RELATÓRIO ANALÍTICO - COMPOSIÇÕES DE CUSTOS OBRA:
LOCAL: SiTIO SUTURNO · FARIAS BRITO · CE
CUENTE: EKS CONSTRUÇ0Es E SERVIÇOS L TOA
4.3. C0365- BANQUETA/ MEIO FIO DE CONCRETO MOLDADO NO LOCAL (M)
12391
12543
C0588
C2784
C3211
C326B
PEDREIRO
SERVENTE
CAIAÇÃO EM DUAS DEMÃOS COM SUPERCAL
ESCAVAÇÃO MANUAL SOLO DE 1A.CAT. PROF. ATÉ 1.50m
ESCAVAÇÃO E CARGA DE MATERIAL DE JAZIDA
CONCRETO PN IBR., FCK= 10MPa COM AGREGADO PRODUZIDO (SfTRANSP.)
SE INFRA
SEINFRA
SEINFRA
SEINFRA
SE INFRA
SEINFRA
I
SEINFRA
H
H
M2
M3
M3
M3
~._~~-~~-~~--' 02 • . 1 COM OESONERAÇAo 87.01% 0312016
COMPOSÇ0ESPR0PR~
TOTAL GERAL: 10.658,97
-wrMQ 0,13708535 13,46 1,85
0 ,22847558 9,13 2,09
TOTAL MAO DE OBRA: 3,94
0,91390233 3,00 2,74
TOTAL MATERIAL: 2,74
lVW. ~
0,22847558 3,01 0,69
0 ,01370854 24,18 0,33
0 ,03381439 3,70 0,13
0 ,03107268 260,45 8,09
TOTAL SERVICO: 9,24
VALOR: 15,91
VALOR SEM ENCARGOS: 12,46
VALOR ENCARGOS (87.01%1: 3,46
VALOR COM ENCARGOS: 15,91
VALOR BOI (27.41%1: 4,36
VALOR COM BOI: 20,27~ QUANnDADE: 31 ,50
VALOR TOTAL: 501,16
VALOR BOI TOTAL: 137,34
VALOR TOTAL COM BDI: 638,51
TOTAL GERAL: 638,51
.4. C4624 - PISO PODOTÁTIL EXTERNO EM PMC ESP. 3CM, ASSENTADO COM ARGAMASSA (FORNECIMENTO E ASSENTAMENTO) (M2)
11328
12543 SERVENTE
H 1,46331460 13,46
SE INFRA H 1,14321453 9 ,13
TOTAL MAO DE OBRA: J 19,70
10,44
30,14
M3 0,01664520 46,00 0,77
10441 CAL HIDRATADA SE INFRA KG 2,49678053 0,74 1,85
10805 CIMENTO PORTLAND SEINFRA KG 2,56080054 0,50 1,28
18623 PISOTÁTILALERTA OU DIRECIONAL EM PMC ESP. 3cm SEINFRA M2 1,00602878 25,31 25,46
TOTAL MATERIAL: 29,38
VALOR: 59,49
VALOR SEM ENCARGOS: 46,47
VALOR ENCARGOS (87.01%1: 14,02
59,49~
16,31
VALOR COM ENCARGOS:
VALOR BOI (27.41%1:
Pagina: 3
RELATÓRIO ANALÍTICO - COMPOSIÇÕES DE CUSTOS 003872
LOCAL: SITIO SUTURNO • FARIAS BRITO · CE SEINI'RA
CLIENTE: EKS CONSTRUÇ0ES E SERVIÇOS L TOA
5.1. PMP 01- BANCO DE MADEIRA C/ ESTRUTURA DE FERRO (CONFORME PROJETO) (UNO)
10498
11858
10046
10794
10532
11589
12542
12171
C1256
C0836
C1279
C2667
CARPINTEIRO
SERRALHEIRO
AJUDANTE DE SERRALHEIRO
CHAPA DE AÇO 3116"
PARAFUSO PARA MADEIRA COM CABEÇA REOONDA 5X38
TRAVESSA DE MADEIRA C/SECAO DE 3"X1 1/2"
TUBO AÇO GALVANIZADO DE 50MM (2')
ESCAVAÇÃO MANUAL CAMPO ABERTO EM TERRA ATÉ 2M
CONCRETO NÃO ESTRUTURAL PREPARO MANUAL
ESMALTE DUAS DEMÃOS EM ESQUADRIAS DE FERRO
VERNIZ 3 DEMÃOS EM ESQUADRIAS DE MADEIRA
SEINFRA
SEINFRA
SEINFRA
SEINFRA
SEINFRA
SE INFRA
SEINFRA
SE INFRA
SE INFRA
SE INFRA
SEINFRA
SE INFRA
H
H
H
UN
M2
UN
M
M
M3
M3
M2
M2
02• .1 COM DESONERAçAo
COMPOSIÇOES PROI'RIAS
87.01%
VALOR COM BOI:
QUANnOAOE:
VALOR TOTAL:
VALOR BOI TOTAL:
VALOR TOTAL COM BOI:
0,84432407
1,26648611
0,67545926
TOTAL GERAL:
13,46
13,46
10,47
TOTAL MAO DE OBRA:
3,37729628 2,42
0,06754592 144,78
21 ,95242580 0,20
35,12388128 7,88
6,96567357 31 ,00
TOTAL MATERIAL:
0,06754592 26,74
0,10131889 291 ,13
1,01318888 23,91
2,38943712 14 ,67
TOTAL SERVICO:
VALOR:
VALOR SEM ENCARGOS:
~LOR ENCARGOS (87.01%):
'~ - . . . VALOR COM ENCARGOS:
VALOR BOI (27.41%):
VALOR COI'oll BOI:
QUANTIDADE:
VALOR TOTAL:
VALOR BOI TOTAL:
VALOR TOTAL COI'oll BOI:
TOTAL GERAL:
5.2. C3451 -LIXEIRA EM FIBRA DE VIDRO CAP.=40L e DIAM.=35cm (UN)
....... 12391 PEDREIRO SE INFRA H 1,371 75465 13,46
12543 SERVENTE SEINFRA H 1,37175465 9 ,13
TOTAL MAO DE OBRA:
fiON'I'E 10974 LIXEIRA EM FIBRA DE VIDRO CAP.=40L E DIAM.=35cm SEINFRA UN 0,91450309 221,00
~
3
0312016
75,80j
16,20
963,74
264,22
1.227,96
1.227,96
11 ,36
17,05
7,07
35,48
8 ,17
9 ,78
4 ,39
276,78
215 ,94
515,06
1,81
29,50
24,23
35,05
90,59
641 ,12
600,98
40,14
641,12
175,73 J 816,85
4,00
2.564,48
702,92
3.267,40
3.267,40
18,46
12 ,52
30,98
202,11
Pagina: 4
RELATÓRIO ANALÍTICO - COMPOSIÇÕES DE CUSTOS
LOCAL: SiTIO SUTURNO - FARIAS BRITO - CE
CUENTE: EKS CONSTRUÇ0ES E SERVIÇOS LTOA
C0839 CONC RETO PNIBR., FCK 13.5 MPa COM AGREGADO ADQUIRIDO SE INFRA
C 1604 LANÇAMENTO E APLICAÇÃO DE CONCRETO SI ELEVAÇÃO
6.1. C2090- QUADRO P/ MEDIÇÃO EM POSTE DE CONCRETO (UN)
10042
12312
10126
10285
10338
10355
10436
10551
10841
11071
11243
AJUDANTE DE ELETRICISTA
ELETRICISTA
ARRUELA DE FERRO GALVANIZADO 1 112"
BUCHA DE FERRO GALVANIZADO 1 112"
CABO COBRE NU 25MM2
CABO ISOLADO PVC 750V 10MM2
CAIXA T IPO 'J' 50X60X27CM
CHAVE GERAL3X200A·BASE DE MARMORE
CONECTOR PARA HASTE TERRA
ELETRODUTO DE PVC RIGIOO 112"
HASTE DE ATERRAMENTO COPPERWELD 314" x 3M
SE INFRA
SEINFRA
SEINFRA
SEINFRA
SE INFRA
SE INFRA
SE INFRA
SE INFRA
SE INFRA
SEINFRA
SE INFRA
SE INFRA
SE1NfRA
M3
M3
H
H
UN
UN
M
M
UN
UN
UN
M
UN
024.1 COM DESONERAçAo
COMPOSIÇOES PROI'RIAS
87,01'4
0,02743509
0,02743509
TOTAL MATERIAL:
304,20
81,69
TOTAL SERVICO:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01%):
VALOR COM ENCARGOS:
VALOR BOI (27.41%):
VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
VALOR BOI TOTAL:
VALOR TOTAL COM BOI:
4,38987053
4,38987053
TOTAL GERAL:
10.47
13,46
TOTAL MAO DE OBRA:
COUii:IEH•• ,,..,.,~, 2,74366908 0 ,82
2,74366908 0,96
1,82911272 8,05
0,91455636 4 ,33
0,91455636 74,31
0,914 55636 315,71
0,914 55636 2,35
1,37183454 2,20
0 ,91455636 48,37
11720 POSTE DE CONCRETO 8MX300KG SEINFRA ~0,91455636 542,90 TOTAL MATERIAL:
VALOR:
ri VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01%):
VALOR COM ENCARGOS:
VALOR BOI (27.41%):
VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
VALOR BOI TOTAL:
VALOR TOTAL COM BOI:
TOTAL GERAL:
0312016
202,11
8,35
2,24
10,59
243,68
227,40
16,28
243,68
66,79J
310,.7
1,00
243,68
66,79
310 •• 7
310,.7
RELATÓRIO ANALÍTICO - COMPOSIÇÕES DE CUSTOS OBRA: CONSTRUÇÃO DE PRAÇA PÚBLICA NA CAPELA NOSSA SENHORA l=::---.;.D;.;.AT;.;.A.,...:_1-,9/,;.06/2.:_,:;0,...18'-..--..,_,---,-=:'-~.,;;...;:...._-..,-=M ~----~DO~E~X~P~ED~I~TO~SOC~O~R;.;.R~O~-----------~~~ ~~ LOCAL: SITIO SUTURNO- FARIAS BRITO - CE SEINFRA 024.1 COM DESONERAÇAo 87.01%
CUENTE: EKS CONSTRUÇ0ES E SERVIÇOS LTDA COMPO~ÕESPROPR~
6.2. C3728- CONJUNTO C/04 PÉTALAS E LÂMPADAS VAPOR METÁLICO 400W, MONTADA EM POSTE DE CONCRETO CIRCULAR- H=12M (UN)
-~ ·~'" +',:;~ ~~ ~\d ,... f' .,..l~IPMíGO....,_,I ~_; 10042 AJUDANTE DE ELETRICISTA
1231 2 ELETRICISTA
12543 SERVENTE
10109 AREIA MEDIA
10199 BASE FUSIVEL DIAZED 25A. COMPLETA
10280 BAITA
10805 CIMENTO PORTLAND
11487 LÂMPADA VAPOR METÁLICO DE 400WI220V
11778 REATOR AFP P/ LÂMP. V. METÁLICO 400W
16793 LUMINÁRIA TIPO PÉTALA FAB.REEME REF.: ZE-157 OU SIMILAR
16795 POSTE CONCRETO ARMADO CIRCULAR- H= 12M
16796 CABO POLIFÁSICO - 4 X 2 ,5MM
16799 NÚCLEO P/04 LUMINÁRIAS FAB. REEME REF.:ZE-157 OU SIMILAR
6.3. C1196- ELETROCUTO PVC ROSC.INCL.CONEX0ES D= 25mm (314") (M)
10042
12312
11 075
AJUDANTE DE ELETRICISTA
ELETRICISTA
ELETRODUTO DE PVC RIGIDO 314"
SE INFRA
SE INFRA
SE INFRA
I'Otna
SE INFRA
SEINFRA
SEINFRA
SE INFRA
SE INFRA
SEINFRA
SEINFRA
SEINFRA
SEINFRA
SEINFRA
SE INFRA
SEINFRA
SEINFRA
H
H
H
,rj:sUND M3
UN
M3
KG
UN
UN
UN
UN
M
UN
H
H
M
I
2,46610130 10,47
7,09004123 13,46
24,66101297 9,13
TOTAL MAO DE OBRA:
~ ji'MOO~Mol 0,12908499 46,00
0,77065666 21,21
0,16237735 56,00
40,84480274 0,50
3,08262662 109,60
3,08262662 120,79
3 ,08262662 255,90
0,77065666 883,40
8,47722321 5,20
0,77065666 129,92
TOTAL MATERIAL:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01%):
VALOR COM ENCARGOS:
VALOR BDI (27.41%):
VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
VALOR BDI TOTAL:
VALOR TOTAL COM BOI:
0,27423064
0,27423064
TOTAL GERAL:
10,47
13,46
TOTAL MAO DE OBRA:
1,00551234 3,20
TOTAL MATERIAL:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01%):
VALOR COM ENCARGOS:
VALOR BDI (27.41%):
VALOR COM BOI:
25,82
95,43
225,16
346,41
~~. I 5,94
16,35
9,09
20,42
337.86
372,35
788,84
680,80
44,08
100,12
2375,85
2.722,26
2.661 ,09
161,17
2.722,26
746,17 J 3.468,43
1,00
2.722,26
746,17
3 .468,43
3.468,43
2,87
3,69
6,58
3,22
3,22
9,78
6,73
3 ,06
9,78
2,68 ~ 12,46
Página: 6
RELATÓRIO ANALÍTICO -COMPOSIÇÕES DE CUSTOS
LOCAL: SiTIO SUTURNO - FARIAS BRITO- CE
CUENTE: EKS CONSTRUÇOES E SERVIÇOS LTOA
6.4. C0537 - CABO ISOLADO PVC 750V 6MM2 (M)
10042
12312
AJUDANTE DE ELETRICISTA
ELETRICISTA
6.5. C1030- CÉLULA FOTOELÉTRICA P/ LÂMPADA, ATÉ 1000W (UN)
12312 ELETRICISTA
10502 CELULA FOTOELETRICA P/ LAMPADA 1000W, C/ SUPORTE
SEINFRA
SEINFRA
SEINFRA
SE INFRA
SE INFRA
SEINFRA
H
H
M
H
UN
02• I COM DESONERAÇ}.o
COMPOSIÇOES PROPRIAS
87,0 1%
QUANTIDADE:
VALOR TOTAL:
VALOR BOI TOTAL:
VALOR TOTAL COM BDI:
0,11898696
0,11898696
TOTAL GERAL:
10,47
13,46
TOTAL MAO DE OBRA:
0,93358996 2,52
TOTAL MATERIAL:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01%):
VALOR COM ENCARGOS:
VALOR BOI (27.41%):
VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
VALOR BDI TOTAL:
VALOR TOTAL COM BOI:
TOTAL GERAL:
0,73159996 13,46
TOTAL MAO DE OBRA:
0,91449996 26,40
TOTAL MATERIAL:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01%):
VALOR COM ENCARGOS:
VALOR BOI (27.41%):
VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
VALOR BOI TOTAL:
