso para cabo diretamente enterrado, estrutura para suporte ( ferro ou madeira ) para dutos de concreto, devoluo do carretel. Est excluso: abertura e reaterro de vala para cabo diretamente enterrado. Nota: - Para altura superior a 3m utilizar um coeficiente de: 1.30 Os tempos dos cabos de fora so vlidos para os cabos mais usuais tais como: Sintenax, Epotenax e Voltane. Para os cabos especiais calcular o tempo comparando o peso. - Para cabos armados ( espiral ou malha externa de ao ) usar um coeficiente de: 1.5 para cabos de Baixa Tenso 1.2 para cabos de Mdia Tenso Seco 1,5 mm = 14 AWGN de Cont. 2 3 4 5 7 9 12 15 19 24 30 EL .026 .028 .029 .030 .032 .033 .035 .037 .039 .040 .042 Em eletrod. H/h p/ m. M AJ .104 .112 .116 .120 .128 .132 .140 .148 .156 .160 .168 EL .026 .028 .029 .030 .032 .034 .036 .038 .040 .042 .044 Em leito H/h p/ m. M AJ .104 .112 .116 .120 .128 .136 .144 .152 .160 .168 .176 Em canaleta alvenaria H/h p/ m. EL M AJ .012 .048 .014 .056 .014 .056 .015 .060 .016 .064 .018 .072 .020 .080 .021 .084 .022 .088 .023 .092 .024 .096 Em banco de dutos EL .026 .028 .029 .030 .032 .034 .036 .038 .040 .042 .044 H/h p/ m. M AJ .104 .112 .116 .120 .128 .136 .144 .152 .160 .168 .176 Diretamente Enterrados H/h p/ m. EL M AJ .012 .048 .014 .056 .014 .056 .015 .060 .016 .064 .018 .072 .020 .080 .021 .084 .022 .088 .023 .092 .024 .098

35

tecapSeco 2,5 mm = 12 AWGN de Cont. 2 3 4 5 7 9 12 15 19 24 30 36 EL .026 .028 .030 .032 .034 .035 .039 .041 .042 .048 .049 .050 Em eletrod. H/h p/ m. M AJ .104 .112 .120 .128 .136 .140 .156 .164 .168 .192 .196 .200 EL .026 .028 .030 .032 .034 .036 .040 .042 .044 .050 .052 .054 Em leito H/h p/ m. M AJ .104 .112 .120 .128 .136 .144 .160 .168 .176 .200 .208 .215 Em canaleta alvenaria H/h p/ m. EL M AJ .012 .048 .014 .056 .016 .064 .017 .068 .018 .072 .020 .080 .022 .088 .023 .092 .024 .096 .026 .104 .027 .108 .028 .112 Em banco de dutos EL .026 .028 .030 .032 .034 .036 .040 .042 .044 .050 .052 .054 H/h p/ m. M AJ .104 .112 .120 .128 .136 .144 .160 .168 .178 .200 .208 .216 Diretamente Enterrados H/h p/ m. EL M AJ .012 .049 .014 .058 .016 .064 .017 .068 .018 .072 .020 .080 .022 .088 .023 .092 .024 .096 .026 .104 .027 .108 .028 .112

Seco 4 mm = 10 AWGN de Cont. 2 3 4 5 7 9 12 15 19 24 30 EL .030 .032 .034 .036 .037 .039 .040 .044 .048 .049 .050 Em eletrod. H/h p/ m. M AJ .120 .128 .136 .144 .148 .156 .160 .176 .192 .196 .200 EL .030 .032 .034 .036 .038 .040 .042 .046 .050 .052 .054 Em leito H/h p/ m. M AJ .120 .128 .136 .144 .152 .160 .168 .184 .200 .203 .216 Em canaleta alvenaria H/h p/ m. EL M AJ .014 .056 .016 .064 .018 .072 .020 .080 .022 .088 .023 .092 .024 .096 .025 .100 .026 .104 .028 .112 .030 .120 Em banco de dutos EL .030 .032 .034 .036 .038 .040 .042 .046 .050 .052 .054 H/h p/ m. M AJ .120 .128 .136 .144 .152 .160 .168 .184 .200 .208 .216 Diretamente Enterrados H/h p/ m. EL M AJ .014 .056 .016 .064 .018 .072 .020 .080 .022 .088 .023 .092 .024 .096 .025 .100 .026 .104 .028 .112 .030 .120

Cabo Fora at 1000 VSeco Em mm1.5 1.5 1.5 1.5 2.5 2.5 2.5 2.5 4 4 4 4 6 6 6 6 10 10

Sec. Em AWG ou MCM16 e 14 16 e 14 16 e 14 16 e 14 14 e 12 14 e 12 14 e 12 14 e 12 12 e 10 12 e10 12 e 10 12 e 10 10 e 8 10 e 8 10 e 8 10 e 8 8e6 8e6

N de Cond. EL1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 .022 .026 .028 .030 .022 .028 .030 .032 .024 .032 .032 .034 .026 .032 .034 .038 .028 .038

Em eletroduto H/h p/ m M AJ.038 .104 .112 .120 .088 .112 .120 .128 .096 .128 .128 .136 .104 .125 .136 .152 .112 .152

Em Leito EL.022 .026 .028 .030 .022 .028 .030 .032 .024 .032 .032 .034 .026 .032 .034 .038 .028 .038

H/h p/ m M

AJ.088 .104 .112 .120 .088 .112 .120 .128 .096 .128 .123 .136 .104 .128 .136 .152 .112 .152

Em canaleta de alvenaria H/h p/ m EL M AJ.012 .014 .014 .016 .012 .014 .016 .016 .012 .016 .016 .018 .014 .016 .018 .020 .014 .020 .048 .056 .056 .064 .048 .056 .064 .064 .048 .064 .064 .072 .056 .064 .072 .080 .056 .080

3610 10 16 16 16 16 25 25 25 25 35 35 35 35 50 50 50 50 70 70 70 95 95 95 95 120 120 120 120 150 150 150 150 185 185 185 185 240 240 240 240 300 300 300 300 400 500 630 800 1000 8e6 8e6 6e4 6e4 6e4 6e4 4e2 4e2 4e2 4e2 2 2 2 2 1/0 1/0 1/0 1/0 2/0 2/0 2/0 3/0 e 4/0 3/0 e 4/0 3/0 e 4/0 3/0 e 4/0 250 250 250 250 300 300 300 300 350 e 400 350 e 400 350 e 400 350 e 400 400 e 500 400 e 500 400 e 500 400 e 500 600 600 600 600 800 1000 1250 1500 2000 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 1 1 1 1 .039 .043 .032 .041 .043 .047 .034 .045 .047 .051 .036 .047 .053 .063 .039 .055 .063 .076 .043 .078 .093 .047 .087 .095 .104 .049 .095 .103 .117 .057 .103 .113 .133 .065 .113 .130 .171 .080 .135 .173 .198 .089 .171 .189 .270 .097 .112 .130 .155 .184 .156 .172 .128 .164 .172 .188 .136 .180 .188 .204 .144 .188 .212 .252 .156 .220 .252 .304 .172 .312 .372 .188 .348 .380 .416 .196 .380 .412 .408 .228 .412 .452 .532 .260 .452 .520 .684 .320 .540 .692 .792 .356 .684 .756 1.08 .338 .448 .520 .620 .736 .040 .044 .032 .042 .044 .048 .034 .046 .050 .054 .036 .050 .056 .066 .040 .058 .068 .082 .044 .084 .100 .050 .094 .102 .116 .052 .102 .114 .130 .060 .114 .126 .148 .070 .126 .144 .190 .086 .150 .192 .220 .096 .190 .210 .300 .108 .124 .144 .172 .204 .160 .176 .128 .168 .176 .192 .136 .134 .200 .216 .144 .200 .224 .264 .160 .252 .264 .328 .176 .336 .400 .200 .376 .408 .464 .208 .408 .456 .520 .240 .456 .504 .592 .250 .504 .576 .760 .344 .600 .768 .380 .384 .760 .840 1.20 .432 .496 .576 .638 .816 .022 .024 .016 .022 .024 .026 .018 .024 .026 .028 .020 .026 .030 .032 .022 .030 .032 .038 .024 .044 .050 .026 .048 .050 .060 .028 .052 .062 .072 .030 .056 .070 .088 .034 .070 .086 .120 .044 .090 .120 .130 .048 .120 .126 .170 .060 .068 .086 .106 .124 .088 .096 .064 .088 .096 .104 .072 .096 .104 .112 .080 .104 .120 .128 .088 .120 .128 .132 .048 .176 .200 .104 .184 .200 .240 .112 .208 .248 .288 .120 .224 .280 .352 .136 .280 .344 .480 .176 .380 .480 .520 .192 .480 .504 .680 .240 .272 .344 .424 .496

37

tecapCabo Fora at 1000 VSeco Em mm1.5 1.5 1.5 1.5 2.5 2.5 2.5 2.5 4 4 4 4 6 6 6 6 10 10 10 10 16 16 16 16 25 25 25 25 35 35 35 35 50 50 50 50 70 70 70 95 95 95 95 120 120 120 120 150 150 150 150 185 185

