Page 1: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

RTIO Pilot Plant Experience FeTech 2013

Page 2: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

26 November 2013 RTIO Pilot Plant Experience 2

Recent Pilot Plant History

• 2003 Yandi Scrubbing Pilot Plant

• 2005/6 Marra Mamba BWT Pilot Plant

• 2009 & 2011 IronX Pilot Plant

• 2011 Hybrid Sizer Pilot Plant

• 2012 Low Grade Pilot Plant

Page 3: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

2003 Yandi Low Grade Scrubbing

26 November 2013 RTIO Pilot Plant Experience 3

Page 4: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

2006 Marra Mamba Desliming

26 November 2013 RTIO Pilot Plant Experience 4

Page 5: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

2009 & 2011 IronX

26 November 2013

RTIO Pilot Plant Experience 5

Page 6: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

2011 Hybrid Sizer

26 November 2013

RTIO Pilot Plant Experience 6

Page 7: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

26 November 2013

RTIO Pilot Plant Experience 7

Page 8: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

2012 Low Grade Beneficiation

26 November 2013

Presentation Title 8

Page 9: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

Feed Prep Plant

Page 10: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

Fines Plant (-1mm)

26 November 2013

Presentation Title 10

Page 11: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

Jig Plant

26 November 2013

Presentation Title 11

Page 12: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

Site selection

• Self sufficiency vs integration with Ops (MOU’s)

• Feed sourcing & transport

• Waste disposal

• Land, power, water

• Travel and accommodation availability

26 November 2013

Presentation Title 12

Page 13: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

Low Grade Pilot Plant at Brockman 4

26 November 2013

RTIO Pilot Plant Experience 13

LGPP

BS4 Ops

BS4 LG

BS4 Mine

Page 14: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

HSE learnings

• HSE

– Dust in eye incidents

– Rocks falling

26 November 2013 RTIO Pilot Plant Experience 14

Page 15: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

Falling rock hazard

26 November 2013 RTIO Pilot Plant Experience 15

Page 16: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

HSE learnings

• HSE

– Dust in eye incidents

– Rocks falling

– Isolation procedures

– Access platforms

– HSE support staff

26 November 2013 RTIO Pilot Plant Experience 16

Page 17: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

Plant Design

• Site and Plant design

– Layout – HME separated from plant/operators

26 November 2013 RTIO Pilot Plant Experience 17

Page 18: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

Separating HME, LV and Pedestrians

26 November 2013 RTIO Pilot Plant Experience 18

Page 19: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

Plant Design

• Site and Plant design

– Layout – HME separated from plant/operators

– Scaleability of unit processes

– Matching capacities

– Sampling – Experienced team members to review designs

• Floor spillage and flow interruption

– Flowsheet with flexibility

26 November 2013

RTIO Pilot Plant Experience 19

Page 20: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

Management

• Setting expectations for staff early

• Crew roster and structure

• Staggered crew members or 9/5 for better handovers

• Accommodation! Remember Maslow’s Hierarchy

• Preparation of Safety and Operating systems – allow a skeleton crew

• Early managers safety audit just prior to commissioning

• Control systems support staff

• Deadlines – budget, accommodation, people

• Project finishes when report is complete

26 November 2013 RTIO Pilot Plant Experience 20

Page 21: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

Management (cont.)

• Extent of Laboratory services

– Everything on site (what turnaround)

– Prep on site or send to Perth

• Have all the equipment you might need available

– EWP, water cart, forklift, loaders (IT), trucks, service trailer

• Schedule the construction/commissioning/operations transition

• Plan for decommissioning/removal or care and maintenance

26 November 2013 RTIO Pilot Plant Experience 21

Page 22: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

Feed Collection & Preparation

• Feed collection and homogenisation

– Many oretypes & sufficient quantity

– Incremental shovelling of feed piles

– Use of crushing and screening contractors or production plant

26 November 2013 RTIO Pilot Plant Experience 22

Page 23: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

Stockpiles at the Low Grade Pilot Plant

26 November 2013 RTIO Pilot Plant Experience 23

Page 24: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

Collecting samples with a belt plough

26 November 2013 RTIO Pilot Plant Experience 24

Page 25: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

Feed Collection & Preparation

• Feed collection and homogenisation

– Many oretypes & sufficient quantity

– Incremental shovelling

– Use of crushing and screening contractors or production plan

– Moisture

26 November 2013

RTIO Pilot Plant Experience 25

Page 26: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

Wet Feed

26 November 2013

RTIO Pilot Plant Experience 26

Page 27: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

Feed Collection & Preparation

• Feed collection and homogenisation

– Many oretypes & sufficient quantity

– Incremental shovelling

– Moisture

• Sampling and quality control of feed preparation

– Sizing – regular checks to ensure lump and fines are on spec

– Contamination – preserving a ‘stockpile base’

– Oversize – incorporate trash removal in design

26 November 2013

RTIO Pilot Plant Experience 27

Page 28: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

Marra Mamba Pilot Plant – Oversize Issues

26 November 2013

RTIO Pilot Plant Experience 28

Page 29: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

Low Grade Pilot Plant Oversize and Contamination in Lump

Page 30: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience
Page 31: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

Things you get right but don’t realise the importance at the time • Sample hoists

26 November 2013

RTIO Pilot Plant Experience 31

Page 32: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

Fines Plant Material Hoist

Page 33: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

Things you get right but don’t realise the importance at the time • Sample hoists

• Distributors

26 November 2013

RTIO Pilot Plant Experience 33

Page 34: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

Things you get right but don’t realise the importance at the time • Sample hoists

• Distributors

• Data historians

• Belt filter operation

26 November 2013

RTIO Pilot Plant Experience 34

Page 35: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

Important things you discover

• Up Current Classifier pulsating discharge to filter

26 November 2013

RTIO Pilot Plant Experience 35

Page 36: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

Allflux discharge

26 November 2013

RTIO Pilot Plant Experience 36

Page 37: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

Important things you discover

• Up Current Classifier pulsating discharge to filter

• Retreating primary cyclone overflow prior to WHIMS

• Sand filters on process water

26 November 2013

RTIO Pilot Plant Experience 37

Page 38: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

Important things you discover

• Up Current Classifier pulsating discharge to filter

• Retreating primary cyclone overflow prior to WHIMS

• Sand filters on process water

• Pumping UCC underflow

– Unstable slurry at 35% solids v/v (65% w/w)

26 November 2013

RTIO Pilot Plant Experience 38

Page 39: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

26 November 2013

RTIO Pilot Plant Experience 39

Page 40: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

Technical

• It’s not just a mini gravel washing plant!

• Conveyor weightometer setup and test calibration

• Can’t have too much instrumentation

• Testwork Program

– This can and will change

– Consider duplicates and statistical design

– Plackett Burman, Factorial, Central Rotatable Composite

– Understand variability

• Mass balancing and data analysis

• Take lots of bulk samples

26 November 2013

RTIO Pilot Plant Experience 40

Page 41: Scott Bensley, Rio Tinto Iron Ore: Rio Tinto’s Iron Ore Pilot Plant Experience

Questions?