VALOR TOTAL COM BDI:
TOTAL GERAL:
031201 6
6,70
65,53
17,96
83,48
83,48
1.25
1,60
2,85
2,35
2,35
5,20
3,88
1,32
5,20
1,43 J 6,63
50,10
260,52
71 ,64
332,16
332,16
9,85
17,51
24,14
24,14
41 ,65
33,51
8,14
41 ,65
11,42
63,07
1,00
41,65
11,42/
63,07
63,07
Página: 7
~ RELATÓRIO ANALÍTICO - COMPOSIÇÕES DE CUSTOS 003876
OBRA: CONSTRUÇÃO DE PRAÇA PÚBLICA NA CAPELA NOSSA SENHORA ~~~lltr"lW.. DO EXPEDITO SOCORRO
LOCAL: SiTIO SUTURNO - FARIAS BRITO- CE
CLIENTE: EKS CONSTRUÇ0ES E SERVIÇOS L TOA
6.6. C1127 - DISJUNTOR TRIPOLAR EM QUADRO DE DISTRIBUIÇÃO SOA (UN)
10042
12312
11013
AJUDANTE DE ELETRICISTA
ELETRICISTA
DISJUNTOR TRIPOLAR SOA
,, I SEINFRA
SEINFRA
SE INFRA
::.~ SElNFRA
H
H
UN
DATA : 1910612018 BOI : 27,41 %
~:J':"'if';, .., MOitA 02•,1 COM OESONERAÇÂO 87,0 1'1\
COMPOSIÇ0ES PROPRIAS
0,82309264
0,82309264
10,47
13,46
TOTAL MAO DE OBRA:
TOTAL MATERIAL:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01%):
VALOR COM ENCARGOS:
VALOR BOI(27.41%):
VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
VALOR BOI TOTAL:
VALOR TOTAL COM BOI:
TOTAL GERAL:
- '~~--=· 03/2016
8,62
11,08
19,70
41 ,70
41,70
61,40
52,23
9,17
61 ,40
16,83 v 78,23
1,00
61,40
16,83
78,23
78,23
6.7. C0624- CAIXA EM ALVENARIA (40X40X60cm) DE 1 TIJOLO COMUM, LASTRO DE BRITA E TAMPA DE CONCRETO (UN)
~~: 10040 AJUDANTE DE ARMADOR/FERREIRO SEINFRA H 0,10516390 10,47 1,10
10041 AJUDANTE DE CARPINTEIRO SE INFRA H 0,55325357 10,47 5 ,79
10121 ARMADOR/FERREIRO SE INFRA H 0,10516390 13,46 1,42
10498 CARPINTEIRO SE INFRA H 0,55325357 13 ,46 7,45
12391 PEDREIRO SEINFRA H 4,28245701 13,46 57,64
12543 SERVENTE SE INFRA H 7,43188727 9 ,13 y 67,85 TOTAL MAO DE OBRA: 141,25 10103 ARAME RECOZIDO N.18 BWG SEINFRA KG 0,02011832 9 ,97 0,20
10109 AREIA MEDIA SEINFRA M3 0,13881635 46,00 6,39
10169 AÇOCA-60 SE INFRA KG 1,20435530 4 ,14 4,99
10280 BAITA SE INFRA M3 0,08047324 56,00 4,51
10441 CAL HIDRATADA SEINFRA KG 13,71703077 0,74 10,15
10529 CHAPA COMPENSADO RESINADO 12MM (1 .10 X 2 .20M) SEINFRA M2 0 ,09144687 18,37 1,68
10805 CIMENTO PORTLAND SEINFRA KG 27,43406154 0,50 13,72
11916 TABUA DE 1" DE 3A.- L~ 30cm SE INFRA M 0,02743406 6,18 0,17
12082 TIJOLO MACIÇO COMUM SEINFRA UN 209,41333641 0,25 52,35
·,~:~ TOTAL MATERIAL: 94,16 '~~·-· (~
"~ I r-'~f_? . . f VALOR: 235,40
'.\\J x- •. -~ VALOR SEM ENCARGOS: 169,69 ~~'{:I'~-~'\
~C~~-io~· VALOR ENCARGOS (87.01%): 65,71 VALOR COM ENCARGOS: 235,40
Página: 8
RELATÓRIO ANALÍTICO - COMPOSIÇÕES DE CUSTOS OBRA:
LOCAL: SEINFRA
CUENTE: EKS CONSTRUÇOES E SERVIÇOS L TOA
7.1 . C3447- LIMPEZA DE PISO EM ÁREA URBANIZADA (M2)
12543 SERVENTE SE INFRA H
024 . I COM DESONERAÇÃO
COMPO~ÇOESPRO~S
87,01%
VALOR BOI (27.41%):
VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
VALOR BOI TOTAL:
VALOR TOTAL COM Bot:
TOTAL GERAL:
0,06790944 9,13
TOTAL MAO DE OBRA:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01%):
VALOR COM ENCARGOS:
VALOR BOI (27.41%):
VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
VALOR BOI TOTAL:
VALOR TOTAL COM Bot:
TOTAL GERAL:
0312016
64,52 J 299,92
2,00
-470,80
129,0-4
599,64
599,64
0,62
0,02
0,52
0,33
0,29
0,62
0,11\}J 0,79
115,00
71,30
19,55
90,85
90,86
Página: 9
\J PLANILHA ORÇAMENT ÁR"f,! -~·~ i~n- _.;~~j OBRA: CONSTRUÇAO DE PRAÇA PUBLICA NA CAPELA DE SANTO EXPEDITO DATA : 19/06/2018 BOI : 27,41% ii_~H ~-t,\tN~ IUI"«••:•w ,~ .... .... -- .,, 1!!111& llli MTA-. SITIO CAJUEIRO- FARIAS BRITO- CE ~- -- - - J'l'l .. LOCAL:
SE INFRA 024.1 COM DESONERAÇÃO 87 ,01 o/o 0312016
CLIENTE: EKS CONSTRUÇOES E SERVIÇOS L TOA COMPOSIÇOES PR0PRIAS
'----
:i ~:~ '' - ~·-ti'i .c ·. ·•:•t.:·li,,\i;'l\·iE·~!·iJí;H,jff:;Ai'!i.·::g\•~i;.~~ ·.H· +ojj·f'" ' ~lf·· ' . f' i;,:R:4 t'>' 11
• ' ~·: ·~j~~.fffi!#í': ., 'J'Oil'li!.·'l[" ~~ .... E F~·· ~Q· TD '" !1l~~jlffi~/ttf;l;~~•'1~1\~if! ::~~:~ :'.~,;~: ·: ~ DQC~O
1i! · 11 m·:~::J·;; ~~ n•r10c :~. ~· ···.Jfl>4~~~:~ , a •t •:, i~~ '~ . ·: ,-· ,I y. +vvALC~t UIIITÃMÔíiti
,, ... ~T01'AL:Jú
~: ·t I -- f COM ... -IDI I COI(BOI
1.1
2
2.1
3
3.1
4
4.1
4.2
4.3
4.4
5
5.1
5.2
6
6.1
6.2
6.3
6.4
6.5
6.6
6.7
ADMINISTRAÇÃO DA OBRA
COMP. 01 I ADMINISTRAÇÃO DA OBRA (3,59%)
SERVIÇOS PRELIMINARES
C2102 I RASPAGEM E LIMPEZA DO TERRENO
MOVIMENTO DE TERRA
C2860 I LASTRO DE AREIA ADQUIRIDA
PAVIMENTAÇÃO
C3025 I PISO MORTO CONCRETO FCK=13,5MPa C/PREPARO E LANÇAMENTO
C1586 LADRILHOS HIDRÁULICOS C/ ARGAMASSA DE CAL 1 :4+100KG CIMENTO
C0365
C4624
BANQUETA/ MEIO FIO DE CONCRETO MOLDADO NO LOCAL
PISO PODOTÁTIL ExtERNO EMPMC ESP. 3CM. ASSENTADO COM ARGAMASSA !
~
~ ~
VALOR ORÇAMENTO:
VALOR Blll TOTAL:
VALOR TOTAL:
34.121,10
9.362,61
43.473,71
Quarenta e Trts Mil Quatrocentos e Setenta e Trh reais e Setenta e Um centavos
~ o o w co -.J c.o
.ITI?tA 1
2
3
4
5
6
7
. ,
CRONOGRAMA FÍSICO-FINAN RO OBRA: CONSTRUÇAO DE PRAÇA PUBLICA NA CAPELA DE SANTO EXPEDITO
LOCAL: SíTIO CAJUEIRO- FARIAS BRITO- CE
CLIENTE: EKS CONSTRUÇOES E SERVIÇOS L TOA
DESCRIÇÃO VAL,.OR(R$) ~~S1 •l .. M~2 M~$3 18,00% 15,00% 18,00 %
ADMINISTRAÇÃO DA OBRA 1.499,40 269,89 ' 224,91 ·. 269,89
50,00 % 50,00% SERVIÇOS PRELIMINARES 567,05
2~;53, -~~.~2 40,00 % 30,00 % 20,00 'lo
MOVIMENTO DE TERRA 1.683,19 673,28 504,96 336,64
60.00% PAVIMENTAÇÃO 27.940,34
16,764,20
70,00% PAISAGISMO E URBANIZAÇÃO 5.383,07
3.768,15
INSTALAÇÓES ELÉTRICAS 6.231 ,58
DIVERSOS 169,08
··• ,, · .. · _,:;; ::){1r:;.:.~: "''; . '; 1.226.70 1.013,39 21.138,88 l!'•!i:
RELATÓRIO ANALÍTICO - COMPOSIÇÕES DE CUSTOS 003881 OBRA:
LOCAL:
CLIENTE:
CONSTRUÇÃO DE PRAÇA PÚBLICA NA CAPELA DE SANTO EXPEDITO
SITIO CAJUEIRO - FARIAS BRITO- CE
EKS CONSTRUÇC>ES E SERVIÇOS L TOA
1-1. COMP. 01 -ADMINISTRAÇÃO DA OBRA (3,59%) (MÊS)
12543 SERVENTE SE INFRA
12543
10108 AREIA GROSSA SEINFRA
H
M3
COMPOSIÇÕES PRÓPRIAS
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS:
VALOR COM ENCARGOS:
VALOR BOI (27.41'1.):
VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
VALOR BOI TOTAL:
VALOR TOTAL COM BOI:
TOTAL GERAL:
~jiío 0,23658280 9 ,13
TOTAL MAO DE OBRA:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01'1.):
VALOR COM ENCARGOS:
VALOR BOI (27.41'1.):
VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
VALOR BOI TOTAL:
VALOR TOTAL COM BOI:
TOTAL MAO DE OBRA:
1,08586040 50.00
TOTAL MATERIAL:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01'1.):
VALOR COM ENCARGOS:
VALOR BOI (27.41'1.):
VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
196,14
196,14
0,00
196,14
53,76 J 249,90
6,00
1.176,84
322,56
1.499,40
1.499,40
2 , 16
2,16
2,16
1,16
1,00
2,16
0,59 J 2,75
206,20
445,39
121,66
567,05
11,21
54,29
54,29
65,50
60,28
5,22
65,50
17,95. \
83,45 \J 20,17
1.321,14
Pâgina. 1
~
RELATÓRIO ANALÍTICO - COMPOSIÇÕES DE CUSTOS 003882
12391
12543
C0839
PEDREIRO
SERVENTE
OBRA:
LOCAL:
CUENTE:
CONSTRUÇÃO OE PRAÇA PÚBLICA NA CAPELA OE SANTO EXPEDITO
SiTIO CAJUEIRO - FARIAS BRITO- CE
EKS CONSTRUÇ0ES E SERVIÇOS L TOA
SEINFRA
SE INFRA
CONCRETO PNIBR., FCK 13.5 MPa COM AGREGADO ADQUIRIDO
SEJNFRA
H
H
M3
4.2. C1586- LADRILHOS HIDRÁULICOS C/ARGAMASSA DE CAL1 :4+100KG CIMENTO (M2)
-~--· ';, -~ ~ "'~~ ~~,_,;,, ;,.~ ~ i~ -~- ~~ ]~ -~FGifrlj 11328
10109
10441
10805
11332
LADRILHISTA
SERVENTE
AREIA MEDIA
CAL HIDRATADA
CIMENTO PORTLAND
LADRILHO HIDRAULICO DE UMA COR
SE INFRA
SEINFRA
SEINFRA
SEINFRA
SE INFRA
SEINFRA
H
H
M3
KG
KG
M2
87,01%
COMPOSIÇÕES PRÓPRIAS
VALOR BOI TOTAL:
VALOR TOTAL COM BOI:
1,88924574
5,66773721
TOTAL GERAL:
13.46
9,13
TOTAL MAO DE OBRA:
0,94462287 304,20
TOTAL SERVICO:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01%):
VALOR COM ENCARGOS:
VALOR BOI (27.41%):
VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
VALOR BOI TOTAL:
VALOR TOTAL COM BOI:
1,51162251
1,18095508
TOTA L GERAL:
13.46
9,13
TOTAL MAO DE OBRA:
0,01719470 46,00
2,57920590 0,74
2,64533939 0,50
1,03924047 40,50 .f TOTAL MATERIAL:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01%):
VALOR COM ENCARGOS:
VALOR BOI (27.41%):
VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
VALOR BOI TOTAL:
VALOR TOTAL COM BOI:
0312016
362,05
1.583,19
1.583,19
25,43
51,75
n ,1a
287,35
287,35
364,53
300,35
64,18
364,53
99,92
464,45~ 12,10
4.410,81
1.209,03
5.619,85
5.619,85
20,35
10,78
31,13
0,79
1,91
1,32
42,09
46,11
77,24
62,76
14,48
77,24
21 ,17~ 98,41
201 ,72
15.580,85
4.270,41
19.851,27
Pégina: 2
RELATÓRIO ANALÍTICO - COMPOSIÇÕES DE CUSTOS 003883 r~ ·. ~ ;-;,
:ftt"t;;:t Jot~·~:.::GI~ ..... ,1;'-':11.. .. 1-.:r.. OBRA: CONSTRUÇÃO DE PRAÇA PÚBLICA NA CAPELA DE SANTO
EXPEDITO ·-
LOCAL: SITIO CAJUEIRO · FARIAS BRITO · CE
CUENTE: EKS CONSTRUÇ0ES E SERVIÇOS L TOA
4.3. C0365- BANQUETA/ MEIO FIO DE CONCRETO MOLDADO NO LOCAL (M)
12391
12543
C0588
C2784
C3211
C3268
11328
12543
10109
10441
10805
18623
PEDREIRO
SERVENTE
CAIAÇÃO EM DUAS DEMÃOS COM SUPERCAL
ESCAVAÇÃO MANUAL SOLO DE 1A.CAT. PROF. ATÉ 1.50m
ESCAVAÇÃO E CARGA DE MATERIAL DE JAZIDA
CONCRETO PIVIBR., FCK=10MPa COM AGREGADO PRODUZIDO (SITRANSP.)