Sec. Em AWG ou MCM16 e 14 16 e 14 16 e 14 16 e 14 14 e 12 14 e 12 14 e 12 14 e 12 12 e 10 12 e10 12 e 10 12 e 10 10 e 8 10 e 8 10 e 8 10 e 8 8e6 8e6 8e6 8e6 6e4 6e4 6e4 6e4 4e2 4e2 4e2 4e2 2 2 2 2 1/0 1/0 1/0 1/0 2/0 2/0 2/0 3/0 e 4/0 3/0 e 4/0 3/0 e 4/0 3/0 e 4/0 250 250 250 250 300 300 300 300 350 e 400 350 e 400

N de Cond.1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2

Em banco de dutos H/h p/ m EL M AJ.022 .026 .028 .030 .022 .028 .030 .032 .024 .032 .032 .034 .026 .032 .034 .038 .028 .038 .040 .044 .032 .042 .044 .048 .034 .046 .050 .054 .036 .050 .056 .086 .040 .058 .100 .082 .044 .084 .100 .050 .094 .102 .116 .052 .102 .114 .130 .060 ..114 .126 .148 .070 .126 .088 .104 .112 .120 .086 .112 .120 .128 .096 .128 .128 .136 .152 .112 .152 .160 .176 .128 .108 .176 .128 .168 .176 .192 .136 .134 .200 .216 .144 .200 .224 .264 .100 .116 .336 .400 .200 .376 .408 .464 .208 .408 .456 .520 .240 .456 .504 .592 .280 .504

Diretamente enterrado H/h p/ m EL M AJ.012 .014 .014 .016 .012 .014 .016 .016 .012 .016 .016 .018 .014 .016 .018 .020 .014 .020 .022 .024 .016 .022 .024 .026 .013 .024 .026 028 .020 .026 .030 .032 .022 0.44 .050 .026 .046 .050 .060 .028 .052 .062 .072 .030 .056 .070 .088 .034 .070 .048 .056 .056 .064 .048 .056 .064 .064 .072 .056 .064 .072 .056 .064 .072 .080 .056 .080 .088 .096 .064 .088 .096 .104 .072 .096 .104 .112 .080 .104 .120 .128 .176 .200 .104 .184 .200 .240 .112 .208 .246 .288 .120 .224 .280 .352 .136 .280

382 9 2 4 1 .3 5 2 10 1 3 1 3 .7 5 e 10 3 7 8 5 2 3 .4 0 / 10 5 0 7 3 3 .4 0 /0 1 0 /e 9 0 4 7 9 3 3 .4 5 4 3 .9 0 0 /e 1 0 1 94 0 55 8 / 3 0 1 2 1 .5 2 3 1 .2 00 31 1 3 3 .6 55 10 00 0 5 1 3 3 .7 85 1 5e 3 1 4 1 .5 80 0 50 2 e 7 2 4 31 40 9 00 3 e 2 4 1 .7 45 1 00 0 e 4 3 5 1 .9 0 6 3 .0 0 32 41 1 00 5 58 7 0 6 .8 .4 10 66 20 40 .5 .7 10 2 38 .7 .4 10 07 31 66 .8 .4 10 39 .8 .4 1 .5 91 68 .3 .2 40 42 .9 .6 21 23 1 40 .5 .3 20 25 47 07 0 .8 .6 21 .1 .7 61 20 .4 1 39 80 4 .0 .9 71 87 .7 .0 3 .5 68 92 01 .2 3 41 4 60 8 185 .0 .2 .8 10 1 30 0 46 8 .6 .4 .6 10 0 65 4 34 1 .7 .2 .9 10 2 47 2 35 1 .8 .2 .0 10 2 69 8 42 1 33 2 28 6 .9 .2 .0 2 .6 .3 00 2 88 7 .9 .3 .3 40 1 2 1852 .4 .7 .0 20 1 65 2 58 3 86 2 .6 .3 .4 20 1 42 9 .0 .4 .6 30 3 8 .8 .9 .7 60 2 02 8 .7 1 4 33 2 68 2 .8 .0 .3 7 .5 .0 240 .0 .5 .4 41 5 46 0 10 2 .7 0 2 43 6 5 56 8 27 8 07 2 240 240 240 300 300 300 300 400 500 630 800 1000 350 e 400 350 e 400 400 e 500 400 e 500 400 e 500 400 e 500 600 600 600 600 800 1000 1250 1500 2000 3 4 1 2 3 4 1 2 3 4 1 1 1 1 1 .144 .190 .082 .150 .192 .220 .096 .190 .210 .300 .108 .124 .144 .172 .204 .576 .760 .344 .600 .768 .880 .384 .760 .840 1.20 .432 .496 .576 .668 .816 .086 .120 .044 .090 .120 .130 .048 .120 .126 .170 .060 .068 .086 .106 .124 .344 .480 .176 .360 .480 .520 .192 .480 .504 .680 .240 .272 .344 .424 .496

Cabo de Fora de 3,6 / 6 KVSeco Em mm10 10 16 16

Sec. Em AWG ou MCM8e6 8e6 6e4 6e4

N de Cond. EL1 3 1 3 .035 .051 .038 .059

Em eletroduto H/h p/ m M AJ.140 .204 .152 .236

Em Leito EL.035 .054 .038 .062

H/h p/ m M

AJ.140 .216 .152 .248

Em canaleta de alvenaria H/h p/ m EL M AJ.019 .029 .020 .034 .076 .116 .080 .136

39

tecapSeco Em mm10 10 16 16 25 25 35 35 50 50 70 70 95 95 120 120 150 150 185 185 240 240 300 300 400 500

Cabo de Fora de 3,6 / 6 KVEm banco de dutos H/h p/ m EL M AJ.035 .054 .038 .062 .040 .076 .044 .084 .046 .097 .049 .108 .052 .123 .061 .137 .066 .150 .077 .170 .094 .197 .101 .250 .118 .130 .140 .216 .152 .248 .160 .304 .176 .336 .184 .338 .196 .432 .208 .492 .246 .548 .264 .600 .308 .680 .376 .768 .404 1.00 .472 .520

Sec. Em AWG ou MCM8e6 8e6 6e4 6e4 4e2 4e2 2 2 1/0 1/0 2/0 2/0 3/0 e 4/0 3/0 e 4/0 250 250 300 300 350 e 400 350 e 400 400 e 500 400 e 500 600 600 800 1000

N de Cond.1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3

Diretamente enterrados H/h p/ m EL M AJ.014 .029 .020 .034 .022 .042 .024 .046 .025 .053 .027 .059 .028 .068 .033 .075 .036 .083 .042 .093 .052 .108 .056 .137 .065 .072 .076 .116 .080 .136 .088 .168 .096 .184 .100 .212 .108 .236 .112 .272 .132 .300 .144 .332 .168 .372 .208 .432 .224 .548 .260 .288

Cabo de Fora de 6 / 10 KVSeco Em mm16 16 25 25 35 35 50 50 70 70 95 95 120 120 150 150 185

Sec. Em AWG ou MCM6e4 6e4 4e2 4e2 2 2 1/0 1/0 2/0 2/0 3/0 e 4/0 3/0 e 4/0 250 250 300 300 350 e

N de Cond. EL1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 .039 .072 .042 .083 .044 .093 .046 .096 .048 .104 .054 .117 .059 .133 .069 .146 .076

Em eletroduto H/h p/ m M AJ.156 .288 .168 .332 .176 .372 .184 .384 .192 .416 .216 .468 .236 .532 .276 .584 .304

Em Leito EL.040 .077 .043 .089 .045 .100 .048 .107 .051 .116 .057 .130 .062 .148 .074 .162 .082

H/h p/ m M

AJ.160 .308 .172 .356 .180 .400 .192 .428 .204 .464 .228 .520 .248 .592 .296 .648 .328

Em canaleta de alvenaria H/h p/ m EL M AJ.022 .042 .024 .049 .025 .055 .026 .059 .028 .064 .031 .072 .034 .081 .041 .089 .045 .088 .168 .096 .196 .100 .220 .104 .236 .112 .256 .124 .288 .136 .324 .164 .356 .180

40185 240 240 300 400 350 e 400 400 e 500 400 e 500 600 3 1 3 1 .176 .088 .182 .096 .704 .352 .728 .384 .195 .095 .202 .103 .780 .380 .808 .412 .107 .052 .111 .057 .428 .208 .444 .228

Cabo de Fora de 6 / 10 KVSeco Em mm16 16 25 25 35 35 50 50 70 70 95 95 120 120 150 150 185 185 240 240 300

Sec. Em AWG ou MCM6e4 6e4 4e2 4e2 2 2 1/0 1/0 2/0 2/0 3/0 e 4/0 3/0 e 4/0 250 250 300 300 350 e 400 350 e 400 400 e 500 400 e 500 600

N de Cond.1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3 1

Em banco de dutos H/h p/ m EL M AJ.040 .077 .043 .089 .045 .100 .048 .107 .051 .116 .057 .130 .062 .148 .074 .162 .082 .195 .095 .202 .103 .160 .308 .172 .356 .180 .400 .192 .428 .204 .464 .228 .520 .248 .592 .296 .648 .328 .780 .380 .808 .412

Diretamente enterrado H/h p/ m EL M AJ.022 .042 .024 .049 .025 .055 .026 .059 .028 .064 .031 .072 .034 .081 .041 .089 .045 .107 .052 .111 .057 .088 .168 .096 .196 .100 .220 .104 .236 .112 .256 .124 .288 .136 .324 .164 .356 .180 .428 .208 .494 .228

