PLANILHAUNIVERSIDADE FEDERAL DE UBERLNDIAPLANILHA
ORAMENTRIAREFORMA DO SUBSOLO BLOCO 3PCAMPUS SANTA MNICAREA TOTAL
(M2):302,60m2DATA:20/06/2014TAXAS: LS= 90,64 %VALOR DO BDI (%)=
21,73%DATA BASE - REGIO: SINAPI - Belo Horizonte/MG
(MES:MAIO/14)
Item Comp Descricao Unidade Quantidade Materiais Mao de Obra Pr.
Unitario Pr. Total % DA ETAPA% DO TOTAL 1.SERVIOS PRELIMINARES 1.
1PAGAMENTO DE TAXA DE ANOTAO DE RESPONSABILIDADE TCNICA DE EXECUO
DE OBRATX1.00190.600.00190.60190.600.38%0.09% 1. 2IH0120VIGIA
NOTURNOH880.000.0012.4912.4910,991.2022.18%5.06% 1.
3IH0014ALMOXARIFEH400.000.0015.4615.466,184.0012.48%2.85% 1.
4IH0050ENGENHEIRO OU ARQUITETO AUXILIAR/JUNIOR - DE
OBRAH100.000.00114.32114.3211,432.0023.07%5.27% 1. 5IH0054FEITOR OU
ENCARREGADO GERALH400.000.0022.9522.959,180.0018.53%4.23% 1.
6CB0008ALUGUEL CONTAINER/ESCRIT INCL INST ELET LARG=2,20 COMP=6,20M
ALT=2,50M CHAPA ACO C/NERV TRAPEZ FORRO C/ISOL TERMO/ACUSTICO
CHASSIS REFORC PISO COMPENS NAVAL EXC
TRANSP/CARGA/DESCARGAMES4.00378.570.00378.571,514.283.06%0.70% 1.
7CB0009ALUGUEL CONTAINER/ESCRIT/WC C/1 VASO/1 LAV/1 MIC/4 CHUV
LARG=2,20M COMPR=6,20M ALT=2,50M CHAPA ACO NERV TRAPEZ FORROC/ ISOL
TERMO-ACUST CHASSIS REFORC PISO COMPENS NAVAL INCL INST
ELETR/HIDRO-SANIT EXCL
TRANSP/CARGA/DESCARGAMES4.00428.920.00428.921,715.683.46%0.79% 1.
8CB0006PLACA DE OBRA EM CHAPA DE ACO
GALVANIZADOM212.00254.8926.62281.513,378.126.82%1.56% 1.
9CV0013TAPUME DE CHAPA DE MADEIRA COMPENSADA, E= 6MM, COM PINTURA A
CAL E REAPROVEITAMENTO DE
2XM2142.0015.0719.9234.994,968.5810.03%2.29%TOTAL ITEM: 1
8,619.1840,935.2849,554.4649,554100%22.83% 2.DEMOLIES E RETIRADAS
2. 1CF0003RETIRADA DE FOLHAS DE PORTA DE PASSAGEM OU
JANELAUN2.000.005.735.7311.460.32%0.01% 2. 2CF0051RETIRADA DE
BATENTES METALICOSUN1.000.0022.9522.9522.950.64%0.01% 2.
3CV0025DEMOLICAO DE ALVENARIA DE ELEMENTOS CERAMICOS
VAZADOSM36.800.0018.7218.72127.293.55%0.06% 2. 4CV0087DEMOLICAO DE
PISO VINILICOM230.000.002.592.5977.702.17%0.04% 2. 5CV0055DEMOLICAO
DE CAMADA DE ASSENTAMENTO/CONTRAPISO COM USO DE PONTEIR O,
ESPESSURA ATE 4CMM2106.280.0011.2311.231193.5233.31%0.55% 2.
6CO0148CARGA MANUAL DE TERRA EM CAMINHAO BASCULANTE (INCLUI O CUSTO
IMPRODUTIVO DIURNO DO CAMINHAO BASCULANTE C/ CACAMBA
4,OM3)M30.006.484.4910.970.000.00%0.00% 2. 7CV0065DEMOLICAO MANUAL
CONCRETO ARMADO (PILAR / VIGA / LAJE) - INCL EMP ILHACAO LATERAL NO
CANTEIROM313.850.00147.11147.112037.4756.87%0.94% 2.
8CV0072RETIRADA DE MEIO FIO C/ EMPILHAMENTO E S/
REMOCAOM28.000.004.014.01112.283.13%0.05%TOTAL ITEM: 2
0.003,582.683,582.683,582.7100%1.65% 3.ESTRUTURA 3. 1CZ9006PROJETO
ESTRUTURAL PARA PREDIOS ESCOLARES E ADMINISTRATIVOS ATE
500M2,APRESENTADO EM AUTOCAD NOS PADROES DA CONTRATANTE,CONSTANDO
DE PLANTAS DE FORMA,ARMACAO E DETALHES,DE ACORDO
CM2112.6543.160.0043.164861.97100.00%2.24%4,861.970.004,861.974,861.97100%2.24%
3. 1. 1FUNDAO 3. 1. 1. 1CH0010ESTACA A TRADO (BROCA) DIAMETRO 30CM
EM CONCRETO ARMADO MOLDADA I N-LOCO, 20
MPAM32.0027.7031.1458.841882.8843.39%0.87% 3. 1. 1.
2CU0800ESCAVACAO MANUAL DE VALAS EM TERRA COMPACTA, PROF. DE 0 M
< H