LADRILHISTA
SERVENTE
AREIA MEDIA
CAL HIDRATADA
CIMENTO PORTLAND
PISO TÁTIL ALERTA OU DIRECIONAL EM PMC ESP. 3cm
SE INFRA
S EINFRA
SE INFRA
SE INFRA
S E INFRA
S E INFRA
SEINFRA
S EINFRA
S EINFRA
S E INFRA
S E INFRA
DATA: 1910612018 BOI : 27.41 % .... SEINFRA
H
H
M2
M3
M3
M3
H
H
M3
KG
KG
M2
!~
-.ia L -024.1 COM DESONERAÇÃO 87.01% COMPOSK;OES PROPRIAS
0,14173792
0,23622986
TOTAL GERAL:
13,46
9,13
TOTAL MAO DE OBRA:
0.23622986
0,01417379
0.03496202
0.03212726
TOTAL MATERIAL:
3.0 1
24,18
3.70
260.45
TOTAL SERVICO:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01%):
VALOR COM ENCARGOS:
VALOR BOI (27.41%):
VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
VALOR BOI TOTAL:
VALOR TOTAL COM BOI:
1,51103320
1,18049469
TOTAL GERAL:
13,46
9,13
TOTAL MAO DE OBRA:
~ 0,0171 8801 46,00
2 ,57820040 0,74
2 .64430811 0,50
1.03883532 25.31
TOTAL MATERIAL:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01%):
VALOR COM ENCARGOS:
VALOR BOI (27.41%):
~
lllíl ~- '5 0312018
19.861 ,27
1,91
2 ,16
4,07
2,83
2,83
JOfA!o. ~ 0 .71
0 ,34
0 ,13
8 ,37
8,55
16,45
12,87
3,68
16,46
4,51.)
20,96
46,10
741 ,90
203,40
946,30
946,30
20,34
0 ,79
1,91
1,32
26,29
30,31
61 ,43
46,95
14,48
61 ,43
16,84
Pàgina. 3
RELATÓRIO ANALÍTICO - COMPOSIÇÕES DE CUSTOS 003884 OBRA: CONSTRUÇÃO DE PRAÇA PÚBLICA NA CAPELA DE SANTO
EXPEDITO
LOCAL: SITIO CAJUEIRO · FARIAS BRITO • CE
CUENTE: EKS CONSTRUÇÓES E SERVIÇOS L TOA
SEJNFRA
5.1 . PMP 01 - BANCO DE MADEIRA C/ ESTRUTURA DE FERRO (CONFORME PROJETO) (UNO)
10498
11858
10046
10794
10532
11589
12542
1217 1
C1256
C0836
C1279
C2667
CARPINTEIRO
SERRALHEIRO
AJUDANTE DE SERRALHEIRO
CHUMBADOR TIPO PARABOULT 318 X 3 1/2'
CHAPA DE AÇO 3116'
PARAFUSO PARA MADEIRA COM CABEÇA REDONDA 5X38
TRAVESSA DE MADEIRA CISECAO DE 3'X1 1/2'
TUBO AÇO GALVANIZADO DE SOMM (2')
ESCAVAÇÃO MANUAL CAMPO ABERTO EM TERRA ATÉ 2M
CONCRETO NÃO ESTRUTURAL PREPARO MANUAL
ESMALTE DUAS DEMÃOS EM ESQUADRIAS DE FERRO
VERNIZ 3 DEMÃOS EM ESQUADRIAS DE MADEIRA
5.2. C3451 -LIXEIRA EM FIBRA DE VIDRO CAP.=40l e DIAM.=35cm (UN)
12543 SERVENTE
10974
SEINFRA H
SEINFRA H
SEINFRA H
SEINFRA UN
SEINFRA M2
SEINFRA UN
SEINFRA M
SE INFRA M3
SE INFRA M3
SE INFRA M2
SE INFRA M2
SE INFRA H
SEINFRA UN
87,01%
COMPOSIÇÓES PRÓPRIAS
VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
VALOR BOI TOTAL:
VALOR TOTAL COM BOI:
TOTAL GERAL:
0 ,87211176 13.46
1,30816764 13,46
0 ,69768941 10.47
TOTAL MAO DE OBRA:
3 ,48844703 2.42
0 ,06976894 144,78
22,67490573 0,20
36,27984916 7,88
7,19492201 31 ,00
TOTAL MATERIAL:
0,06976894 26,74
0 ,10465341 291 ,13
1,04653411 23,91
2,46807627 14,67
TOTAL SERVICO:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01%):
VALOR COM ENCARGOS:
VALOR BOI (27.41'/o):
VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
VALOR BOI TOTAL:
VALOR TOTAL COM BOI:
1,41690152
TOTAL GERAL:
13,46
9 .13
TOTAL MAO DE OBRA:
0 ,94460101 221,00
§
0312016
78,27 ·J
19,47
1.196,04
327,87
1.523,92
1.523,92
11,74
17,61
7,30
36,65
8 ,44
10,10
4,53
285,89
223,04
532,00
1,87
30,47
25,02
36,21
93,57
662,22
620,75
41,47
662,22
181,51 J 843,73
6,00
3.973,32
1.089,06
5 .062,38
5.062,38
19,07
12,94
32,01
208,76
Pllgina: 4
RELATÓRIO ANALÍTICO -COMPOSIÇÕES DE CUSTOS
C0839
C1604
OBRA: CONSTRUÇÃO DE PRAÇA PÚBLICA NA CAPELA DE SANTO EXPEDITO
LOCAL: SÍTIO CAJUEIRO • FARIAS BRITO • CE
CLIENTE: EKS CONSTRUÇOES E SERVIÇOS L TOA
CONCRETO PNIBR., FCK 13.5 MPa COM AGREGADO ADQUIRIDO
LANÇAMENTO E APLICAÇÃO DE CONCRETO SI ELEVAÇÃO
SE INFRA
SE INFRA
6.1. C2090 · QUADRO P/ MEDIÇÃO EM POSTE DE CONCRETO (UN)
10042 AJUDANTE DE ELETRICISTA SE INFRA
SEJNFRA
M3
M3
H
12312 ELETRICISTA SEIN~H
10126 ARRUELA DE FERRO GALVANIZADO 1 112" SEINFRA UN
10285 BUCHA DE FERRO GALVANIZADO 1 1/2" SEINFRA UN
10338 CABO COBRE NU 25MM2 SEINFRA M
10355 CABO ISOLADO PVC 750V 10MM2 SEINFRA M
10436 CAIXA TIPO 'J' 50X60X27CM SEINFRA UN
10551 CHAVE GERAL 3X200A-BASE DE MARMORE SE INFRA UN
10841 CONECTOR PARA HASTE TERRA SEINFRA UN
11071 ELETRODUTO DE PVC RIGIOO 112" SEINFRA M
11243 HASTE DE ATERRAMENTO COPPERWELD 3/4" x 3M SEINFRA UN
11720 POSTE DE CONCRETO 8MX300KG SE INFRA UN
024.1 COM OESONERAÇAo
COMPOSIÇÕES PR0PR1AS
87,01%
0,02833803
0,02833803
TOTAL MATERIAL;
304,20
81 ,69
TOTAL SERVICO:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01%):
VALOR COM ENCARGOS:
VALOR BOI (27.41%):
VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
VALOR BOI TOTAL:
VALOR TOTAL COM BOI:
TOTAL GERAL:
4,53435082 10,47
4,53435082 13,46
TOTAL MAO DE OBRA:
2,83396926 0,82
2,83396926 0,96
1,88931284 8,05
0,94465642 4,33
0,94465642 74,31
0,94465642 315,71
0,94465642 2,35
1,41698463 2,20
0,94465642 48,37
0,94465642 542,90
TOTAL MATERIAL:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01%):
VALOR COM ENCARGOS:
VALOR BOI (27.41%):
VALOR COM BOI:
QUANnDADE:
VALOR TOTAL:
VALOR BOI TOTAL:
VALOR TOTAL COM BOI:
TOTAL GERAL:
003885
f
03/2016
208,76
8,62
2,31
10,93
251 ,70
234,89
16,81
251,70
68,99 j
320,69
1,00
251 ,70
68,99
320,69
320,69
47.47
61 ,03
108,50
2,32
2,72
15,21
4,09
70,20
298,24
2,22
3,12
45,69
512,85
956,66
1.065,17
1.014,69
50,48
1.065,17
291,96 j 1.357,13
1,00
1.065,17
291 ,96
1.357,13
1.357,13
Pégina: 5
RELATÓRIO ANALÍTICO -COMPOSIÇÕES DE CUSTOS 003886 OBRA: CONSTRUÇÃO DE PRAÇA PÚBLICA NA CAPELA DE SANTO
SEINFRA 87,01% ~·
03/2015
1------+--=EX-"-P-=E=-DI-'-TO;:..._ _______________ L.~..-. .
SiTIO CAJUEIRO· FARIAS BRITO· CE LOCAL:
CLIENTE: EKS CONSTRUÇÓES E SERVIÇOS L TOA COMPOSIÇOES PROPRIAS
6 .2. C3728 - CONJUNTO C/04 PÉTALAS E LÂMPADAS VAPOR METÁLICO 400W, MONTADA EM POSTE DE CONCRETO CIRCULAR - H=12M (UN)
10805 CIMENTO PORTLAND SE INFRA KG 42,18931344 0,50 21 ,09
TOTAL MATERIAL: 21,09
I ? - ~~ ~ « 12543 SERVENTE SEINFRA H 25.47279302 9.13 232.57
TOTAL MAO DE OBRA: 232,57
16796 CABO POLIFÁSICO • 4 X 2,5MM SEINFRA M 8,75627260 5.20 45,53
TOTAL MATERIAL: 45,53
~ Ílli'rAiliO 13,46 98,57
TOTAL MAO DE OBRA: 98,57
I:: · li;lli;
11487 Li.MPADAVAPOR METÁLICO DE 400W/220V SEINFRA UN 3,18409913 109,60 348,98
11778 REATOR AFP P/ Li.MP. V. METÁLICO 400W SEINFRA UN 3,18409913 120.79 384.61
16793 LUMINÁRIA TIPO PÉTALA FAB.REEME REF.: ZE·157 OU SIMILAR SE INFRA UN 3,18409913 255,90 814,81
TOTAL MATERIAL: 1548,40
-:;~ .... OMA
10042
I·· MA1'11J1Aa. • .. ~ 10199 BASE FUSIVEL DIAZED 25A. COMPLETA SE INFRA UN 0.79602478 21 .21 16,88
16795 POSTE CONCRETO ARMADO CIRCULAR • H= 12M SE INFRA UN 0,79602478 883,40 703,21
16799 NÚCLEO P/04 LUMINÁRIAS FAB. REEME REF.:ZE-157 OU SIMILAR SE INFRA UN 0,79602478 129.92 103,42
10280 BRITA SE INFRA M3 O, 16772242 56,00 9 ,39
10109 AREIA MEDIA SE INFRA M3 O, 13333416 46.00 6 ,13
TOTAL MATERIAL: 839,03
VALOR: 2.811,87
VALOR SEM ENCARGOS: 2.645,38
VALOR ENCARGOS (87.01%}: 166,49
VALOR COM ENCARGOS: 2.811 ,87
VALOR BOI (27.41%}: 770,73 J \"~ VALOR COM BOI: . ""' 3.582,60 \\~··· l\~ QUANTIDADE: 1,00 C..\S l ':t ... ~ ~) VALOR TOTAL: 2 .811 ,87 . ~~ ~() . VALOR BOI TOTAL: 770,73
';s'J~~ G~~~~~ VALOR TOTAL COM BOI: 3.582,60 ~ TOTAL GERAL: 3.582,60
6 .3. C1196- ELETROCUTO PVC ROSC.INCL.CONEXÕES D= 25mm (314") (M)
~ ·PMtQ~.Mio t::
10042 AJUDANTE DE ELETRICISTA SEINFRA H 0,28320517 10,47 2,97
~ Pégina: 6
RELATÓRIO ANALÍTICO - COMPOSIÇÕES DE CUSTOS OBRA: CONSTRUÇÃO DE PRAÇA PÚBLICA NA CAPELA OE SANTO DATA : 19/0612018
~--------~E~X~PE=D~IT~O~------------------------------~.~~ .~~ SÍTIO CAJUEIRO - FARIAS BRITO - CE SEJNFRA 024.1 COM DESONERAÇ1.o LOCAL: 87,01 '14