Cabo de Fora de 8,7 / 15 KVSeco Em mm16 16 25 25 35 35 50 50 70 70 95 95 120 120

Sec. Em AWG ou MCM6e4 6e4 4e2 4e2 2 2 1/0 1/0 2/0 2/0 3/0 e 4/0 3/0 e 4/0 250 250

N de Cond. EL1 3 1 3 1 3 1 3 1 3 1 3 1 3 .045 .096 .047 .099 .047 .099 .048 .110 .050 .115 .058 .131 .069 .149

Em eletroduto H/h p/ m M AJ.180 .384 .188 .396 .188 .396 .192 .440 .200 .460 .232 .524 .276 .596

Em Leito EL.046 .103 .048 .106 .049 .110 .051 .122 .053 .128 .061 .146 .074 .166

H/h p/ m M

AJ.184 .412 .192 .424 .196 .440 .204 .488 .212 .512 .244 .584 .296 .664

Em canaleta de alvenaria H/h p/ m EL M AJ.025 .057 .026 .058 .027 .061 .028 .067 .029 .070 .034 .080 .041 .091 .100 .228 .104 .232 .108 .244 .112 .268 .116 .280 .136 .320 .164 .364

41150 150 185 185 240 240 300 300 400 500 300 300 350 e 400 350 e 400 400 e 500 400 e 500 600 600 800 1000 1 3 1 3 1 3 1 3 1 3 .073 .177 .081 .184 .093 .214 .099 .261 .113 .128 .292 .708 .324 .736 .372 .856 .396 1.04 .452 .512 .079 .197 .087 .204 .100 .238 .106 .290 .126 .142 .316 .788 .348 .816 .400 .952 .424 1.16 .504 .568 .043 .108 .048 .112 .055 .131 .058 .160 .069 .078 .172 .432 .192 .448 .220 .524 .232 .540 .276 .312

Cabo de Fora de 8,7 / 15 KVSeco Em mm16 16 25 25 35 35 50 50 70 70 95 95 120 120 150 150 185 185 240 240 300 300 400 500

Sec. Em AWG ou MCM6e4 6e4 4e2 4e2 2 2 1/0 1/0 2/0 2/0 3/0 e 4/0 3/0 e 4/0 250 250 300 300 350 e 400 350 e 400 400 e 500 400 e 500 600 600 800 1000

N de Cond.1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3

Em banco de dutos H/h p/ m EL M AJ.046 .103 .048 .106 .049 .110 .051 .122 .053 .128 .061 .146 .074 .166 .079 .191 .087 .204 .100 .238 .106 .290 .126 .142 .184 .412 .192 .424 .196 .440 .204 .488 .212 .512 .244 .584 .296 .664 .316 .788 .348 .816 .400 .952 .424 1.16 .504 .563

Diretamente Enterrado H/h p/ m EL M AJ.025 .057 .026 .058 .027 .061 .028 .067 .029 .070 .034 .080 .041 .091 .043 .108 .048 .112 .055 .131 .058 .160 .069 .078 .100 .228 .104 .232 .108 .244 .112 .268 .116 .280 .136 .320 .164 .364 .172 .432 .192 .448 .220 .524 .232 .640 .276 .312

Cabo de Fora 20/35 KVSeco Em mm25 25 35 35 50 50 70

Sec. Em AWG ou MCM4e2 4e2 2 2 1/0 1/0 2/0

N de Cond. EL1 3 1 3 1 3 1

Em eletroduto H/h p/ m M AJ EL

Em Leito H/h p/ m M AJ

Em canaleta de alvenaria H/h p/ m EL M AJ

.049 .126 .058 .139 .061

.196 .504 .232 .556 .244

.052 .140 .061 .154 .064

.208 .560 .244 .616 .256

.029 .077 .034 .085 .035

.116 .308 .136 .340 .140

4270 95 95 120 120 150 150 185 185 240 240 300 400 500 2/0 3/0 e 4/0 3/0 e 4/0 250 250 300 300 350 e 400 350 e 400 400 e 500 400 e 500 600 800 1000 3 1 3 1 3 1 3 1 3 1 3 1 1 1 .106 .119 .136 .424 .476 .544 .118 .132 .151 .472 .528 .604 .065 .073 .083 .260 .292 .332 .097 .388 .108 .432 .059 .236 .149 .072 .174 .080 .179 .087 .198 .090 .596 .288 .696 .320 .716 .348 .792 .360 .166 .077 .193 .189 .199 .094 .220 .097 .664 .308 .772 .344 .796 .376 .880 .388 .091 .042 .106 .047 .109 .052 .121 .053 .364 .168 .424 .188 .436 .208 .484 .212

Cabo de Fora 20/35 KVSeco Em mm25 25 35 35 50 50 70 70 95 95 120 120 150 150 185 185 240 240 300 400 500

Sec. Em AWG ou MCM4e2 4e2 2 2 1/0 1/0 2/0 2/0 3/0 e 4/0 3/0 e 4/0 250 250 300 300 350 e 400 350 e 400 400 e 500 400 e 500 600 800 1000

N de Cond.1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 1 1

Em banco de dutos H/h p/ m EL M AJ

Diretamente enterrados H/h p/ m EL M AJ

.052 .140 .061 .154 .064 .166 .077 .193 .086 .199 .094 .220 .097

.208 .560 .244 .616 .256 .664 .308 .772 .344 .796 .376 .880 .388

.029 .077 .034 .085 .035 .091 .042 .106 .047 .109 .052 .121 .053

.116 .308 .136 .340 .140 .364 .168 .424 .188 .436 .208 .484 .212

.108

..432

.059

.236

.118 .132 .151

.472 .528 .604

.065 .073 .083

.260 .292 .332

43

tecapCabo Telefnico Cabo telefnico para uso interno, fio de cobre eletroltico isolado em PVC, blindagem em fita de alumnio, capa externa de PVC. ( Tipo CO ) ( Em leito ou eletroduto )

N de Pares 10 20 30 50 75 100 200 300 400 600 800

Dimetro do cond. 0,4mm H/h p/ m. EL M AJ .024 .096 .030 .122 .031 .124 .037 .147 .044 .175 .046 .184 .062 .250 .067 .269 .080 .320 .115 .470 .134 .530

Dimetro do cond. 0,5mm H/h p/ m. EL M AJ .028 .114 .031 .124 .032 .128 .044 .175 .046 .184 .051 .208 .065 .259 .084 .336 .105 .420 .143 .582 .161 .645

Dimetro do cond. 0,65mm H/h p/ m. EL M AJ .030 .122 .032 .128 .037 .149 .046 .184 .053 .211 .060 .240 .079 .317 .117 .470 .127 .510 .164 .655

Cabo telefnico para uso em instalaes subterrneas, fio de cobre eletroltico, isolao em polietileno, gelia de petrleo nos espaos intersticiais, fita de alumnio politenada e capa externa de polietileno. ( Tipo CTP APL G ) em leito ou eletroduto. N de Pares 10 20 30 50 75 100 dimetro do cond. 0,4mm H/h p/ m. EL M AJ .024 .096 .030 .122 .031 .124 .037 .148 .044 .175 .046 .184 dimetro do cond. 0,51 mm H/h p/ m. EL M AJ .029 .118 .031 .124 .037 .148 .044 .175 .048 .196 .056 .225 dimetro do cond. 0,64 mm H/h p/ m. EL M AJ .031 .124 .037 .148 .044 .175 .050 .200 .060 .240 .064 .257 dimetro do cond. 0,91 mm H/h p/ m. EL M AJ .037 .148 .046 .184 .055 .215 .064 .257 .079 .317 .099 .395

44

tecapCabo Telefnico para Ligao de Aparelhos 2x0, 9mm de dimetro. Lanamento em eletroduto.

EL .020

H/h p/ m. M

AJ .080

Fio e cabo singelos para iluminao ( Similar ao Pirastic da Pirelli, lanamento em eletroduto ) Seco 1,5 Seco 2,5 mm mm H/h p/ m. H/h p/ m.EL .01 8 M AJ .07 2 EL .02 0 M AJ .08 8

Seco 4 mm H/h p/ m.EL .02 2 M AJ .08 8

Seco 6 mm H/h p/ m.EL .02 4 M AJ .09 6

Seco 10 mm H/h p/ m.EL .02 6 M AJ .10 4

Seco 16 mm H/h p/ m.EL .02 8 M AJ .112

Cabo de Comando Esto inclusos: corte do cabo no comprimento, descascamento do cabo, identificao dos condutores, colocao dos terminais, ligao sobre bornes e fixao do cabo no painel, incluindo preparao do chicote. Est exclusa: confeco de uma ponta de lpis. Obs.: Os tempos so vlidos para ligaes dentro de painis, para ligaes em equipamentos de campo aplicar um coeficiente de: 1.50 Os tempos so vlidos para cabos blindados e no blindados ( blindagem eletrosttica ). N de Cond. 2 3 4 5 7 9 12 1,5 mm H/h p/ extrem. EL M AJ .40 .63 .81 .99 1.26 1.53 1.89 No armado 2,5 mm H/h p/ extrem. EL M AJ .50 .90 1.10 1.30 1.60 2.00 2.60 4,0 mm H/h p/ extrem. EL M AJ .63 .90 1.17 1.40 1.80 2.16 2.66

