7/27/2019 Calculos Projetos ETE Dimensionamento
1/5
7/27/2019 Calculos Projetos ETE Dimensionamento
2/5
b (m): 0.0095 = 0.375 pol
L (m): 0.0381 = 1.5 pol
Nmero de barras 7
Espaamento entre barras (m): 0.042
Perda de carga na grade:
(a) Grade limpa:
Condies a montante da grade:U (m/s)
Situao Q (L/s) y (m) u (m/s) y+u/2g (m)
mnima 25 0.1897 0.188 0.332 0.1936 0.399
mdia 50 0.3018 0.298 0.419 0.3070 0.503
mxima 75 0.3947 0.39 0.481 0.4018 0.577
(b) grade 50% obstruda:
Condies a montante da grade:U (m/s)
Situao Q (L/s) y (m) u (m/s) y+u/2g (m)
mnima 25 0.1897 0.215 0.291 0.2193 0.698
mdia 50 0.3018 0.342 0.365 0.3488 0.877
mxima 75 0.3947 0.447 0.419 0.4560 1.007
y+Uj/2g jusante (m)
y+Uj/2g jusante (m)
7/27/2019 Calculos Projetos ETE Dimensionamento
3/5
Exemplo:
P: 21000 Qmin = 37.08 L/s
k1: 1.2 Qmd = 57.50 L/s
k2: 1.5 Qmx = 75.00 L/s
k3: 0.5
kr: 0.8
q: 150
Lrede (m): 75000
7/27/2019 Calculos Projetos ETE Dimensionamento
4/5
Perda de carga (m)
Calculada Obtida
0.0035 0.0040
0.0056 0.0052
0.0074 0.0071
Perda de carga (m)
Calculada Obtida
0.0293 0.0296
0.0464 0.0470
0.0611 0.0613
7/27/2019 Calculos Projetos ETE Dimensionamento
5/5
Decantador primrio:
Taxa de aplicao (m/m.dia): 60
A (m): 108
L (m): 10.50
l (m): 0.60
Taxa resultante (m/m.dia): 58.77551Profundidade superior (m): 1.20
Profundidade inferior (m): 3.50
V (m): 277.305
Tempo hidrulico de deteno (h):
Para Qmx: 1.027056
Para Qmd: 1.540583
Taxa no vertedouro (m.m.dia): 154.2857
Vertedouros triangulares:
Nmero de vertedouros: 280 280
Vazo em cada vertedouro (L/s) 0.268
Lmina em cada vertedouro (m) 0.033