1-C-U_E_N_TE_:----j--E-K_S_C_O-NS_T_R_UÇ_OE-::-S- E--SE_R_VI_Ç_O_S_L_TD_A ______________ ---1 COMPOStÇOES PRÓPRIAS
12312 ELETRICISTA SEINFRA H 0,28320517 13,46
TOTAL MAO DE OBRA:
TOTAL MATERIAL:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01%):
VALOR COM ENCARGOS:
VALOR BOI (27.41%):
VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
VALOR BOI TOTAL:
VALOR TOTAL COM BOI:
TOTAL GERAL:
6.4. C0537 - CABO ISOLADO PVC 750V 6MM2 (M) ..... _ 10042
12312
AJUDANTE DE ELETRICISTA
ELETRICISTA
6.5. C1030- CÉLULA FOTOELÉTRICA P/ LÂMPADA, ATÉ 1000W (UN)
12312 ELETRICISTA
10502
SEINFRA
SE INFRA
SEINFRA
SEINFRA
H
H
ri H
0,12219068
0 ,12219068
10,47
13,46
TOTAL MAO DE OBRA:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01%):
VALOR COM ENCARGOS:
VALOR BOI (27.41%):
VALOR COM BOI:
""""" .. " § VALOR TOTAL:
VALOR BOI TOTAL:
VALOR TOTAL COM BOI:
TOTAL GERAL:
0 ,75566505 13,46
TOTAL MAO DE OBRA:
0312016
3,81
6,78
3,32
10,10
6,96
3,16
10,10
2,77
12,87"'
10,00
101,00
27,70
128,70
128,70
1,28
1,64
2,92
6,34
3,98
1,36
6,34
1,46J
6,80
60,00
320,40
87,60
408,00
408,00
10.17
18,08
Pilgina: 7
RELATÓRIO ANALÍTICO - COMPOSIÇÕES DE CUSTOS 003888 OBRA:
LOCAL:
CLIENTE:
CONSTRUÇÃO DE PRAÇA PÚBLICA NA CAPELA DE SANTO EXPEDITO
SÍTIO CAJUEIRO - FARIAS BRITO -CE
EKS CONSTRUÇ0ES E SERVIÇOS L TOA
. C1127- DISJUNTOR TRIPOLAR EM QUADRO DE DISTRIBUIÇÃO SOA (UN)
10042 AJUDANTE DE ELETRICISTA
12312 ELETRICISTA SEINFRA
11013 DISJUNTOR TRIPOLAR 50A SEINFRA
SEINfRA 024.1 COM OESONERAÇAo
COMPOSIÇÓES PRÓPRIAS
87,01%
TOTAL MATERIAL:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01%):
VALOR COM ENCARGOS:
VALOR BOI (27.41%):
VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
VALOR BOI TOTAL:
VALOR TOTAL COM BOI:
TOTAL GERAL:
H 0,84990412 10,47
H 0,84990412 13,46
TOTAL MAO DE OBRA:
UN 0,94433792 4 5,60
TOTAL MATERIAL:
VALOR:
VALOR SEM ENCARGOS:
~ VALOR ENCARGOS (87.01%):
VALOR COM ENCARGOS:
VALOR BOI (27.41% ):
ti VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
VALOR BOI TOTAL:
VALOR TOTAL COM BOI:
TOTAL GERAL:
6.7. C0624- CAIXA EM ALVENARIA (40X40X60cm) DE 1 TIJOLO COMUM, LASTRO DE BRITA E TAMPA DE CONCRETO (UN)
10040
10041
10121
10498
12391
12543
10 103
10109
AJUDANTE DE ARMADOR/FERREIRO
AJUDANTE DE CARPINTEIRO
ARMADO R/FERREIRO
CARPINTEIRO
PEDREIRO
SERVENTE
ARAME RECOZIDO N.18 BWG
AREIA MEDIA
SE INFRA
SEINFRA
SEINFRA
SEINFRA
SEINFRA
SEINFRA
SE INFRA
SEINFRA
H
H
H
H
H
H
KG
M3
0,10862174
0,57144479
0,10862174
0,57144479
4,42326601
7,67625087
10,47
10,47
13.46
13,46
13,46
9,1 3
TOTAL MAO DE OBRA:
0,02077981
0.14338069
9,97
46,00
03/2016
24,114
43,02
34,61
8,41
43,02
11 ,79 J 54,81
1,00
43,02
11 ,79
54,81
54,81
8,90
11,44
20,34
43,06
43,06
63,40
53,94
9 ,46
63,40
17,38 J 80,78
1,00
63,40
17,38
80,78
80,78
1,14
5,98
1 ,46
7 ,69
59.54
70,08
145,89
0,21
6,60
Pagina: 8
RELATÓRIO ANALÍTICO -COMPOSIÇÕES DE CUSTOS 003889 OBRA: CONSTRUÇÃO DE PRAÇA PÚBLICA NA CAPELA DE SANTO
EXPEDITO
LOCAL: SiTIO CAJUEIRO - FARIAS BRITO - CE
CUENTE: EKS CONSTRUÇ0ES E SERVIÇOS L TOA
10169 AÇO CA-60 SEINFRA
10280 BAITA SEINFRA
10441 CAL HIDRATADA SE INFRA
10529 CHAPA COMPENSADO RESINAOO 12MM (1.10 X 2.20M) SE INFRA
10805 CIMENTO PORTLAND SEINFRA
11916 TABUADE1 ' DE3A.·L=30cm SEINFRA
12082 TIJOLO MACIÇO COMUM SE INFRA
7.1. C3447 - LIMPEZA DE PISO EM ÁREA URBANIZADA (M2)
12543
KG
M3
KG
M2
KG
M
UN
COMPOSIÇÓES PRÓPRIAS
1,24395501 4 ,14
0 ,08311924 56,00
14,16805256 0 ,74
0,09445368 18,37
28,33610512 0,50
0 ,02833610 6 ,18
216,29893572 0 ,25
TOTAL MATERIAL:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01%):
VALOR COM ENCARGOS:
VALOR BOI (27.41%):
VALOR COM BOI:
QUANTIOADE:
VALOR TOTAL:
VALOR BOI TOTAL:
VALOR TOTAL COM BOI:
TOTAL GERAL:
9,13
TOTAL MAO DE OBRA:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01%):
VALOR COM ENCARGOS:
VALOR BOI (27.41'/o ):
VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
VALOR BOI TOTAL:
VALOR TOTAL COM BOI:
TOTAL GERAL:
5,15
4 ,65
10,48
1,74
14,17
0,18
54,07
97,25
243,14
175,27
67,87
243,14
66,64 J 309,78
2,00
486,28
133,28
619,66
619,66
0 ,64
0,64
0 ,64
0 ,34
0 ,30
0 ,64
0 ,18J
0,82
206,20
131 ,97
37,12
169,08
169,08
Pégina: 9
\;) PLANILHA ORÇAMENT ÁR;,; ~;6\l'f~ OBRA: CONSTRUÇAO DE PRAÇA PUBLICA NA CAPELA DE SANTO EXPEDITO DATA : 19/06/2018 BOI: 27,41% . tii,"",. ... Wft .. • &;~ L '--~ · - - :C): ~ •:; t! ~~ - --·~nn !Jo~~· ~~
LOCAL: SITIO FRESCO- FARIAS BRITO- CE SEINFRA 024.1 COM DESONERAÇÃO 87,01% - 03/2016
CLIENTE: EKS CONSTRUÇOES E SERVIÇOS L TOA COMPOSIÇOES PR0PRIAS
-- - --- -
:;:• Ji!,l:•\ltl' ·~J! '. . '· ~i4 : ,., . VÁLÓit IJIIrtÁIUC) .. •\~• .. a:,;rJ; ~;·ii~•'\\(1 }·,,.,1, 'F!!ii\i.. tr,Jl~Jl.RC~HC~O· .,;:, . '·' · · , . ,. . . ,.,. ·,)%!• ./iF;:" "lh?ÜJ:m·.l\JwJI .. ~:.,. ,\hi;•,,!;\'iéilTii"' - --;:;!1,: "'' ,j,·· I•IDt,l ~., CCII..,. ·i·'C!OM• ·" '
1.1 COMP. 01 I ADMINISTRAÇÃO DA OBRA (3,59%)
2 I SERVIÇOS PREUMINARES
2.1 C2102 RASPAGEM E LIMPEZA DO TERRENO
3 I MOVIMENTO DE TERRA
3.1 C2860 LASTRO DE AREIA ADQUIRIDA
4 !PAVIMENTAÇÃO
4.1 C3025
4.2 C1586
4.3 C0365
4.4 C4624
PISO MORTO CONCRETO FCK=13,5MPa C/PREPARO E LANÇAMENTO
LADRILHOS HIDRÁULICOS C/ARGAMASSA DE CAL 1:4+100KG CIMENTO
BANQUETA/ MEIO FIO DE CONCRETO MOLDADO NO LOCAL
PISO PODOTÁTIL EXTERNO EM PMC ESP. 3CM, ASSENTADO COM ARGAMASSA I (FORNECIMENTO E ASSENTAMENTO)
5 I PAISAGISMO E URBANIZAÇÃO
5.1
5.2
6
6.1
6 .2
6 .3
6.4
6.5
6.6
6.7
PMP01 BANCO DE MADEIRA C/ ESTRUTURA DE FERRO (CONFORME PROJETO)
C3451 I LIXEIRA EM FIBRA DE VIDRO CAP.=40L e DIAM .=35cm ~ INSTALAÇÕES ELÉTRICAS -~
C2090
C3728
C1196
C0537
C1030
C1127
C0624
QUADRO P/ MEDIÇÃO EM POSTE DE CONCRETO ~ CONJUNTO C/04 PÉTALAS E LÂMPADAS VAPOR METÁLICO 400W, MONTADA EM POSTE DE CONCRETO CIRCULAR- H=12M
ELETRODUTO PVC ROSC.INCL.CONEXÓES O= 25mm (3/4")
CABO ISOLADO PVC 750V 6MM2
CÉLULA FOTOELÉTRICA P/ LÂMPADA, ATÉ 1000W
DISJUNTOR TRIPOLAR EM QUADRO DE DISTRIBUIÇÃO SOA
CAIXA EM ALVENARIA (40X40X60cm) DE 1 TIJOLO COMUM, LASTRO DE BRITA E TAMPA DE CONCRETO
7 !DIVERSOS
M~S 6,00, 161 ,55
SEINFRA M2 171,001 2 ,14
SEINFRA M3 16,62 1 64,82
SEINFRA M3 9,97 360,63
SEINFRA M2 166,24 76.40
SEINFRA M 31,44 16,29
SEINFRA M2 21,40 60,79
PROPRIA UNO 4,00 655,16
SEINFRA UN 2,00 249,02
SEINFRA UN 1,00 1.053,80
SEINFRA UN 1,00 2.781,85
SEINFRA M 10,00 10,00
SEINFRA M 60,00 5,32
SEINFRA UN 1,00 42,57
SEINFRA UN 1,00 62,75
SE INFRA UN 2,00 240,57
7.1 I C3447 I LIMPEZA DE PISO EM ÁREA URBANIZADA ...--"' I SEINFRA I M2 I 171 ,00 I 0,64
969,30 1.234,98
205,83 969,30 1.234,98
365,94 466,83
2,73 365,94 466,83
1.077,31 1.372,65
82,59 1.077,31 1.372,65
18.1 09,29 23.072,94
459.48 3.595,48 4.581 ,02
97,34 12.700,74 16.181,80
20,76 512,16 652,69
77,45 1.300,91 1.657,43
3.118,68 3.973,52
834,74J 2.620,64 3.338,96
317,28 1 498,04 634,56
4.841,31 6.168,42
1.342,65 1.053,80 1.342,65
3 .544,36 2 .781,85 3.544,36
12,74 100,00 127,40
6,78 319,20 406,80
54,24 42,57 54,24
79,95 62,75 79,95
306,51 481 ,14 613,02
109,44 140,22
0,82 1 109,44 140,22
... .~:~\~~~~t:111\~~\\\~~~~~t;~~~:.. • .. ilii[Í:i ,. ,\iu;~:;·~~r:"1\.1:~\tj·\:~:\'~\:'.\1'-;~i\;:. ·· " •! :''}\~M1:~~~";~v;\~:;~l:~~~~:·;;:l,~!. ;. .. t
.. ''\h . . . nm;;,,h,l\hli.J~"~~~~t\I,.I\111\~IU\~1~:;\\- ~~- · ; ,·>-~·· "1''\rn, !~~1:;\t'''ul>._'·'''_--'·h\\\\(4';\\;:;:• . . . . . , t
e
~ ~
e VALOR ORÇAMENTO: VALOR 801 TOTAL:
VALOR TOTAL:
21.591 ,27
7.131,29
36.429,56
Trinta e Seis Mil Qu.trocentos e VInte e Nove re•la e Clnquenta e Seis centavos
~
o o w 00 c..c .....