45

15 19 24 30 N de Cond. 2 3 4 5 7 9 12 15 19 24 30

2.25 2.70 3.24 3.78 1,5 mm H/h p/ extrem. EL M AJ .63 .90 1.17 1.40 1.80 2.16 2.66 3.15 3.78 4.50 5.31

3.40 4.50 5.70 Armado 2,5 mm H/h p/ extrem. EL M AJ .70 1.00 1.30 1.55 2.00 2.40 2.95 3.50 4.20 5.00 5.90

3.15 3.78 4.50 5.31 4,0 mm H/h p/ extrem. EL M AJ .85 1.30 1.55 1.80 2.20 2.80 3.60 4.80 6.30 7.80

Cabo de fora at 1000 V Esto inclusos: corte do cabo no comprimento, descascamento do cabo, identificao dos condutores, colocao dos terminais, ligao sobre bornes e fixao do cabo no painel. Esto exclusos: confeco de uma ponta de lpis. Cabo de fora at 1000 V No Armado Seco em mm 1,5 2,5 4 6 10 16 25 1 Condutor 2 Condutores H/h p/ H/h p/ extrem. extrem. EL M AJ EL M AJ .30 .40 .34 .50 .37 .60 .40 .70 .50 .80 .55 .90 .65 1.00 3 Condutores H/h p/ extrem. EL M AJ .63 .70 .90 1.00 1.10 1.15 1.20 4 Condutores H/h p/ extrem. EL M AJ .81 .90 1.10 1.20 1.30 1.40 1.50

46

35 50 70 95 120 150 185 240 300 400 500 630 800

.70 .80 .90 1.00 1.20 1.25 1.30 1.50 1.60 1.70 2.00 3.00 4.00

1.10 1.30 1.40 1.60 1.90 2.10 2.30 2.50 3.00

1.50 1.75 2.00 2.25 2.50 2.75 3.00 3.50 4.50

1.80 2.25 2.50 2.75 3.00 3.25 3.50 4.50 6.00

Cabo de fora at 1000 V Armado Seco em mm 1,5 2,5 4 6 10 16 25 35 50 70 95 120 150 185 240 300 400 500 630 800 1 Condutor H/h p/ extrem. EL M AJ .40 .45 .50 .55 .70 .80 .90 1.00 1.10 1.30 1.40 1.70 1.75 1.80 2.10 2.25 2.40 2.80 4.20 5.50 2 Condutores H/h p/ extrem. EL M AJ .63 .70 .85 1.00 1.10 1.30 1.40 1.55 1.80 2.00 2.25 2.65 2.95 3.20 3.50 4.20 3 Condutores H/h p/ extrem. EL M AJ .90 1.00 1.30 1.40 1.55 1.60 1.70 2.10 2.45 2.80 3.15 3.50 3.85 4.20 4.90 6.30 4 Condutores H/h p/ extrem. EL M AJ 1.17 1.30 1.55 1.70 1.80 2.00 2.10 2.50 3.15 3.50 3.85 4.20 4.55 4.90 6.30 8.40

47

Cabo de Mdia Tenso Esto inclusos: Corte do cabo no comprimento, preparao de mufla para uso interno ou externo ou para emenda, ligao do cabo nos bornes, fixao eventual do cabo e de mufla no painel. Obs.: Para cabos armados usar um coeficiente de: 1.20 Se o terminal soldado, aplicar um coeficiente de: 1.20 Mufla para Uso Interno ( Mufla sem isolador de porcelana e sem caixa de ferro fundido; eventualmente pode ser usada externamente com blindagem de chuva dependendo da classe de tenso ). Seco N Em De mm Cond.10 e 16 10 e 16 25 e 35 25 e 35 50 e 70 50 e 70 95 e 120 95 e 120 150 e 185 150 e 185 240 e 300 240 e 300 400 e 500 630 e 800

3,6 /6 KV 6 / 10 KV 8,7 / 15 KV H/h p/ H/h p/ H/h p/ extrem. extrem. extrem. EL M AJ EL M AJ EL M AJ1.44 3.36 1.92 4.08 2.40 4.80 2.88 5.76 3.36 6.72 3.84 7.68 4.80 5.49 1.62 3.78 2.16 4.59 2.70 5.40 3.24 6.48 3.78 7.56 4.32 8.64 5.40 1.80 4.20 2.40 5.10 3.00 6.00 3.60 7.20 4.20 8.40 4.80 9.60 6.00

1 3 1 3 1 3 1 3 1 3 1 3 1 1

48

tecapMufla para Uso Externo ( Mufla com isolador de porcelana e com caixa de ferro fundido ). Seco N Em de mm Cond.10 e 16 10 e 16 25 e 35 25 e 35 25 e 35 50 e 70 50 e 70 95 e 120 95 e 120 150 e 185 150 e 185 240 e 300 240 e 300 400 e 500 400 e 500 630 e 800 1000 1000 1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3 8.64 10.80 12.00 7.68 9.64 9.60 3,6 / 6 KV 6 / 10 KV 8,7 / 15 KV

H/h p/ peaEL 1.92 4.32 2.72 5.60 3.36 6.72 4.80 7.68 5.28 3.64 5.76 9.60 6.72 M AJ

H/h p/ peaEL 2.16 4.86 3.06 6.30 3.78 7.56 5.40 8.64 5.94 9.72 6.48 10.80 7.56 M AJ

H/h p/ peaEL 2.40 5.40 3.40 7.00 4.20 8.40 6.00 9.60 6.60 10.80 7.20 12.00 8.40 M AJ

49

tecapEmenda ( Normalmente executada a prova de tempo preenchendo com resina isolante um molde de material plstico ou alumnio ) Seco N em de mm Cond. 10 e 16 1 10 e 16 3 25 e 35 1 25 e 35 3 50 e 70 1 50 e 70 3 95 e 120 1 95 e 120 3 150 e 185 1 150 e 185 3 240 e 300 1 240 e 300 3 400 e 500 1 400 e 500 3 630 e 800 1 630 e 800 3 1000 1 1000 3 3,6 / 6 KV H/h p/ pea EL M AJ 1.92 4.80 2.88 6.24 4.80 11.52 7.68 13.44 8.64 16.52 9.60 19.20 11.52 13.44 16.93 6 / 10 KV H/h p/ pea EL M AJ 2.16 5.40 3.24 7.02 5.40 12.96 8.64 15.12 9.72 18.36 10.80 21.60 12.96 15.12 19.04 8,7 / 15 KV H/h p/ pea EL M AJ 2.40 6.00 3.60 7.80 6.00 14.40 9.60 16.80 10.80 20.40 12.00 24.00 14.40 16.80 21.16

Cabo Telefnico Esto inclusos: corte de cabo no comprimento, descascamento do cabo, colocao de terminais e ligao sobre borne, ou solda do condutor e fixao do cabo no painel. Cabo MultiparN de Pares 10 20 30 50 75 100 Dimetro do Condutor 0,4 mm H/h p/ extrem. EL M AJ 1.00 1.50 2.15 2.70 3.20 3.80 Dimetro do Condutor 0,5 mm H/h p/ extrem. EL M AJ 1.00 1.50 2.15 2.70 3.20 3.80 Dimetro do Condutor 0,65 mm H/h p/ extrem. EL M AJ 1.20 1.70 2.30 2.90 3.40 4.10 Dimetro do Condutor 0,91 mm H/h p/ extrem. EL M AJ 1.50 2.15 2.70 3.20 3.80 4.60

50 200 300 5.50 6.50 5.50 6.50 6.20 6.90 6.50 -

Cabo para ligao de Aparelhos 2x0, 9mm de Dimetro EL .020 H/h p/ extrem. M AJ

Fio e Cabo Singelos para Iluminao ( Similar ao Pirastic da Pirelli ) Seco 1,5 mm H/h p/ extrem.EL M AJ.

Seco 2,5 mm H/h p/ extrem.EL M AJ.

Seco 4 mm H/h p/ extrem.EL M AJ.

Seco 6 mm H/h p/ extrem.EL M AJ.

Seco 10 mm H/h p/ extrem.EL M AJ.

Seco 16 mm H/h p/ extrem.EL M AJ.

.20

.25

.30

.35

.45

.50

Equipamento de Fora Os servios so executados em painis pr-fabricados e as vezes munidos de uma placa de montagem. Esto inclusos: transporte dos equipamentos at a oficina, furao da chaparia, fixao dos equipamentos no painel, fiao entre os componentes, colocao de identificadores e plaquetas. Esto exclusos: confeco de chaparia e fabricao de eventuais suportes. Montagem de um Disjuntor em Caixa Moldada Tripolar de: 100 A 250 A 500 A 800 A 1200 A H/h p/ pea H/h p/ pea H/h p/ pea H/h p/ pea H/h p/ pea E M A E M A E M A E M A E M AJ J L J L J L J L LSem manopla de acionament o rotativo sobre a porta Com manopla de acionament o rotativo sobre a porta 2 2.5 3 4 6

4

5

6

7

8

51

Montagem de uma chave Seccionadora Tripolar de: 100 A 250 A 400 A 630 A 1250 A H/h p/ pea H/h p/ pea H/h p/ pea H/h p/ pea H/h p/ pea E M A E M A E M A E M A E M AJ L J L J L J L J LSem manopla de acionament o rotativo sobre a porta Com manopla de acionament o rotativo sobre a porta 2 2.5 3 4 6

4

5

6

7

8

Montagem de uma Base Fusvel diazed ou NH EL .50 H/h p/ pea M AJ.