RO OBRA: CONSTRUÇÀQ DE PRAÇA PúBLICA NA-CAPELA DESANTO EXPEDITO , ... ~:a~L .. , ru~~.~~;;
-h~' "'""""·"·-~.--- .. I LoCAL: !siTIO FREsco- FARIAS BRITO - c E I SE INFRA 024.1 COM DESONERAÇÃO
COMPOSIÇÓES PRÓPRIAS CLIENTE: EKS CONSTRUÇOES E SERVIÇOS L TOA
DESCRIÇ~O ';
VALOR(R$) ,M~St Mê:S2 M~S3. ''' M&t).4, ,,· " M~S6 · i ' M~S6 · Total parcela nEM ''· ·;r, · 18,00 % 15,00% 18,00 % 18,00% 20,50% 10,50 % 100,00 %
1 ADMINISTRAÇÃO DA OBRA 1.234,98 ' 222,30 :.> .185,25 .,,: 222;30 _;f '' ~;30 : 1 • ;':W253,f7 .:.·" i 1'29,66 1.234,98
50,00 % 50,00 % 100,00 % 2 SERVIÇOS PRELIMINARES 466,83 . ,! 233,42 •• 233,41' 466,83 ' ~:·
40,00 % 30,00 % 15,00 % 15,00% 100,00 % 3 MOVIMENTO DE TERRA 1.372,65 ,, o ' 549,06 : 411 ,80 . 205,90 205,89 1.372,65
70,00 % 30,00% 100,00 % 4 PAVIMENTAÇÃO 23.072,94
16.151;06 6.921,88 23.072,94 70,00 % 30,00% 100,00 %
5 PAISAGISMO E URBANIZAÇÃO 3.973,52 2.781,46 1.192,06 3.973,52
30,00% 20,00% 50,00 % 100,00 % 6 INSTALAÇCES ELÉTRICAS 6.168,42
1.850,53 I ' 1.233.68' 3.084,21 6.168,42
7 DIVERSOS 140,22 100,00 % 100,00 %
14
RELATÓRIO ANALÍTICO - COMPOSIÇÕES DE CUSTOS OBRA: CONSTRUÇÃO OE PRAÇA PÚBLICA NA CAPELA OE SANTO
EXPEDITO
LOCAL: SiTIO FRESCO - FARIAS BRITO- CE
CLIENTE: EKS CONSTRUÇ0ES E SERVIÇOS L TOA
1.1. COMP. 01 - ADMINISTRAÇÃO DA OBRA (3,59%) (M~S)
12543 SERVENTE
3.1. C2860 - LASTRO DE AREIA ADQUIRIDA (M3)
12543 SERVENTE SEINFRA
10108 AREIA GROSSA SEINFRA
SEINFRA
H
H
M3
024.1 COM DESONERAÇAo
COMPOSIÇOES PRÓPRIAS
87.01%
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS:
VALOR COM ENCARGOS:
VALOR BOI (27.41%):
VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
VALOR BOI TOTAL:
VALOR TOTAL COM BOI:
0,23438819 9,13
TOTAL MAO DE OBRA:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01%):
VALOR COM ENCARGOS:
VALOR BOI (27.41%):
~ VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
VALOR BOI TOTAL:
VALOR TOTAL COM BOI:
TOTAL GERAL:
1,21474965 9,13
TOTAL MAO DE OBRA:
1,07458623 50,00
TOTAL MATERIAL:
ç_ftr VALOR: VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01%):
VALOR COM ENCARGOS:
VALOR BOI (27.41%):
VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
0312016
161,66
161,66
0,00
161 ,66
44,281
206,83
6,00
969,30
266,68
1.234,98
2,14
2,14
2,14
1,14
1,00
2,14
0,69 J 2,73
171,00
366,94
100,89
466,83
466,83
11,09
11 ,09
53,73
53,73
64,82
69,66
6,16
64,82
17,77J 82,59
16,62
1.077,31
Página: 1
RELATÓRIO ANALÍTICO -COMPOSIÇÕES DE CUSTOS 003894 OBRA:
LOCAL:
CUENTE:
CONSTRUÇÃO DE PRAÇA PÚBLICA NA CAPELA DE SANTO EXPEDITO
SITIO FRESCO- FARIAS BRITO- CE
EKS CONSTRUÇ0ES E SERVIÇOS L TOA
4.1. C3025- PISO MORTO CONCRETO FCK=13,5MPa C/PREPARO E LANÇAMENTO (M3) .... '
12391 PEDREIRO SEINFRA
12543 SERVENTE SE INFRA
f
SEINFRA
H
H
C0839 CONCRETO PNIBR., FCK 13.5 MPa COM AGREGADO ADQUIRIDO SEINFRA M3
4.2. C1586- LADRILHOS HIDRÁULICOS C/ARGAMASSA DE CAL 1:4+100KG CIMENTO (M2)
SEINFRA H
02 • . 1 COM OESONERAÇAo
COMPOSIÇOES PRÓPRIAS
87.01%
VALOR BOI TOTAL:
VALOR TOTAL COM BOI:
1,86903328
5,60709983
TOTAL GERAL:
13,46
9,13
TOTAL MAO DE OBRA:
0312016
296,34
1.372,66
1.372,66
""• . 'P .
25,16
51,19
76,35
0,93451664 304,20 284,28
TOTAL SERVICO:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01%):
VALOR COM ENCARGOS:
VALOR BOI (27.
OBRA:
LOCAL:
RELATÓRIO ANALÍTICO - COMPOSIÇÕES DE CUSTOS CONSTRUÇÃO DE PRAÇA PÚBLICA NA CAPELA DE SANTO EXPEDITO
SÍTIO FRESCO· FARIAS BRITO . CE ~.
SEINFRA 024.1 COM DESONERAçAo 87,01%
1-C-U_E_N-TE- :-- t-E-K_S_C_O-NS_T_R_UÇ--:-0-ES-E- SE_R_V-IÇ_O_S_L_TD_ A _______ _ ~ COMPOSIÇÕES PRÓPRIAS
TOTAL GERAL:
4.3. C0365 - BANQUETA/ MEIO FIO DE CONCRETO MOLDADO NO LOCAL (M)
12391
12543
C0588
C2784
C3211
C3268
PEDREIRO
SERVENTE
CAIAÇÃO EM DUAS DEMÃOS COM SUPERCAL
ESCAVAÇÃO MANUAL SOLO DE 1A.CAT. PROF. ATÉ 1.50m
ESCAVAÇÃO E CARGA DE MATERIAL DE JAZIDA
CONCRETO PIVIBR., FCK= 10M Pa COM AGREGADO PRODUZIDO (SfTRANSP.)
SEINFRA
SEINFRA
SEINFRA
SE INFRA
SEINFRA
H
H
M2
M3
M3
M3
0,14035907
o,233931n
13,46
9,13
TOTAL MAO DE OBRA:
o,233931n
0,01 403590
0,03462190
0,03181472
TOTAL MATERIAL:
3,01
24,18
3,70
260,45
TOTAL SERVICO:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01%):
VALOR COM ENCARGOS:
VALOR BOI (27.41%):
VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
VALOR BOI TOTAL:
VALOR TOTAL COM BOI:
TOTAL GERAL:
o31201e
16.181,80
1,89
2,14
4,03
2,81
0,70
0,34
0,13
8,29
9,4e
16,29
12,75
3,54
16,29
4,47 J
20,76
31,44
512,16
140,54
652,69
652,69
4.4. C4624 - PISO PODOTÁTIL EXTERNO EM PMC ESP. 3CM, ASSENTADO COM ARGAMASSA (FORNECIMENTO E ASSENTAMENTO) (M2)
11328
12543
10109
10441
10805
18623
LADRILHIST A
SERVENTE
AREIA MEDIA
CAL HIDRATADA
CIMENTO PORTLAND
PISO TÁTIL ALERTA OU DIRECIONAL EM PMC ESP. 3cm
SEINFRA H
SEINF~
SEINFRA
SEINFRA
SE INFRA
SE INFRA
M3
KG
KG
M2
~ 1,49528949
1,16819492
13,46
9,13
TOTAL MAO DE OBRA:
0,01700892
2,55133769
2,61675661
1,02801153
46,00
0,74
0,50
25,31
TOTAL MATERIAL:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01%):
VALOR COM ENCARGOS:
VALOR BOI (27.41%):
20,13
10,67
30,80
0,78
f 1,89
1,31
26,02
30,00
60,79
46,46
14,33
60,79
16,66
Pégina: 3
RELATÓRIO ANALÍTICO - COMPOSIÇÕES DE CUSTOS 003896 OBRA: CONSTRUÇÃO DE PRAÇA PÚBLICA NA CAPELA DE SANTO
EXPEDITO
LOCAL: SITIO FRESCO· FARIAS BRITO· CE
CLIENTE: EKS CONSTRUÇ0ES E SERVIÇOS L TOA
5.1. PMP 01 - BANCO DE MADEIRA C/ ESTRUTURA DE FERRO (CONFORME PROJETO) (UNO)
10498
11858
10046
10794
10532
11 589
12542
12171
C1 256
C0836
C1 279
C2667
CARPINTEIRO
SERRALHEIRO
AJUDANTE DE SERRALHEIRO
CHUMBADOR TIPO PARABOUL T 318 X 3 1/2'
CHAPA DE AÇO 3116'
PARAFUSO PARA MADEIRA COM CABEÇA REDONDA 5X38
TRAVESSA DE MADEIRA C/SECAO DE 3' X1 1/2'
TUBO AÇO GALVANIZADO DE 50MM (2')
ESCAVAÇÃO MANUAL CAMPO ABERTO EM TERRA ATÉ 2M
CONCRETO NÃO ESTRUTURAL PREPARO MANUAL
ESMALTE DUAS DEMÃOS EM ESQUADRIAS DE FERRO
VERNIZ 3 DEMÃOS EM ESQUADRIAS DE MADEIRA
12391 PEDREIRO
12543 SERVENTE
SEINFRA
SEINFRA
SEINFRA
SE INFRA
SEINFRA
SE INFRA
SEINFRA
SE INFRA
SE INFRA
SEINFRA
SE INFRA
H
H
H
UN
M2
UN
M
M
M3
M3
M2
M2
H
COMPOSIÇ0ES PRÓPRIAS
VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
VALOR BOI TOTAL:
VALOR TOTAL COM BOI:
0,86281403
1,29422105
0,69025123
TOTAL GERAL:
13.46
13,46
10,47
TOTAL MAO DE OBRA:
3,45125613
0,06902512
22,43316484
35,89306375
7,11821577
~ 0,06902512
0,10353768
1,03537684
2 ,44176371
2,42
144,78
0,20
7,88
31 ,00
TOTAL MATERIAL:
26,74
291,13
23,91
14,67
TOTAL SERVICO:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01'4):
VALOR COM ENCARGOS:
VALOR BOI (27.41'4):
VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
TOTAL GERAL:
1.401 81493 9,13
TOTAL MAO DE OBRA:
77,45 J 21,40
1.300,91
356,62
1.667,43
1.667,43
11,61
17 .42
7,23
36,211
8 ,35
9 ,99
4,49
282 ,84
220 ,66
526,33
1,85
30.14
24 ,76
35,82
92,57
666,16
614,12
41,04
666,16
179,68J
834,74
4,00
2.620,64
718,32
3.338,96
3.338,96
12,80
31,61
Página: ~
~~-~,~ RELATÓRIO ANALÍTICO - COMPOSIÇÕES DE CUSTOS _Q_D38 9''
OBRA: CONSTRlJÇAO DE PRAÇA PÚBLICA NA CAPELA DE SANTO
C0839
C1604
10042
12312
EXPEDITO
LOCAL: SÍTIO FRESCO ·FARIAS BRITO • CE
CLIENTE: EKS CONSTRUÇ0ES E SERVIÇOS L TOA
CONCRETO PNIBR., FCK 13.5 MPa COM AGREGADO ADQUIRIDO
LANÇAMENTO E APLICAÇÃO DE CONCRETO SI ELEVAÇÃO
AJUDANTE DE ELETRICISTA
ELETRICISTA
10126 ARRUELA DE FERRO GALVANIZADO 1 1/2"
10285 BUCHA DE FERRO GALVANIZADO 1 1/2"
10338 CABO COBRE NU 25MM2
10355 CABO ISOLADO PVC 750V 1 OMM2
10436 CAIXA TIPO 'J' 50X60X27CM
10551 CHAVE GERAL 3X200A-BASE DE MARMORE
10841 CONECTOR PARA HASTE TERRA
11071 ELETRODUTO DE PVC RIGIDO 112"
11243 HASTE DE ATERRAMENTO COPPERWELD 314" x 3M
11720 POSTE DE CONCRETO 8MX300KG
SE INFRA
SE INFRA
SEINFRA
SE INFRA
SE INFRA
SEINFRA
SEINFRA
SEINFRA
SEINFRA
SEINFRA
SE INFRA
SEINFRA
SEINFRA
,... -~
SEINFRA
M3
M3
H
H
UN
UN
M
M
UN
UN
UN
M
UN
SE,
RELATÓRIO ANALÍTICO - COMPOSIÇÕES DE CUSTOS 003898 .tr.ll: ~' OBRA: CONSTRUÇÃO DE PRAÇA PÚBLICA NA CAPELA DE SANTO DATA : 1910612018 BOI: 27,41% ~~ ::-~ ~- ""' -·'!,;'"' .. EXPEDITO ·~ 1101!'!! -~ -~~ ~~&t~ ··::t- IQIA 1111!' '~fi'· ,~, 6
LOCAL: SITIO FRESCO - FARIAS BRITO - CE SEJNFRA 024.1 COM DESONERAÇAo 87.01% 0312016
CUENTE: EKS CONSTRUÇ0ES E SERVIÇOS L TOA COMPOSIÇÕES PRÓPRIAS
6.2. C3728- CONJUNTO C/04 PÉTALAS E LÂMPADAS VAPOR METÁLICO 400W, MONTADA EM POSTE DE CONCRETO CIRCULAR- H=12M (UN)
10042 AJUDANTE DE ELETRICISTA
12312 ELETRICISTA
12543 SERVENTE
10109 AREIA MEDIA
10199 BASE FUSIVEL DIAZED 25A. COMPLETA
10280 BAITA
10805 CIMENTO PORTLAND
11487 LÂMPADA VAPOR METÁLICO DE 400W/220V
11 778 REATOR AFP P/ LÂMP. V. METÁLICO 400W
16793 LUMINÁRIA TIPO PÉTALA FAB.REEME REF.: ZE-157 OU SIMILAR
16795 POSTE CONCRETO ARMADO CIRCULAR - H= 12M
16796 CABO POLIFÁSICO - 4 X 2,5MM
16799 NÚCLEO P/04 LUMINÁRIAS FAB. REEME REF. :ZE-157 OU SIMILAR
6.3. C1196 - ELETROCUTO PVC ROSC.INCL.CONEXÕES O= 25mm (314" ) (M)
10042
12312
11075
AJUDANTE DE ELETRICISTA
ELETRICISTA
ELETRODUTO DE PVC RIGIDO 3/4"
SEINFRA H
SE INFRA H
SEINFRA H
SE INFRA M3
SEINFRA UN
SEINFRA M3
SEINFRA KG
SE INFRA UN
SE INFRA UN
SEINFRA UN
SEINFRA UN
SEINFRA M
SE INFRA UN
SEINFRA H
SEINFRA M
;;,~ 'irfllléô.rAJ.o:·~
2 ,52008405 10,47
7,24524163 13,46
25,20084044 9,13
TOTAL MAO DE OBRA:
0 ,13191065 46,00
0 ,78752626 21,21
0 ,165931 78 56,00
41 ,73889197 0,50
3,15010505 109.60
3,15010505 120.79
3,15010505 255,90
0,78752626 883,40
8,66278890 5,20
0,78752626 129,92
TOTAL MATERIAL:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01'4):
VALOR COM ENCARGOS:
VALOR BOI (27.41'4):
VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
VALOR BOI TOTAL:
VALOR TOTAL COM BOI:
0.28039907
0,28039907
TOTAL GERAL:
10,47
13,46
TOTAL MAO DE OBRA:
1,02812992 3 .20
TOTAL MATERIAL:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01'4):
VALOR COM ENCARGOS:
VALOR BOI (27.41'4):
VALOR COM BOI:
26.39
97.52
230,08
353,99
j 6,07
16,70
9,29
20,87
345,25
380,50
806,11
695,70
45,05
102 ,32
2427,86
2.781 ,86
2.617,16
164,70
2.781,86
762,61 I 3.644,36
1,00
2.781 ,86
762,61
3.644,36
3.644,36
2.94
3,77
11,71
3,29
3,29
10,00
6,88
3,12
10,00
2,74
12,74\l
Pagina: 6
RELATÓRIO ANALÍTICO - COMPOSIÇÕES DE CUSTOS 0 0 3 8 9 9 CONSTRUÇÃO DE PRAÇA PÚBLICA NA CAPELA DE SANTO
~--------,_~E~XP~E=D~IT~O~------~~~~------------------~t~~~;~~~~~~~~~ LOCAL: SÍTIO FRESCO · FARIAS BRITO· CE SEINFRA 024.1 COM DESONERAÇÃO 87.01% 0312016
OBRA: DATA : 19/0612018 BDI : 2 7.41%
1-C:-U~E:-N-:T-:E-: ---t-:::E-KS:-:-CO_N_S_T_R_UÇ-:-;0-E:-S-E-:S-:E-:RV~I-:ÇO-:-:S~LT::::D:-A-----------------t COMPOSIÇOES PROPRIAS
QUANTIDADE:
VALOR TOTAL:
VALOR BDI TOTAL:
VALOR TOTAL COM BDI:
TOTAL GERAL:
10,00
100,00
27,40
127,40
127,40
6.4. C0537 - CABO ISOLADO PVC 750V 6MM2 (M)
10042
12312
AJUDANTE DE ELETRICISTA
ELETRICISTA
6.5. C1030- CÉLULA FOTOELÉTRICA P/ LÂMPADA, ATÉ 1000W (UN)
12312 ELETRICISTA
10502 CELULA FOTOELETRICA P/LAMPADA 1000W, C/ SUPORTE
SEINFRA
SEINFRA
SE INFRA
H
H
H
H
SEINFA~
0, 12173350
0 ,12173350
10,47
13,46
TOTAL MAO DE OBRA:
TOTAL MATERIAL:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01%):
VALOR COM ENCARGOS:
VALOR BDI (27.41%):
VALOR COM BDI:
QUANTIDADE:
VALOR TOTAL:
VALOR BDI TOTAL:
VALOR TOTAL COM BDI:
0,74776051
0,74776051
TOTAL GERAL:
10,47
13,46
TOTAL MAO DE OBRA:
0,93470064 26,40
TOTAL MATERIAL:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01%):
VALOR COM ENCARGOS:
VALOR BDI (27.41'/o):
VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
VALOR BDI TOTAL:
VALOR TOTAL COM BDI:
TOTAL GERAL:
1,27
1,64
2,91
2,41
6,32
3,97
1,35
6,32
1,46 J 6,78
60,00
319,20
87,60
406,80
406,80
7,83
10,06
17,89
24,68
24,68
42,57
34,25
8,32
42,57
11,67 J 54,24
1,00
42,57
11 ,67
54,24
54,24
Página: 7
~~ RELATÓRIO ANALÍTICO - COMPOSIÇÕES DE CUSTOS 003900
·'~,_..-, ..... OBRA: CONSTRUÇÃO DE PRAÇA PÚBLICA NA CAPELA DE SANTO EXPEDITO LOCAL: SiTIO FRESCO- FARIAS BRITO- CE
CLIENTE: EKS CONSTRUÇÓES E SERVIÇOS L TOA
6.6. C1127 - DISJUNTOR TRIPOLAR EM QUADRO DE DISTRIBUIÇÃO SOA (UN)
10042
12312
11013
AJUDANTE DE ELETRICISTA
ELETRICISTA
DISJUNTOR TAl POLAR 50A
SE INFRA
SE INFRA
SE INFRA
~ SEINFRA
H
H
UN
DATA : 1910612018 BOI: 27,41 %
-ao --.. - •· 024.1 COM OESONERAÇÂO 87,01 % COMPOSIÇ0ES PRÓPRIAS
0,84119100
0,841 19100
10 ,47
13.46
TOTAL MAO OE OBRA:
0 ,93465667 45,60
TOTAL MATERIAL:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01%):
VALOR COM ENCARGOS:
VALOR BOI (27.41%):
VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
VALOR BOI TOTAL:
VALOR TOTAL COM BOI:
TOTAL GERAL:
...