Montagem de um Contator Tripolar de: 16 AH/h p/ pea EL M AJ

40 AH/h p/ pea EL M AJ

120 AH/ p/ pea EL M AJ

250 AH/h p/ pea EL M AJ

400 AH/h p/ pea EL M AJ

630 AH/h p/ pea EL M AJ

1

1

2

2

2.5

3

Montagem de um Rel Trmico Tripolar Fixado sobre a Chaparia de: 12 AH/h p/ pea EL M AJ

25 AH/h p/ pea EL M AJ

63 AH/ p/ pea EL M AJ

160 AH/h p/ pea EL M AJ

400 AH/h p/ pea EL M AJ

630 AH/h p/ pea EL M AJ

.50

.50

.80

1

1

1.50

Montagem de um Quick-lag Unipolar H/h p/ pea EL M AJ .50 Bipolar H/h p/ pea EL M AJ .50 Tripolar H/h p/ pea EL M AJ .50

52

tecapMontagem de um Borne: Esto inclusos: fixao do trilho DIN, placa final, identificadores e demais acessrios.

27 A H/h p/ pea EL M AJ. .03

47 A H/h p/ pea EL M AJ. .03

87 A H/h p/ pea EL M AJ. .05

143 A H/h p/ pea EL M AJ. .05

Montagem de um Cabo de Interligao entre Componentes ( Comprimento mdio de 0,30 m )4 mm H/h p/ pea EL M AJ .20 10 mm H/h p/ pea EL M AJ .20 25 mm H/h p/ pea EL M AJ .30 50 mm H/h p/ pea EL M AJ .40 120 mm H/h p/ pea EL M AJ .60 240 mm H/h p/ pea EL M AJ .80

Montagem de Barra de Cobre Nu de: Esto inclusos: a fixao de isoladores, dobras da barra, furao e fixao.20 mm H/h p/ pea EL M AJ 1 50 mm H/h p/ pea EL M AJ 1.25 100 mm H/h p/ pea EL M AJ 2 250 mm H/h p/ pea EL M AJ 2.30 500 mm H/h p/ pea EL M AJ 3 900 mm H/h p/ pea EL M AJ 4

Equipamentos de Comando, Sinalizao e proteo Os servios so executados em painis pr-fabricados e normalmente munidos de uma placa de montagem, como tambm em mesas de comando. Esto inclusos: transporte dos equipamentos at a oficina, furao de chaparia, fixao dos equipamentos no painel, fiao entre componentes, colocao de identificadores e plaquetas. Esto exclusos: confeco de chaparia e fabricao de eventuais suportes. EquipamentosMontagem de um visor Luminoso ou um Boto de Comando ou uma Chave Seletora ( Tipo pequeno ) Montagem de um Instrumento Indicador Embutido

EL 1 3

H/h p/ pea M

AJ.

53Montagem de um Rel Secundrio ou um Instrumento Registrador Embutido Montagem de uma chave de Comando tipo pesado Montagem de um Rel Auxiliar na Placa de Montagem Montagem de um Ponto de Alarme Embutido, ( H/h por ponto ) Montagem de um Borne de Comando ( est incluso o trilho DIN, os laterais e os identificadores Montagem de um Cabinho n 16 de Interligao entre Componentes ( comprimento mdio de 1,5 m, esto inclusos as anilhas e os terminais )

4 3 .50 1 .03 .20

EquipamentosMontagem de Canaleta de Plstico para Suporte da Fiao

EL .50

H/h p/ m. M

AJ.

Equipamentos de Comando, Sinalizao e Proteo utilizando o critrio do borne til O critrio deste item pode ser aplicado no lugar do critrio do item ( Barramento blindado de cobre para mdia tenso ), quando for difcil a aplicao deste ltimo por falta de tempo ou por falta de relao de materiais. No entanto o mtodo menos preciso. Por borne til entende-se todos os bornes do painel excetuando-se os bornes repetidos. O nmero de bornes teis multiplicados por um tempo unitrio dar-nos- o tempo total de montagem dos equipamentos do painel. Esto inclusos: transporte dos equipamentos at a oficina, fixao dos equipamentos no painel, fiao entre componentes, colocao de identificadores e plaquetas. Esto exclusos: confeco de chaparia e eventuais suportes, furao de chaparia ( estimar parte ).

54

EL .70

H/h p/ borne til M

AJ

Modificaes em painis existentes O tempo no pode ser estimado com preciso tendo em vista que cada modificao um caso particular a ser estudado e que geralmente implica em um maior ou menor remanejamento de equipamentos existentes. O oramentista poder usar os tempos dos itens: Equipamentos de comando, sinalizao e proteo, Equipamentos de fora e Equipamentos de comando, sinalizao e proteo utilizando o critrio do borne til e multiplicados por um coeficiente varivel entre 1.5 e 2.

55

tecapBarramento blindado de Cobre Esto inclusos: transporte at o local, alinhamento e fixao dos suportes, montagem dos elementos do barramento, ligao eltrica dos elementos entre si e ligao das extremidades com o transformador, painel e caixa de alimentao. Est excluso: confeco de suportes Os tempos so vlidos para uma altura de at 4 m, para alturas entre 4 e 10 m utilizar coeficiente de: 1.30Corrente Nominal Trecho reto em barra De 1,2,3 ou 5m 3 3 + N H/h p/ m H/h p/ m EL M AJ EL M AJ2 2 2 2.5 2.5 2.5 2.5 3 3.5 3.5 4.5 4.5 5 2 2 2 2.5 2.5 2.5 2.5 3 3.5 3.5 4.5 4.5 5 2 2 2 2.5 2.5 2.5 3 3.5 4 4 5 5 6 2 2 2 2.5 2.5 2.5 3 3.5 4 4 5 5 6

Curvas T, caixa de alimentao, reduo e etc. 3 3 + N H/h p/ pea H/h p/ pea EL M AJ EL M AJ3 3 3 3.5 3.5 3.5 3.5 4 4.5 4.5 5.5 5.5 6 3 3 3 3.5 3.5 3.5 3.5 4 4.5 4.5 5.5 5.5 6 3 3 3 3.5 3.5 3.5 4 4.5 5 5 6 6 7 3 3 3 3.5 3.5 3.5 4 4.5 5 5 6 6 7

Cofre tipo Plug-In 3 H/h p/ pea EL M AJ1 1 1 1 1 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1 1 1 1 1 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5

3 + N H/h p/ pea EL M AJ1 1 1 1 1 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1 1 1 1 1 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5

160 A 200 A 315 A 450 A 550 A 1000 A 1250 A 1900 A 2350 A 2900 A 3300 A 3800 A 4300 A

Barramento blindado de cobre para mdia tensoCorrente Nominal Trecho reto em barra De 1,2,3 ou 5m H/h por m EL M AJ 2.5 2.5 2.5 2.5 3 3 3 3 Curva, T, caixa de Alimentao, reduo e etc. H/h por pea EL M AJ 3.5 3.5 3.5 3.5 4 4 4 4 Cofre Tipo Plug - In EL H/h por pea M AJ

300 A 500 A 750 A 1000 A

Furao de extremidade de barramento blindado de baixa ou mdia Tenso ( A extremidade de barramento blindado para ligao em painel ou transformador normalmente feita por lminas flexveis, no entanto necessrio que os furos para os parafusos sejam feitos na obra aps a montagem de barramento ). Os tempos so vlidos para uma extremidade de barramento.

56Corrente Nominal H/h por extremidade de barramento 3 3 + N H/h p/ pea H/h p/ pea EL M AJ EL M 1.5 1.5 2 1.5 1.5 2 2 2 2.5 2 2 2.5 2.5 2.5 3 2.5 2.5 3 3 3 3.5 3 3 3.5 3.5 3.5 4 3.5 3.5 4 Corrente Nominal AJ 2 2 2.5 2.5 3 3 3.5 3.5 4 4 H/h por extremidade de barramento 3 3 + N H/h p/ pea H/h p/ pea EL M AJ EL M 4 4 4.5 4.5 4.5 5.5 5 5 6 5 5 6

160 A 200 A 315 A 450 A 550 A 700 A 1000 A 1250 A 1900 A 2350 A

2900 A 3300 A 3800 A 4300 A

AJ 4.5 5.5 6 6

Estruturas de concreto e metlicas para suporte de equipamentos Servios inclusos: transporte do almoxarifado da obra at a S.E., abertura de furos e concretagem para os postos e outros suportes ou bases de concreto. Obs.: Se for necessrio um guindaste dever ser previsto independentemente Instalao de Postes Redondos, Retangulares e Duplo TE de concretoAltura (m) 5 8 10 12 15 18 21 Peso ( kg ) 250 a 500 500 a 900 900 a 1200 1200 a 1800 1800 a 2400 2400 a 3300 3300 a 4200 EL H/h p/ pea M 4 5 6 7.5 10 15 20 AJ. 4 5 6 7.5 10 15 20

Instalao de vigas duplo TE de concreto para fixao das cadeias de isoladores at 5 metros de altura, para altura superior utilizar um coeficiente de: 1.30Comp. ( m ) 9 11 13 15 Peso ( kg ) EL 900 1300 1600 2000 H/h por pea M 4 5 6 7.5 AJ 4 5 6 7.5

57

tecapInstalao de vigas retangulares para suporte de seccionadoras at uma altura de 5 metros, para altura superior utilizar coeficiente de:Comp. ( Metros ) 4.70 6.50 Peso ( kg ) 140 280 EL H/h por pea M 2.5 3.5 AJ 2.5 3.5

Instalao de anis Tipo T-L-TL para fixao das Vigas ( Incluindo o chumbamento ).EL H/h p/ par M 1.5 AJ 1.5

Instalao de capitis para suporte de: pra-raios, transf. corrente, transf. potencial, isolador de pedestal.EL H/h por pea M 1.5 AJ 1.5

Instalao de suporte tipo Jabaquara para seccionadoras:EL Simples p/ 1 coluna e 2 vigas Simples p/ 1 coluna e 4 vigas Duplo p/ 2 colunas e 2 vigas H/h por pea M 2.5 2.5 4 AJ 2.5 2.5 4

Isoladores de vidro ou porcelana Instalao de Cadeia de Isoladores de Disco Servios inclusos: montagem dos discos para formar a cadeia, fixao de toda a ferragem necessria conforme o tipo de cadeia por exemplo, estribo, olhal bola, balancim, chifres anis, virola, grampo de suspenso e etc.69 KV M .75 88 KV M 1 H/h para cada Cadeia 138 KV AJ EL M 1 1.5 230 KV M 2

EL

AJ .75

EL

AJ 1.5

EL

AJ 2

58

tecapInstalao de Isoladores Suporte tipo colunas Servios inclusos: colocao em cima da base, regulagem e fixao.H/h por pea EL 69 KV M 2 AJ 2 EL 88 KV M 2 AJ 2 EL 138 KV M 3 AJ 3 EL 230 KV M 4 AJ 4

Montagem de equipamentos Servios inclusos: colocao em cima das bases, fixao, alinhamento e regulagem. Servios Exclusos: ligaes, conexes, cabos e barramentos de interligaes.Equip. EL Para-raio para uma fase incluindo cortador de raio Seccionadora trifsica manual com dispositivo de acionamento e com ou sem faca para ligao a terra Seccionadora trifsica eltrica com dispositivo de acionamento e com ou sem facas para ligao a terra Transformador de Corrente ( TC ) Transformador de Tenso ( TP ) Disjuntor trifsico de pequeno volume de leo 69 KV M 2.5 AJ 2.5 EL 88 KV M 2.5 H/h por pea AJ 2.5 EL 138 KV M 4 AJ 4 EL 230 KV M 5 AJ 5

20

20

23

23

30

30

37

37

20

20

23

23

30

30

37

37

2.5 2.5 23

2.5 2.5 23

2.5 2.5 25

2.5 2.5 25

4 4 29

4 4 29

5 5 34

5 5 34

59

tecapResistncia de Neutro de TransformadorH/h por pea EL 13,8 KV M 7.5 AJ 7.5 EL 4 KV M 7.5 AJ 7.5 EL 2,4 KV M 7.5 H/h p/ pea M 2.5 AJ 7.5 EL 0,48 KV M 5 AJ 5

EL Seccionadora trifsica com dispositivo de comando manual tipo alavanca Seca para 13,8 KV Seccionadora trifsica com dispositivo de comando manual tipo alavanca em leo para 13,8 KV

AJ 2.5

7.5

7.5

Transformadores Montagem dos Transformadores de Potncia Servios inclusos: instalao nas bases, nivelamento e fixao, transporte desde uma distncia no superior a 6 metros. No esto inclusos: confeco e instalao das bases e trilhos e ligaes eltricas. Obs.: Tempo vlido para instalao e nvel trreo. Dever ser previsto quando necessrio aluguel de guindaste.Potncia ( KVA ) 750 1000 1500 2000 5000 * 10000 * 15000 * 25000 * 35000 * 50000 * EL 16 20 25 30 30 35 40 45 50 60 H/h por pea M 5 7 8 10 10 12 13 15 17 20 AJ 11 13 17 20 20 23 27 30 34 40

* Necessrio Guindaste

60

tecapMontagem dos Acessrios dos Transformadores Os tempos foram estimados, considerando-se que os tempos de montagem dos acessrios sejam proporcionais potncia do transformador.H/h p/ transf. Coloc. de Buchas EL M AJ. 5 10 30 35 40 50 5 10 30 35 40 50 Potncia ( KVA ) EL 2000 5000 10000 15000 25000 35000 Radiadores M 8 12 15 20 25 35 AJ. 8 12 15 20 25 35 H/h por transformador Colocao de Ventiladores leo EL M AJ. EL M AJ. 10 10 14 14 2.5 2.5 18 18 5 5 24 24 7.5 7.5 30 30 10 10 40 40 15 15 Quadro Comando De ventiladores EL M AJ. 1.5 1.5 2 2 2.5 2.5 3 3 3.5 3.5

Diversos Trilho para Base de TransformadorEL H/h por metro M 1 AJ 1

Cerca de tela de arame com ou sem revestimento de material isolante.EL Fabricao Instalao H/h por m M 2.50 1.50 AJ 2.50 1.50

Barramento de interligao ( cabo de cobre n ) de equipamento lanamento ).EL .025 .030 H/h por metro M AJ

(

4/0 a 250 MCM 300 a 500 MCM

Barramento de tubo de alumnio para interligao dos equipamentos lanamento ). Externo em mm 70 100 150 200 EL 1 1.30 1.60 2 H/h p/ metro M AJ

(

61

tecap4/0 a 250 MCM 300 a 500 MCM EL 1.50 2 H/h por p. M AJ

Barramento de tubo de alumnio ( conexes ). Externo em mm 70 100 150 200 EL 2 2.20 2.60 3 H/h por p. M AJ

Iluminao Trabalhos inclusos: desembalagem, transporte do almoxarifado at o lugar da instalao, instalao dos suportes, instalao e ligao a rede das luminrias, interruptores e tomadas. Trabalhos exclusos: confeco dos suportes, parte civil, abertura de forro para luminrias embutidas, instalao dos eletrodutos, aterramento, fiao, montagem dos componentes nas luminrias. Iluminao Comercial e residencial Luminrias para lmpadas fluorescentesTipo EL de 1 e 2 x 20W aberta ou com difusor de acrlico ou aletas de alumnio de 3 a 4 x 20W aberta ou com difusor de acrlico ou aletas de alumnio de 1 e 2 x 40W e 65W aberta ou com difusor de acrlico ou aletas de alumnio de 3 e 4 x 40W e 65W aberta ou com difusor de acrlico ou aletas de alumnio de 1 e 2 x 110W e 135W aberta ou com difusor de acrlico ou aletas de alumnio de 3 e 4 x 110W e 135W aberta ou com difusor de acrlico ou aletas de alumnio H/h p/ pea M .60 AJ .60

.90

.90

.90

.90

1.10

1.10

1.10

1.10

1.25

1.25

62

tecapLuminrias para lmpadas IncandescentesTipo EL Plafonier, arandela ou pendente p/ 1 lmpada Plafonier, arandela ou pendente p/ 2 e 3 lmpadas H/h p/ pea M .45 .65 AJ .45 .65

Iluminao Industrial Luminrias p/ lmpadas FluorescentesEspecificaes EL 1 e 2 x 20 W 3 e 4 x 20 W 1 e 2 x 40 W 3 e 4 x 40 W 1 e 2 x 110 e 135 W 3 e 4 x 110 e 135 W Abertas M .75 1 1 1.25 1.25 1.50 AJ .75 1 1 1.25 1.25 1.50 H/h por pea Prova de Tempo EL M .85 1.15 1.15 1.45 1.45 1.75 Prova de Exploso M AJ 2.50 2.50 3.50 3.50 3.50 3.50 4 4 4 4 5 5

AJ .85 1.15 1.15 1.45 1.45 1.75

EL

Luminrias para lmpadas incandescentes, mista, vapores de sdio, vapores metlicos e vapores de mercrio. Obs.: Tempos considerados sem a colocao de reator e condensador.Tipo EL Leve at 100 W Leve at 300 W Reforado at 100 W Reforado at 300 W Prova de exploso at 100 W Prova de exploso at 300 W Refletor at 300 W Refletor at 700 W Refletor at 1000 W Projetor leve at 300 W em chapa de alumnio Projetor reforado at 500 W em alumnio fundido Projetor reforado at 1500 W em chapa de alumnio Projetor leve at 1000 W em chapa de alumnio Projetor super resistente H/h p/ pea M 1 1.25 1.25 1.50 1.50 2.50 1.50 1.75 2 1.50 2 3 2 3.5 AJ 1 1.25 1.25 1.50 1.50 2.50 1.50 1.75 2 1.50 2 3 2 3.5

63para at 2 x 1000 W Projetor retangular para at 1000 W 3 3

Luminrias de Emergncia Luminria para lmpada fluorescente de 6 W 12 V com Inversor tipo P-120 da Peterco.EL H/h p/ pea M .50 AJ .50

Luminria para lmpada fluorescente de 20 ou 40 W 12 V com inversor. Tipo P 186 da PetercoEL H/h p/ pea M .75 AJ .75

Conjunto de iluminao de emergncia composto de bateria 12 V e um ou dois refletores. Tipo P 190 da Peterco.EL H/h p/ pea M 2 AJ 2

Linha Aeronutica e Sinalizadores Aparelho de mdia ou alta intensidade para balizamento de pistas para lmpadas incandescentes de 30 a 200 W. Tipo ZS 62, 63, 64 e 66 da Peterco.H/h p/ pea EL M 1 AJ. 1