6.7. C0624- CAIXA EM ALVENARIA (40X40X60cm) DE 1 TIJOLO COMUM, LASTRO DE BRITA E TAMPA DE CONCRETO (UN)
10041
101 21
10498
12391
12543
10103
10109
10169
10280
10441
10529
10805
11916
12082
AJUDANTE DE CARPINTEIRO
ARMADOR/FERREIRO
CARPINTEIRO
PEDREIRO
SERVENTE
ARAME RECOZIDO N.18 BWG
AREIA MEDIA
AÇOCA-60
BAITA
CAL HIDRATADA
CHAPA COMPENSADO RESINADO 12MM (1.10 X 2.20M)
CIMENTO PORTLAND
TABUA DE 1" DE 3A. - L = 30cm
TIJOLO MACIÇO COMUM
SEINFRA H 0,56540441 10,47
SEINFRA H 0,10747356 13,46
SE INFRA H 0,56540441 13,46
SEINFRA H 4 ,37651045 13,46
SEINFRA H 7,59511007 9 ,13
TOTAL MAO OE OBRA:
f UMO I ~ ec..c.m . y~~Ê SEINFRA KG
SEINFRA~
SEINFR~ KG SEINFRA M3
SEINFRA KG
SEINFRA M2
SEINFRA KG
SEINFRA M
SEINFRA UN
0,02056016
0,141 86511
1,23080595
0,08224064
14,01829100
0,09345528
28,03658201
0.02803658
214,01257599
9 ,97
46,00
4 ,14
~:: o{l 18,37 s 0 ,50
6,18
0,25
TOTAL MATERIAL:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01%):
VALOR COM ENCARGOS:
..... 03/2016
8,81
11,32
20,13
42,62
42,62
62,75
53,38
9,37
62,75
11.20 , I 79,95 v 1,00
62,75
17,20
79,95
79,95
5,92
1,45
7,61
58,91
69,34
144,36
0,20
6,53
5,1 0
4,61
10,37
1,72
14,02
0,17
53,50
96,22
240,57
173,41
67,16
240,57
Pãgina: B
RELATÓRIO ANAlÍTICO - COMPOSIÇÕES DE CUSTOS OBRA:
LOCAL:
CLIENTE:
CONSTRUÇÃO DE PRAÇA PÚBLICA NA CAPElA OE SANTO EXPEDITO
SiTIO FRESCO - FARIAS BRITO - CE
EKS CONSTRUÇOES E SERVIÇOS L TOA
7.1. C3447- LIMPEZA DE PISO EM ÁREA URBANIZADA (M2)
SEINFRA 024 .1 COM DESONERAÇAO
COMPOSIÇÕES PRÓPRIAS
VALOR Bot (27.41%1:
VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
VALOR Bot TOTAL:
VALOR TOTAL COM BOI:
TOTAL GERAL:
TOTAL MAO DE OBRA:
VALOR:
VALOR SEM ENCARGOS:
VALOR ENCARGOS (87.01%1:
VALOR COM ENCARGOS:
VALOR Bot (27.41%1:
VALOR COM BOI:
QUANTIDADE:
VALOR TOTAL:
VALOR Bot TOTAL:
VALOR TOTAL COM BOI:
TOTAL GERAL:
J
OJ/201&
65,94J 306,61
2,00
481 ,14
131,88
613,02
613,02
0,64
0 ,64
0,34
0 ,30
0,64
0,18 J 0,82
171,00
109,44
30,78
140,22
'"·"~
COMPOSIÇÃO DO BOI 003902 OBRA: CONSTRUÇÃO DE PRAÇAS PÚBLICAS
LOCAL: DIVERSAS LOCALIDADES DO MUNICÍPIO DE FARIAS BRITO - CE
CUENTE: EKS CONSTRUÇ0ES E SERVIÇOS L TOA
COD DESCRIÇÃO %
Benefício
I S+G Garantia/seguros 0,80 I L Lucro 5,00
TOTAL 5,80
Despesas Indiretas
AC Administraçao central 3,00
DF Despesas financeiras 0,59
R Riscos 0,97
TOTAL 4,56
I Impostos
PIS 0,65
COFINS 3,00
ISS 5,00
CPRB (4,5%, APENAS QUANDO TIVER DESONERAÇÃO INSS) 4,50
TOTAL 13,15
BOI= 27,41%
(1 +AC+S+R+G)*(1+DF)*(1 +L)/(1-1)-1
TABELA DE ENCARGOS SOCIAIS OBRA: CONSTRUÇÃO DE PRAÇAS PÚBLICAS
LOCAL: DIVERSAS LOCALIDADES DO MUNICÍPIO DE FARIAS BRITO- CE
CLIENTE: EKS CONSTRUÇ0ES E SERVIÇOS L TOA
co o DESCRIÇÃO HORA •;.
A GRUPO A
A1 INSS 0,00
A2 SESI 1,50
A3 SE NAI 1,00
A4 INCRA 0,20
AS SEBRAE 0,60
A6 Salário Educaçao 2,50
A7 Seguro Contra Acidentes de Trabalho 3,00
A8 FGTS 8,00
A9 SECONCI 0,00
TOTAL 16,80
B GRUPOS
81 Repouso Semanal Remunerado 17,87
82 Feriados 3,72
83 Auxilio - Enfermidade 0,91
84 1JO Salário 10,92
85 Licença PaternidadE 0,08
86 Faltas Justificadas 0,73
87 Dias de Chuvas 1,65
88 Auxilio Acidente de Trabalho 0,12
89 Férias Gozadas 10,42
810 Salário Maternidade 0,03
TOTAL 46,45
c GRUPO C C1 Aviso Prévio Indenizado 6,35
C2 Aviso Prévio Trabalhado 0,15
C3 Férias Indenizadas 3,56
C4 Depósito Rescisao Sem Justa Causa 4.84
C5 lndenizaçao Adicional 0,53
TOTAL 15,43
A{;dif o GRUPO D "7'
D1 Reincidência de Grupo A sobre Grupo B 7,80
D2 Reincidência de Grupo A sobre Aviso Prévio Trabalhado e Reincidência 0,53 do FGTS sobre Aviso Prévio Indenizado
TOTAL 8,33
Horista = 87,01%
A+B+C+D
Página 1 de 95
JMC CONCEITO r.__ SERVIÇO E EMPREENDIMENTOS EIRELLE-ME 0 0 3 9 0 ~
PROPOSTA COMERCIAL
FARIAS BRITO/CE , 19 DE JUNHO DE 2018
A Comissão Permanente de Licitação Farias Brito/Ceará
REF.: TOMADA DE PREÇOS N° 2018. OS .29 .1 li' OBJETO: CONTRATAÇÃO DE PESSOA JURÍDICA PARA EXECUTAR OS SERVIÇOS DE ENGENHARIA DAS OBRAS DE CONSTRUÇÃO DE PRAÇAS PÚBLICAS NO MUNICÍPIO DE FARIAS BRITO/CE
Prezados Senhores ,
Apresentamos a V . Sas. nossa proposta para execução dos serviços objeto do Edital de T~ DE PREÇOS N° 2018.05 . 29.1 pelo valor qlobal de R$ 748.813,43V(Setecentoa e quarenta e oito mil, oitocentos e treze reais e quarenta e três centavos) com prazo d~ execução de 180 (cento e oitenta) dias .
Informamos que\ o 60 (sessenta) dias~n
prazo de validade da nossa p roposta é de r.ont.é!r dé! dé!t.é! dP. é!h7 d" licit."ç~o .
Finalizando , declaramos que assumimos inteira responsabilidade pela execução dos serviços objeto deste edital e que serão executados conforme exigência editálica e contratual e que serão i niciados dentro do prazo de até 1 O (dez) dias consecutivos , contados a partir da data de recebimento d a Ordem de Serviço .
(
Páqina 2 de 9
RESUMO DO ORÇAMENTO DATA.