Sinalizador simples para uma lmpada incandescente de 60 W. Tipo ZS 80 da Peterco.H/h p/ pea EL M .50 AJ. .50

64

tecapSinalizador duplo para duas lmpadas incandescentes de 60 W cada. Tipo ZS 82.H/h p/ pea EL M .75 AJ. .75

Iluminao externa Os tempos de instalao das luminrias tipo ptala foram considerados para uma ptala. Para cada ptala subseqente no mesmo poste utilizar um fator k = 03. A montagem dos postes no esto inclusa na montagem das luminrias e vice-versa. Luminria aberta ou fechada para encaixe, lmpada incandescente at 300 W ou vapor de mercrio at 125 W. Tipo X-69, X-64, X-24/3, E X-24/5 da Peterco.H/h p/ pea EL M .75 AJ. .75

Luminria fechada para encaixe, lmpada a vapor de mercrio at 500 W. Tipo X-8, X-11, X-15, X-18 e X-35.H/h p/ pea EL M 1 AJ. 1

Luminria fechada para encaixe com equipamento incorporado. Lmpada a vapor de mercrio ou sdio de alta presso at 400 W. Tipo X-19 e X-150/5 da Peterco.H/h p/ pea EL M 1.25 AJ. 1.25

65

tecapLuminria Fechada para encaixe com equipamento incorporado para lmpada sdio alta presso de 1000 W. Tipo X-150/6 da Peterco.H/h p/ pea EL M 3 AJ. 3

Luminria fechada, tipo ptala para encaixe, com equipamentos incorporados para uma lmpada, vapor de mercrio 700 W ou sdio de alta presso de 400 W, tipo X109 da Peterco.H/h p/ pea EL M 2 AJ. 2

Luminria fechada, tipo ptala com equipamento incorporado para lmpadas, vapor de mercrio ou sdio de alta presso de 2 x 400 W, 1 x 1000 W, tipo X-89/25, X-89/6 da PetercoH/h p/ pea EL M 4 AJ. 4

Luminria fechada, tipo ptala com equipamento incorporado para lmpadas, vapor de mercrio de 1 x 2000 W, tipo X-90 da Peterco.H/h p/ pea EL M 10 AJ. 10

Luminria fechada, tipo ptala com equipamentos para lmpada, vapor de mercrio ou sdio de alta presso de 2 x 1000 W, tipo X-100/S26 da Peterco.H/h p/ pea EL M 10 AJ. 10

66

tecapPostes Servios inclusos: abertura do furo no cho, transporte do poste do almoxarifado at o lugar da instalao, colocao do poste, alinhamento e concretagem. Poste Redondo de ConcretoAltura Metros 7 12 18 24 30 Peso kg. 200 a 400 600 a 1200 1400 a 2400 2600 a 3300 3500 a 4200 H/h p/ pea EL M 3 6 12 15 18 AJ. 7 14 28 35 42

Poste em Tubo de Ao Reto ou com Curvas Concretado ou Chumbado ( Luminria Exclusa ).Quantidade Altura 7 metros EL 1 Luminria 2 Luminria M 3 4 AJ. 5 7 EL H/h por pea Altura 10 metros M 3 4 AJ. 7 9

Poste em Tubo de Ao Reto ou com Curva Instalado com a Base para Equipamentos.

Quantidade Altura 7 metros EL 1 Luminria 2 Luminria M 5 6.5 AJ. 5 6.5

H/h por pea Altura 10 metros EL M 6 7.5 AJ. 6 7.5

67

tecapFixao de Brao para Luminria em Poste de Ao ou ConcretoTipo Simples EL Brao de Ao Brao de Concreto M 2 3 AJ. 2 3 EL H/h por pea Duplo M 3 4 AJ. 3 4

Equipamentos, Acessrios e servios diversos de iluminao Instalao de Interruptores, Tomadas e Caixa para Uso Residencial Servios inclusos: corte da parede ou piso, colocao da caixa, chumbar e colocao de espelhos.N de Interrupto res e ou tomadas 1 2 3 4 5 6 H/h por pea Embutido EL M .50 .60 .65 .75 .80 .85 AJ. .50 .60 .65 .75 .80 .85 EL Aparente M .25 .30 .35 AJ. .25 .30 .35 EL Piso M .75 .75 .75 AJ. .75 .75 .75

Instalao de Caixa de Passagem Servios inclusos: corte na parede, chumbar.Caixa EL 2x2 3x3 H/h p/ pea M .50 .50 AJ. .50 .50

68

tecapInstalao de Interruptores, Tomadas e Caixas de Passagem para Uso Industrial Servios inclusos: demarcao, furaes, colocao dos chumbadores, refer. Peterco.H/h por pea Prova de Tempo EL R-15 ( um a dois ) R-61 ( um a cinco ) R-61 ( seis a dez ) R-20 R-10 - 12 M .40 1 1.75 .50 .50 AJ. .40 1 1.75 .50 .50 EL Prova de Exploso M .60 1 3 .75 .60 AJ. .60 1 3 .75 .60

Instalao de Suspenso para luminriasH/h p/ pea EL Articulada K-43 Anti-vibratria com tomada K-46 Anti-vibratria Hermtica K-53 Com correntes K-38 Canopla K-41 e K-52 Para fixao em cabo de ao K 11 14 - 47 M .15 .15 .15 .25 .50 .50 AJ. .15 1.5 1.5 .25 .50 .50

Montagem dos Equipamentos dentro das Luminrias Fluorescente ( soquete, reator starter, fiao e etc. )Potncia EL 1x20-40-65-110-135 W 2x20-40-65-110-135 W 3x20-40-65-110-135 W 4x20-40-65-110-135 W H/h p/ luminria M .50 .75 1 1.25 AJ. .50 .75 1 1.25

69

tecapMontagem dos Equipamentos para as Luminrias para Lmpadas de Mercrio e Sdio de Alta presso ( Reatores, condensador starter )Potncia Colocao e fixao dos equipamentos em luminrias EL 160 W 250 W 400 W 500 W 700 W 1000 W M .25 .25 .40 .50 .75 1 AJ. .25 .25 .40 .50 .75 1 H/h por conjunto Colocao e fixao dos equipamentos dentro de 1 caixa EL M .75 .75 1 1 1.50 2 AJ. .75 .75 1 1 1.50 2 Colocao e fixao diretamente sobre suportes / paredes EL M .50 .50 .75 .75 1 1.50 AJ. .50 .50 .75 .75 1 1.50

Trilho Eletrificado para Luminrias e TomadasH/h p/ metro EL Embutido Aparente M .75 .35 AJ. .75 .35

Aterramento Servios inclusos: lanamento dos cabos, corte dos cabos, preparao das superfcies e fixao no leito ou estruturas. Servios exclusos: abertura de valas, aterro, reconstruo de pavimentos e ruas. Lanamento de cabos de cobre nBitola Direto em Valas EL 12 10 8 6 4 2 1/0 M .011 .012 .012 .013 .014 .018 .020 AJ. .043 .046 .048 .050 .058 .072 .079 EL H/h p/ metro Aparente M .077 .079 .080 .082 .086 .095 .100 AJ. .077 .079 .080 .082 .088 .095 .100 .131 .140 .131 .140 EL Leito M AJ.

702/0 3/0 4/0 250 MCM .022 .023 .024 .025 .086 .094 .097 .101 .104 .109 .111 .113 .104 .109 .111 .113 .149 .162 .165 .167 .149 .162 .165 .167

Conexo por solda ( Tipo CADWELD ) Conexes entre cabosBitola do Cabo AVG mm Emenda de Condut. EL 6 4-1 1/0-3/0 4/0-350 400-750 8001000 13,3 21,2 42,4 53,5 85,0 107,0 177,0 203,0 380,0 405,0 506 M .50 .60 .70 .80 .90 1 AJ. H/h p/ conexo TE e Sada Paralela EL M .50 .60 .70 .80 .90 1 AJ. EL Cruzados (X) M .70 .70 .80 .90 1.10 1.30 AJ.

Conexes de Cabo a: Haste, Superfcie de Ao e Terminal ou Barramento.Bitola AVG 6 4-1 1/0 - 3/0 4/0 - 350 400 - 750 800 - 1000 mm 13,3 21,2 42,4 53,5 85,0 107,0 177,0 203,0 380,0 405,0 - 506 EL H/h p/ Conexo M 1.50 1.60 1.70 1.80 2 2.20 AJ.

Conexes aparafusadas atravs de conectores, grampos, terminais e etc.Bitola AVG 6 4-1 1/0 - 3/0 4/0 - 350 400 - 750 800 - 1000 mm 13,3 21,2 42,4 53,5 85,0 107,0 177,0 203,0 380,0 405,0 - 506 EL H/h p/ conexo M .50 .60 .70 .80 .90 1 AJ.

71

Servios DiversosServios Diversos Haste de 3m x Por cada 1m suplementar de haste Cordoalha pea de 0,50 m Manilha de Barro ou Concreto de aprox. 10 1m de inspeo e medio Corte e Fixao de Barramento de Cobre de 300x50x10 mm Corte e Fixao de Barramento de Cobre de 1000x50x10 mm H/h p/ pea EL M 2 1 .50 1 AJ 2 1 .50 1

.90

.90

1

1

Seccionamento e aterramento de cercas.H/h por p. EL M 1 AJ. 1

Pra Raios e seus acessriosH/h p/ pea EL Captor Tipo Radioativo Captor Tipo Franklin Poste at 10 m 80 kg Poste at 15 m 110 kg Obs: Est incluso a base de concreto Mastro at 3 m 12 kg Mastro at 6 m 26 kg Mastro at 9 m 42 kg Instalao de um ESTAI completo, inclui esticador, cabo de ao, braadeiras e etc. Suporte para cabo de Descida Tipo Roldana 1.50 2 2.50 1.50 .07 1.50 2 2.50 1.50 .07 M .50 .50 2.50 3.50 AJ .50 .50 2.50 3.50

Obs: Est incluso a fixao da base em F GALV, ou as braadeiras tipo porta bandeira

72

tecapLinhas Areas at 15 kV Preparao de faixa de servido Servio incluso: Corte de rvores com motoserra at a largura da faixa especificada e corte manual de arbustos e capim.H/h por km Trechos com mata densa EL M 50 AJ. 200 EL Trechos com mata rala M 25 AJ. 100 Trechos com arbustos e capim EL M 18 AJ. 72

Montagem de postes Servio incluso: Transporte at o local, carga e descarga, abertura de furo executada manualmente, alinhamento e concretagem. Obs: Normalmente necessrio e auxlio de um caminho MUNK.Tipo de Poste Altura (m) 7 10 13 Madeira H/h por p. EL M 2 2.5 3 AJ. 4 4.5 5 EL Concreto H/h por p. M 4 6 8 AJ. 8 11 14 EL Metlico H/h por p. M 3 5 6 AJ. 7 9 12

Estaiamento de Postes Est incluso: Transporte at o local e instalao completa do contraposte, cabo de ao e ferragens.H/h por cada estai Estaiamento de poste ou cruzeta com contra-poste EL M 6.5 AJ. 6.5 Estaiamento de cruzeta a cruzeta EL M 2 AJ. 2 Estaiamento de poste com placa de concreto EL M 4 AJ. 4 Estaiamento com sapata para pntano EL M 6.5 AJ. 6.5

73

tecapMontagem de cruzetas Est incluso: Transporte at o local, montagem da cruzeta, dos isoladores e das demais ferragens de fixao. Est exclusa a montagem dos postes.Tipo Madeira EL Estrutura tipo N1,M1, B1 e T1 Estrutura tipo N2,M2, B2 e T2 Estrutura tipo N3,M3, B3 e T3 Estrutura tipo N4,M4, B4 e T4 U1 U2 e U3 U4 M 1.25 AJ. 1.25 EL H/h por estrutura Concreto M 1.75 AJ. 1.75 EL Ferro M 1.5 AJ. 1.5

1.50

1.50

2

2

1.75

1.75

1.50

1.50

2

2

1.75

1.75

1.75

1.75

2.25

2.25

2

2

.50 1 1.50

.50 1 1.50

Montagem de armaes para baixa tenso Est incluso: transporte at o local e fixao de armao metlica com estribos e isoladores.N Armaes por poste EL 1 armao 2 armaes 3 armaes H/h por conjuntos de armaes Armao com 3 Estribos M .50 .75 1 AJ. .50 .75 1 EL Armao com 2 Estribos M .45 .70 .90 AJ. .45 .70 .90 EL Armao com 1 Estribo M .40 .65 .85 AJ. .40 .65 .85

74

tecapLanamento de cabos areos Est incluso: transporte at o local, lanamento dos cabos, ajuste da flecha e amarrao nos isoladores. Est excluso: Emendas e conexes.H/h por m Cabos de cobre Bitola ( AVG ) 8 6 4 2 1/0 2/0 3/0 4/0 266,8 300 150 Seco ( mm ) 10 16 25 35 50 70 95 EL M .005 .006 .007 .008 .008 .009 .010 .011 AJ. .022 .024 .028 .031 .033 .036 .040 .043 Cabos de alumnio - CA EL M .005 .006 .006 .007 .008 .008 .008 .008 AJ. .019 .024 .026 .029 .030 .031 .033 .034 Cabos de alumnio com alma de ao - CAA EL M .005 .006 .007 .007 .008 .008 .008 .009 .010 AJ. .019 .024 .026 .030 .031 .032 .034 .036 .040

Conexes de cabos areos Obs.: Tempos vlidos para cabos de cobre e alumnio. Obs.: Quando a emenda efetuada ao longo do vo, utilizar um coeficiente k = 4.H/h por p Conexes por compresso Bitola ( AVG ) 8 6 4 2 1/0 2/0 3/0 4/0 266,8 Seco ( mm ) 10 16 25 35 50 70 95 EL M .80 .80 .80 .80 .90 .90 1 1 1.10 AJ. EL Conexes por presso M .50 .50 .50 .60 .60 .70 .70 .80 .90 AJ.

75300 150 1.20 1

Instalao de equipamentos em poste Est incluso: transporte at o local, fixao das peas com respectivas ferragens. Est excluso: conexes dos cabos Para raioH/h por conj. De 3 p EL M 2 AJ. 2

Chave Seccionadora Est inclusa a montagem de haste de manobra quando houver.H/h por conj. de 3 p. monofsico ou 1 p. trifsico Sem haste de acionamento EL M 4 AJ. 4 EL Com haste de acionamento M 6 AJ. 6

TransformadoresH/h por p. At 15 kVA EL M 5 AJ. 5 de 20 kVA 30 kVA EL M 8 AJ. 8 de 40 kVA 75 kVA EL M 10 AJ. 10 de 100 kVA 150 kVA EL M 15 AJ. 15

Religadores Est incluso: caixa com os rels.H/h por p Monofsico EL M 6.50 AJ 6.50 EL Trifsico M 15 AJ 15

76

tecapTestes Equipamentos de Manobra de Alta Tenso Est excluso: o teste de rels e instrumentos indicadores. Disjuntor de 69 230 kV Trifsico ( Vlido para circuito de comando simples )Testes H/h p/ pea Tc. Inspeo visual e reaperto, teste do circuito de comando ( eltrico ou pneumtico ); medio do isolamento, ajuste do mecanismo de acionamento e preenchimento da ficha de teste, inspeo visual e teste do painel de comando incluindo toda a fiao e os interlocks Teste de rigidez dieltrica do leo Teste de simultaneidade e tempo de abertura e fechamento Teste de resistncia hmica dos contatos Medio do fator de potncia de isolamento das buchas Idem do leo 4.0 EL. AJ.

1.50 4 2 8 1.50

Seccionadora de 69 230 kV TrifsicaTestes H/h p/ pea Tc. Inspeo visual e reaperto, teste de isolamento, verificao e ajuste do mecanismo de acionamento, teste dos interlocks e da sinalizao com respectiva fiao, lubrificao dos contatos, verificao de simultaneidade e preenchimento de ficha de teste Teste do circuito motorizado de acionamento, incluindo a fiao e o controle localizado no painel de comando e a verificao visual do prprio painel. Medio do fator de potncia de isolamento das buchas. 20 El Aj.

10 10

TC e TP de 69 e 230 kVTestes Tc. Inspeo visual e reaperto, teste de fiao, teste de isolamento e preenchimento das fichas de teste. Teste de rigidez dieltrica do leo Teste de relao de 7 H/h p/ pea El Aj.

2 3

77transformao Medio do fator de potncia de isolamento do leo Medio do fator de potncia das buchas Levantamento de curva de Saturao ( apenas para TC de proteo. Tempo para cada secundrio ). 1.5

4 3

Pra-raio de 69 230 kVTestes Tc Inspeo visual e reaperto, teste de isolamento e preenchimento da ficha Medio do fator de potncia das buchas 4 H/h p/ pea El Aj.

4

Equipamento de Manobra de Mdia Tenso Est excluso o teste de rels, instrumentos indicadores, TCs e TPs. Cubculo de Mdia Tenso com DisjuntorTestes H/h p/ pea Tc. Inspeo visual e reaperto, medida do isolamento, teste do circuito de interlocks e sinalizao incluindo equipamento no campo e em mesa de comando, ajuste do mecanismo de fechamento e preenchimento da ficha de teste. Teste de rigidez dieltrica do leo. Teste de resistncia dos contatos. Teste de simultaneidade e tempo de fechamento e abertura Ajuste e teste do mecanismo de extrao. Teste do circuito motorizado de comando Teste de tenso aplicada. El. Aj.

7 2 1 1.5 3 4 2.5

Cubculo de Mdia Tenso com seccionadora ManualTestes H/h p/ pea Tc. El. Inspeo visual e reaperto, teste do circuito de sinalizao e dos interlocks inclusive externos ao cubculo, teste de isolamento, ajuste do mecanismo de acionamento e preenchimento da ficha de teste. Teste de resistncia dos contatos Teste de tenso aplicada 5 Aj.

1 2.50

78

tecapCubculo de Mdia Tenso com ContactorTestes Tc. Inspeo visual e reaperto, teste do circuito de comando, incluindo equipamento no campo, em mesas de comando e dos interlocks, teste de isolamento, verificao da presso dos contatos e preenchimento de ficha de teste. Teste de resistncia hmica dos contatos Teste de tenso aplicada H/h p/ pea El. Aj.

5 1 2.50

Chave de Faca sob carga, Blindada em leoTestes H/h p/ pea Tc. Inspeo visual e reaperto, teste dos interlocks, medida do isolamento e preenchimento de ficha de teste Medio