19/06f201S
_.,._ JM~o~~!~!O OBRA: CONSTRUÇAO DE PRAÇAS PUBLICAS EM DIVERSAS LOCALIDADES NO MUNICIPIO DE
FARIAS BRITO/C E
MODAUDADE: TOMADA DE PREÇOS N° 2018.05.29.1 003905 OBSERVAÇAO: BOI: 24.35% E FONTE: SEINFRAICE 024.1 DESONERADA
CÓDIGO DESCRIÇAO PREÇO TOTAL
VILA LAMAJÚ 93.244,02
2 CAPELA NOSSA SENHORA APARECIDA - siTIO CAATINGUEIRA 45.192,19
3 CAPELA NOSSA SENHORA DO CARMO -DISTRITO BARREIRO DO JORGE 133.251,78
" CAPELA NOSSA DE SAÚDE- SiTIO QUEIMADAS 70.057,26
5 CAPELA DE sAo VICENTE DE PAULA- SiTIO sAO VICENTE 96.425,07
6 CAPELA DE SANTA TEREZINHA -VILA LAMAJÚ 31 .721,38
7 CAPELA DO DIVINO PAI ETERNO - SiTIO SOUSA 42.180,43
& CAPELA NOSSA SENHORA DO EXPEDITO SOCORRO -SiTIO SUTURNO 23.397,60
CAPELA DE SANTO EXPEDITO - SITIO CAJUEIRO 38.121,12
10 CAPELA DE SANTO EXPEDITO -SITIO FRESCO 30.591,26
11 Beneficios • Despesas lndlrebls (BOI) 1..a.631,3"
VALOR ORÇAMENTO: 602.182,09
VALOR BOI TOTAL: 1 .. 11.831,3"
VALOR TOTAL: 7..a.a13,4J
Quarenta e Oito Mil Oitocentos e Treze reais e Quarenta e Três centavos
..) ! ç Jdl~~-((! f,lves de Morais
PROCUF
Página 3 de 95
PLANILHA ORÇAMENTÁRIA DATA:
19/061201S
_.1._ J~~o~?~~!~!O OBRA: CONSTRUÇAO DE PRAÇAS PUBLICAS EM DIVERSAS LOCALIDADtS NO MUNICIPIO DE FARIAS BRITO/CE MODALIDADE: TOMADA DE PREÇOS N" 2018.05.29.1 003906 OBSERVAÇAO: BOI: 24,35% E FONTE: SEINFRAICE 024.1 DESONERADA
ITEM CÓDIGO DEICRIÇAO FONTE UNID QUANT1DADE PREÇO PREÇO
UNITÁRIO R$ TOTAL R$
1 VILA LAMAJÚ t3.244,02
1.1 ADMINISTRAÇÃO DA OBRA 3.215,88
1.1.1 COMPADM ADMINISTRAÇÃO DA OBRA PROPRIA M~S 6,00 535,98 3.215,88
1.2 SERVIÇOS PRELIMINARES 4.221,36
1.2.1 C4541 PLACA PADRÃO DE OBRA, TIPO BANNER SE INFRA M2 12,00 231 ,43 2.777,16
1.2 .2 C2102 RASPAGEM E LIMPEZA DO TERRENO SE INFRA M2 633,42 2,28 1.444,20
1.3 MOVIMENTO DE TERRA 3.481,87
1.3.1 C2860 LASTRO DE AREIA ADQUIRIDA (COXIM DE AREIA) SEINFRA M3 50,20 69,36 3.481,87
1.4 PAVIMENTAÇÃO 59.204,70
1.4.1 C3025 PISO MORTO CONCRETO FCK=13,5MPa CIPREPARO E SEINFRA M3 30,12 385,89 11 .623,01 LANÇAMENTO
1.4.2 C1586 LADRILHOS HIORAULICOS C/ARGAMASSA DE CAL 1:4+100KG
SEINFRA M2 502,04 81 ,76 41 .046,79 CIMENTO
n C3449 MEIO FIO PRE MOLDADO (0,07x0,30x1 ,OO)m SE INFRA M 97,18 17,37 1.688,02 CIREJUNTAMENTO 1.4.4 C0365 BANQUETA/ MEIO FIO DE CONCRETO MOLDADO NO LOCAL SE INFRA M 72,00 17,41 1.253,52
1.4.5 C4624 PISO PODOTATIL EXTERNO EM PMC ESP. 3CM, ASSENTADO SE INFRA M2 55,24 65,05 3593,36 COM ARGAMASSA (FORNECIMENTO E ASSENTAMENTO)
1.5 PAISAGISMO E URBANIZAÇÃO 5.812,58
1.5.1 PMP- 01 BANCO DE MADEIRA COM ESTRUTURA DE FERRO
PROPRIA UN 5,00 701,04 3.505,20 I (CONFORME PROJETO) 1.5.2 C3451 LIXEIRA EM FIBRA DE VIDRO CAP.=40L e DIAM.=35an SE INFRA UN 4,00 266,46 1.065,84
1.5.3 C1430 GRAMA EM PLACAS E=6 CM FORNECIMENTO E PLANTIO SE INFRA M2 102,10 12,16 1.241,54
1.11 INSTALAÇÓES ELÉTRICAS 18.176,10
1.6.1 C2090 QUADRO P/ MEDIÇÃO EM POSTE DE CONCRETO SE INFRA UN 1,00 1.127,61 1.127,61 v CONJUNTO C/04 PETALAS E LAMPADAS VAPOR METALICO 1.6.2 C3728 25CNV, MONTADA EM POSTE DE CONCRETO CIRCULAR- SE INFRA UN 4,00 2.976,70 11 .906,80 H= 12M
1.6.3 C1197 ELETRODUTO PVC ROSC.INCL.CONEXOES O= 32mm (1") SE INFRA M 50,00 15,45 772,50
1.6.4 C0537 CABO ISOLADO PVC 750V 6MM2 SE INFRA M 270,00 5,68 1.533,60 I
Í)
1.6.5 C1030 CÉLULA FOTOELÉTRICA P/ LÂMPADA, ATÉ 100
Páqi na 4 de 95
PLANILHA ORÇAMENTÁRIA DATA :
19/0612018
_j1l_ J~~o~~!~!Q OBRA: CONSTRUÇAO OE PRAÇAS PUBLICAS EM DIVERSAS LOCALIDADES NO MUNICIPIO DE
FARIAS BRITO/CE
MODAUDADE: TOMADA DE PREÇOS N" 2018.05.29.1
OBSERVAÇAO: BOI: 24,35% E FONTE: SEINFRAICE 024.1 DESONERADA
ITEM cóDIGo oeecAIÇlo
2.5.1 PMP -01 BANCO DE MADEIRA COM ESTRUTURA DE FERRO /CONFORME PROJETO_l_
2.5.2 C3451 LIXEIRA EM FIBRA DE VIDRO CAP.=40L e OIAM.=35cm
2.8 INSTALAÇÕES ELÉTRICAS
2.6.1 C2090 QUADRO P/ MEDIÇÃO EM POSTE DE CONCRETO
CONJUNTO C/04 PETALAS E tAMPADAS VAPOR MET ALICO 2.6.2 C3728 25fJI'J, MONTADA EM POSTE DE CONCRETO CIRCULAR-
H= 12M
2.6.3 C1196 ELETROCUTO PVC ROSC.INCL.CONEXÕES D= 25mm (3/4")
2.6.4 C0537 CABO ISOLADO PVC 750V 6MM2
2.6.5 C1030 CÉLULA FOTOELÉTRICA P/ LÂMPADA, ATÉ 1000W
2.6 .6 C11 27 DISJUNTOR TRIPOLAR EM QUADRO DE DISTRIBUIÇÃO SOA/ 2.6.7 C0624
CAIXA EM ALVENARIA (40X40X60cm) DE 1 TIJOLO COMUM, LASTRO DE BRITA E TAMPA DE CONCRETO
~ DIVERSOS
C3447 LIMPEZA DE PISO EM ÁREA URBANIZADA
3 CAPELA NOSSA SENHORA DO CARMO -DISTRITO BARREIRO DO JORGE
3.1 ADMINISTRAÇAO DA OBRA
3.1.1 COMPADM ADMINISTRAÇÃO DA OBRA
3.2 SERVIÇOS PRELIMINARES
3.2.1 C2102 RASPAGEM E LIMPEZA DO TERRENO
3.3 MOVIMENTO DE TERRA
3.3.1 C0330 ATERRO C/COMPACTAÇAO MANUAL S/CONTROLE, MAT. C/AQUISICÃO
3.3.2 C0930 CORTE MANUAL EM TERRA
3.3.3 C2860 LASTRO DE AREIA ADQUIRIDA (COXIM DE AREIA)
3.4 MURO DE ARRIMO DE PEDRA
3.4.1 C2784 ESCAVAÇÃO MANUAL SOLO DE 1ACAT. PROF. ATÉ 1.50m
3.4.2 C3345 ALVENARIA DE PEDRA ARGAMASSADA (TRAÇO 1:3) C/AGREGADOS ADQUIRIDOS
3.4.3 C0773 CHAPIM PRÉ-MOLDADO DE CONCRETO
~ C3409
REBOCO C/ ARGAMASSA DE CIMENTO E AREIA S/ PENEIRAR, TRACO 1:4
C1614 LATEX DUAS DEMÃOS EM PAREDES EXTERNAS SIMASSA
3.5 PAVIMENTAÇAO
3.5.1 C3025 PISO MORTO CONCRETO FCK=13,5MPa C/PREPARO E LANCAMENTO
3.5.2 C1586 LADRILHOS HIDRAULICOS C/ARGAMASSA DE CAL 1 :4+100KG CIMENTO
3.5.3 C3449 MEIO FIO PRE MOLDADO (0,07x0,30x1 ,00)m C/REJUNTAMENTO
3.5.4 C0365 BANQUETA/ MEIO FIO DE CONCRETO MOLDADO NO LOCAL
3.5.5 C4601 PISO CIMENTADO COM ARGAMASSA DE CIMENTO E AREIA S/ PENEIRAR ESP. 2 O em
3.5.6 C4624 PISO PODOTATIL EXTERNO EM PMC ESP. 3CM, ASSENTADO COM ARGAMASSA !FORNECIMENTO E ASSENTAMENTO)
3.6 PAISAGISMO E URBANIZAÇAO
3.6 .1 PMP- 01 BANCO DE MADEIRA COM ESTRUTURA DE FERRO I {CONFORME PROJETO) 3.6.2 C3506 GUARDA CORPO C/ CORRIMAO EM TUBO DE AÇO
GALVANIZADO 2"
3.6.3 C3451 LIXEIRA EM FIBRA DE VIDRO CAP.=40L e DIAM.=35cm
3.7 INSTALAÇÕES ELÉTRICAS
3.7.1 C2090 QUADRO P/ MEDIÇÃO EM POSTE DE CONCRETO
JMC CONCEITO SERVIÇO E EMPREENDIMENTOS EIRELI - ME CNPJ: 08.863.83110001-Q7 CGC: 06.213.254-7 Rua Manoel Pinheiro de Almeida, 213, Centro, Farias Brim/C E - CEP: 63.185-000 Conta1Ds:(88) 3544-166519.9796-3816/9.81 ~000 - conceibconslrucao.118rv@hotmail.com
FONTE UNID QUANnDADE
PROPRIA UN 8,00
SE INFRA UN 2,00
SE INFRA UN 1,00
SE INFRA UN 2,00
SEINFRA M 16,00
SE INFRA M 108,00
SE INFRA UN 2,00
SE INFRA UN 1,00
SE INFRA UN 3,00
SEINFRA M2 234,92
PROPRIA MI':S 6,00
SE INFRA M2 668,92
SEINFRA M3 308,07
SEINFRA M3 1,77
SE INFRA M3 59,56
SE INFRA M3 9,08
SEINFRA M3 19,99
SE INFRA M2 18,93
SEINFRA M2 ........ / 27,28 SE INFRA M~ ip( 27,28
.?Jf,j
SEINFRA M3 37,75
SEINFRA M2 595,57
SE INFRA M 32,80
SEINFRA M 52,07
SE INFRA M2 I 33,56 SEINFRA M2 I 41 ,88
l1 PROPRIA UN ~ l,tJ 11 ,00 SE INFRA M 38,63
SEINFRA UN 4,00
SE INFRA UN 1,00
_{) () "'' () f'\ '"'
VVvuUf
PREÇO UNITARIO R$
PREÇO TOTAL R$
701,04 5.608,32
266,46 532,92
8.798,12
1.127,61 1.127,61
2.976,70 5.953,40
10,70 171 ,20
5,68 613,44
45,55 91 ,10
67,14 67,14
257,41 772,23
159,75
0,68 159,75
133.251,78
4.813,18
768,86 4.613,16
1.525,14
2,28 1.525,14
24.548,05
/ 66,11 20.366,51 27,38 48,46
69,36 4.1 31 ,08
8.549,79
24,18 -~ J 219,55 300,44 ~ 6.005,80 71 ,20
v 1.347,82
21 ,80 594,70
14,00 381 ,92
88.425,90
385,89 14.567,35
81,76 48.693,80
17,37 569,74
17,41 906,54
28,73 964,18
65,05 2.724,29
14.836,45
701 ,04 7.71 1,44
159,44 6.159,17
266,46 1.065,84
9.184,.48
1.127,61 1.127,61
' J
:
Pag~na 5 d 95 e
PLANILHA ORÇAMENTÁRIA DATA:
19106/201€
_.1._ JM~o~~~~~!O OBRA: CONSTRUÇAO DE PRAÇAS PUBLICAS EM DIVERSAS LOCALIDADES NO MUN!CIPIO DE FARIAS BRITOICE MODALIDADE: TOMADA DE PREÇOS N° 2018.05.29.1 003908 OBSERVAÇAO: BOI: 24,35% E FONTE: SEINFRAICE 024.1 DESONERADA
ITEM CÓDIGO DE8CRIÇAO FONTE UNID PREÇO
QUANTIDADE UNITÁRIO RI PREÇO
TOTAL RI
3.7 .2 C3728
3.7.3 C1196
3.7 .4 C0537
3.7 .5 C1030
CONJUNTO C/04 PETALAS E LAMPADAS VAPOR METALICO '2!SC"NV, MONTADA EM POSTE DE CONCRETO CIRCULAR · H= 12M
ELETRODUTO PVC ROSC.INCL.CONEXOES O= 25mm (3/4")
CABO ISOLADO PVC 7f:IJV 6MM2
CÉLULA FOTOELÉTRICA P/ LÂMPADA. ATÉ 1000W
SEINFRA
SE INFRA
SE INFRA
SEINFRA
3.7.6 C1127 DISJUNTOR TRIPOLAR EM QUADRO DE DISTRIBUIÇÃO 50A/ SEINFRA 3.7.7
3.1
3.8 .1
3.8.2
C0624
DIVERSOS
C1279
C3447
CAIXA EM ALVENARIA (40X40X60an) DE 1 TIJOLO COMUM, LASTRO DE BRITA E TAMPA DE CONCRETO
ESMALTE DUAS DEMÃOS EM ESQUADRIAS DE FERRO
LiMPEZA DE PISO EM ÁREA URBANIZADA
CAPELA NOSSA DE SA0DE - SITIO QUEIMADAS
4J.. ADMINISTRAÇAO DA OBRA
l.....J COMP ADM ADMINISTRAÇÃO DA OBRA 4.2
4.2.1
4.3
4.3.1
4.4
4.4.1
4.4.2
4.4.3
4.4.4
4.5
4.5.1
4.5.2
SERVIÇOS PRELIMINARES
C2102 RASPAGEM E LIMPEZA DO TERRENO
MOVIMENTO DE TERRA
C2860 LASTRO DE AREIA ADQUIRIDA (COXIM DE AREIA)
MURO DE CONTENÇAO DE ALVENARIA
C2784 ESCAVAÇÃO MANUAL SOLO DE 1A.CAT. PROF. ATÉ 1.50m
C0074
C3409
ALVENARIA DE TIJOLO CERAMICO FURADO (9x19x19)cm C/ARGAMASSA MISTA DE CAL HIDRATADA ESP=20 em REBOCO C/ ARGAMASSA DE CIMENTO E AREIA SI PENEIRAR, TRAÇO 1:4
C1614 LATEX DUAS DEMÃOS EM PAREDES EXTERNAS SIMASSA
PAVIMENTAÇAO
C3025
C1586
PISO MORTO CONCRETO FCK=13,5MPa C/PREPARO E LA~AMENTO
LADRILHOS HIDRAULICOS CIARGAMASSA DE CAL 1:4+100KG CIMENTO
SE INFRA
SE INFRA
SEINFRA
PROPRIA
SE INFRA
SEINFRA
SE INFRA
SEINFRA
SEINFRA
SE INFRA
SE INFRA
SEINFRA
UN 2,00 2.976,70 5.953,40
M 30,00 10,70 321,00
M 150,00 5,68 852,00
UN 2.00 45,55 91.10
UN 1,00 67,14 67,1 4
UN 3,00 257,41 n2.23
M2 42,49 23,91 1.015,94
M2 008,92 0,68 454,87
70.057,26
2.397,o48
M~S 6,00 399,58 2.397 ,48
759,24
M2 333,00 2,28 759,24
2.032,25
M3 29,30 69,36 2.032,25
4.710,51
M3 8,01 24,18 193,68
M2 57,85 66,30 3.835,46
M2 20,99 21,80 457,58
M2 20,99 14,00 293,86
:s / 33.215,24 M3 17,58 385,89 ~ 6.783,95
M2 292,95 81 ,76 v 23.951 ,59
4.5.3 C0365 BANQUETA/ MEIO FIO DE CONCRETO MOLDADO NO LOCAL SEINFRA M 49,94 17,41 869,46
4· w--+----4~ __ 4 __ ~C~O~M~A~R~GAM~~A~S~S~A~IIFO~R~N~E~C~IM~EN~T~O~E~A~S~SE~N~T~A~M~E~N~T~O~)--~_SE_I_N_FR_A~L---M~2~~~~~----25_,_83_L _______ ~ __ .os-+ ______ 1._680 __ ,2_4~ n C PISO PODOTATIL EXTERNO EM PMC ESP. 3CM, ASSENTADO ~ A ;sxv· 4.b PAISAGISMO E URBANIZAÇ O .. r"f 11.153,09
4.6 .1
4.6.2
4.6.3
4.7
4.7.1
4.7.2
4.7.3
4.7.4
4.7 .5
4.7 .6
4.7.7
4.8
4.8.1
PMP • 01
C3f:IJ6
C3451
BANCO DE MADEIRA COM ESTRUTURA DE FERRO I (CONFORME PROJETO) GUARDA CORPO C/ CORRIMAO EM TUBO DE AÇO GALVANIZADO 2"
LIXEIRA EM FIBRA DE VIDRO CAP.=40L e DIAM.=35cm
INSTALAÇ0ES ELÉTRICAS
C2090
C3728
C1 196
C0537
C1030
C1127
C0624
DIVERSOS
C1279
QUADRO P/ MEDIÇÃO EM POSTE DE CONCRETO
CONJUNTO CJ04 PETALAS E LAMPADAS VAPOR METALICO '2!SC"NV, MONTADA EM POSTE DE CONCRETO CIRCULAR -H= 12M
ELETRODUTO PVC ROSC.INCL.CONEX0ES D= 25mm (3/4")
CABO ISOLADO PVC 750V 6MM2
CÉLULA FOTOELÉTRICA P/ LÂMPADA, ATÉ 1000W
DISJUNTOR TRIPOLAR EM QUADRO DE DISTRIBUIÇÃO soy CAIXA EM ALVENARIA (40X40X60an) DE 1 TIJOLO COMUM, LASTRO DE BRITA E TAMPA DE CONCRETO
ESMALTE DUAS DEMÃOS EM ESQUADRIAS DE FERRO
JMC CONCEITO SERVIÇO E EMPREENDIMENTOS EIRELI - ME CNPJ: 08.863.83110001-07 CGC: 06.213.254-7 Rua Manoel Pinheiro de Almeida, 213, Cen1ro, Farias Brito/C E - CEP: 63.185-000 Contatos:(BB) 3544-166519.9796-381619.8150-QOOO • conceitoconstrucao.serv@hotmall.com
PROPRIA UN 5,00 701 ,04 3.505,20
SEINFRA M 94,59 159,44 15.081,43
SEINFRA UN 1,00 268,46 268,46
5.235,10
SEINFRA UN 1,00 1.127,61 1.127,61
SEINFRA 1,00 2.976,70 2.976,70
SE INFRA 12,00 10,70 128,40
SE INFRA M I I) 66,00 5,68 374,86 SEINFRA UN 1,00 45,55 45,55
SE INFRA UN 1,00 67,14 67,14
SE INFRA UN 2,00 257,41 514,82
2.714,28
SEINFRA M2 104,05 23,91 2.487,84
Pag~na 6 d 95 e
PLANILHA ORÇAMENTÁRIA DATA:
19/061201f
... 1._ J~~o~9~~~~!0 OBRA: CONSTRUÇAO DE PRAÇAS PUBLICAS EM DIVERSAS LOCALIDADES NO MUNICIPIO Ot FARIAS BRITO/C E MODAUDADE: TOMADA DE PREÇOS N" 2018.05.29.1 UUJjU~ OBSERVAÇAO: BOI: 24,35% E FONTE: SEINFRAICE 024.1 DESONERADA
ITEM COOIGO DEICAIÇAO FONTE UNID QUANnDADE PREÇO PREÇO
UNfTÁRIORS TOTAL R$
4.8.2 C3447 LIMPEZA DE PISO EM ÁREA URBANIZADA SEINFRA M2 333,00 0,68 226,44
5 CAPELA DE SAO VICENTE DE PAULA - SITIO SAO VICENTE 86.425,07
5.1 ADMINISTRAÇAO DA OBRA 3.330,12
5.1.1 COMPADM ADMINISTRAÇÃO DA OBRA PROPRIA M~S 6,00 555,02 3.330,12
5.2 SERVIÇOS PRELIMINARES 1.200,08
5.2.1 C2102 RASPAGEM E LIMPEZA DO TERRENO SEINFRA M2 526,35 2,28 1.200,08
5.3 MOVIMENTO DE TERRA 6.405,25
5.3.1 C0331 ATERRO C/COMPACTAÇÃO MECÃNICA E CONTROLE, MAT. SE INFRA M3 72,10 18,11 1.305,73 PRODUZIDO (SfTRANSP.}
5.3.2 C0928 CORTE E ATERRO COMPENSADOS/CONTROLE DO GRAU DE
SE INFRA M3 239,35 7,17 1.716,14 COMPACTAÇÃO
5.3 .3 C2860 LASTRO DE AREIA ADQUIRIDA (COXIM DE AREIA) SE INFRA M3 48,78 69,36 3.383,38
5.4 MURO DE ARRIMO DE PEDRA 10.224,77
-O C2784 ESCAVAÇÃO MANUAL SOLO DE 1A.CAT. PROF. ATÉ 1.50m SEINFRA M3 9,31 24,18 225,12 ALVENARIA DE PEDRA ARGAMASSADA (TRAÇO 1 :3) SE INFRA M3 24,24 300,44 7.282.67 5.4.2 C3345 C/AGREGADOS ADQUIRIDOS
5.4 3 C0773 CHAPIM PRÉ-MOLDADO DE CONCRETO SE INFRA M2 19,39 71 ,20 1.380,57
5.4.4 C3409 REBOCO C/ ARGAMASSA DE CIMENTO E AREIA SI PENEIRAR,
SEINFRA M2 37,33 21,80 813,79 TRACO 1:4
5.4.5 C161 4 LATEX DUAS DEMÃOS EM PAREDES EXTERNAS S/MASSA SE INFRA M2 37,33 14,00 522,62
5.5 PAVIMENTAÇAO 54.456,38
5.5.1 C3025 PISO MORTO CONCRETO FCK=13,5MPa C/PREPARO E
SE INFRA M3 29,27 385,89 11.295,00 LANCAMENTO
5.5.2 C1586 LADRILHOS HIDRAULICOS C/ARGAMASSA DE CAL 1 :4+100KG
SEINFRA M2 487,82 81,76 39.884,16 CIMENTO
5.5.3 C3449 MEIO FIO PRE MOLDADO (0,07x0,30x1 ,00)m SE INFRA M 21,60 17,37 375,19 CIREJUNTAMENTO
5.5.4 C0365 BANQUETA/ MEIO FIO DE CONCRETO MOLDADO NO LOCAL SE INFRA M 58,52 17,41 (7 1.018,83 5.5.5 C4624
PISO PODOTATIL EXTERNO EM PMC ESP. 3CM, ASSENTADO SE INFRA M2 28,95 65,05 ~ 1.883,20 COM ARGAMASSAiFORNECIMENTO E ASSENTAMENTO)
5.6 PAISAGISMO E URBANIZAÇAO \... 13.645,48
5.6.1 PMP - 01 BANCO DE MADEIRA COM ESTRUTURA DE FERRO I (CONFORME PROJETO) PROPRIA UN 6,00 701,04 4.206,24
5.6.2 C3506 GUARDA CORPO C/ CORRIMÃO EM TUBO DE AÇO
SEINFRA M __t _ys.as 159,44 8.906,32 GALVANIZADO 2" 5.~ C3451 LIXEIRA EM FIBRA DE VIDRO CAP.=40L e DIAM.=35an SE INFRA UNS'( 'd'V 2,00 266,46 532,92 si J INSTA LAÇOES ELÉTRICAS , 5.335,80 5.7.1 C2000 QUADRO P/ MEDIÇÃO EM POSTE DE CONCRETO SE INFRA UN 1,00 1.127,61 1.127,61
CONJUNTO C/04 PETALAS E LAMPADAS VAPOR METALICO 5.7.2 C3728 25(NII, MONTADA EM POSTE DE CONCRETO CIRCULAR - SEINFRA UN 1,00 2.976,70 2.976,70
H= 12M
5.7.3 C1196 ELETROCUTO PVC ROSC.INCL.CONEXÕES O= 25mm (3/4") SEINFRA M 15.63 10,70 167.24
5.7.4 C0537 CABO ISOLADO PVC 750V 6MM2 SEINFRA M / 6.89 5,68 436.74
5.7.5 C1030 CÉLULA FOTOELÉTRICA P/ LÂMPADA. ATÉ 1000W SEINFRA UN l 1,00 45.55 45,55 5.7.6 C1127 DISJUNTOR TRIPOLAR EM QUADRO DE DISTRIBUIÇÃO SOA/ SEINFRA UN fo.tM 1,00 67,14 67,14 5.7.7 C0624 CAIXA EM ALVENARIA (40X40X60an) DE 1 TIJOLO COMUM, SE INFRA UN V\ 2,00 257,41 514,82 LASTRO DE BRITA E TAMPA DE CONCRETO 5.8 DIVERSOS 1.627,19
5.8 .1 C1279 ESMALTE DUAS DEMÃOS EM ESQUADRIAS DE FERRO SE INFRA M2 61,45 23,91 1.469,27
5.8.2 C3447 LIMPEZA DE PISO EM ÁREA URBANIZAOA SE INFRA M2 526,35 0,68 357,92
6 CAPELA DE SANTA TEREZINHA - VILA LAMAJÚ 31 .721,38
6.1 ADMINISTRAÇAO DA OBRA 1.067,96
6.1.1 COMPADM ADMINISTRAÇÃO DA OBRA PROPRIA M~S 6,00 181,33 1.087,98
6.2 SERVIÇOS PRELIMINARES 397,59
_a h-Pigina: 4
JMC CONCEITO SERVIÇO E EMPREENDIMENTOS EIRELI - ME -·· CNPJ: 08.863.83110001.07 CGC: 06.213.254-7 Rua Manoel Pinheiro de Almeida, 213, Centro, Farias Brito/CE- CEP: 83.185.
aq~na e p' ' 7 d 95
PLANILHA ORÇAMENTÁRIA DATA:
191061201S
... 1._ J~~o~~!~!Q OBRA: CONSTRUÇAO DE PRAÇAS PUBLICAS EM DIVERSAS LOCALIDADES NO MUNICIPIO Dt FARIAS BRITO/CE MODALIDADE: TOMADA DE PREÇOS N° 2018.05.29.1 OBSERVAÇAO: BOI: 24,35% E FONTE: SEINFRAICE 024.1 DESONERADA
ITEM CÓOIOO OEICRIÇlO
6.2.1 C2102 RASPAGEM E LIMPEZA DO TERRENO
8.3 MOVIMENTO DE TERRA
6.3.1 C2860 LASTRO DE AREIA ADQUIRIDA (COXIM DE AREIA)
8.4 PAVIMENTAÇAO
6.4.1 C3025 PISO MORTO CONCRETO FCK=13,5MPa CIPREPARO E LANCAMENTO
6.4.2 C1586 LADRILHOS HIDRAULICOS C/ARGAMASSA DE CAL 1:4+100KG CIMENTO
6.4.3 C0365 BANQUETA/ MEIO FIO DE CONCRETO MOLDADO NO LOCAL
6.4.4 C4624 PISO PODOTATIL EXTERNO EM PMC ESP. 3CM, ASSENTADO COM ARGAMASSA {FORNECIMENTO E ASSENTAMENTO)
8.5 PAISAGISMO E URBANIZAÇAO
6.5.1 PMP - 01 BANCO DE MADEIRA COM ESTRUTURA DE FERRO (CONFORME PROJETO)
6.5.2 C3451 LIXEIRA EM FIBRA DE VIDRO CAP.=40L e DIAM.=35cm
lO INSTALAÇÕES ELÉTRICAS 6.6 .1 C2090 QUADRO P/ MEDIÇÃO EM POSTE DE CONCRETO
6.6 .2 C3728 CONJUNTO C/04 PETALAS E LAMPADAS VAPOR METALICO 25CMI, MONTADA EM POSTE DE CONCRETO CIRCULAR-H=12M
6.6.3 C1 196 ELETROCUTO PVC ROSC.INCL.CONEXOES D= 25mm (3/4")
6.6 .4 C0537 CABO ISOLADO PVC 750V 6MM2
6.6 .5 C1030 CÉLULA FOTOELÉTRICA P/ LÂMPADA, ATÉ 1000VIJ
6.6 .6 C1127 DISJUNTOR TRIPOLAR EM QUADRO DE DISTRIBUIÇÃO SOA/
6.6.7 C0624 CAIXA EM ALVENARIA (40X40X60an) DE 1 TIJOLO COMUM; LASTRO DE BRITA E TAMPA DE CONCRETO
8.7 DIVERSOS
6.7.1 C3447 LIMPEZA DE PISO EM ÁREA URBANIZADA
7 CAPELA DO DIVINO PAI ETERNO - SíTIO SOUSA
7.1 ADMINISTRAÇAO DA OBRA
7.1.1 COMPADM ADMINISTRAÇÃO DA OBRA
7.2 SERVIÇOS PRELIMINARES
~ C2102 RASPAGEM E LIMPEZA DO TERRENO
MOVIMENTO DE TERRA
7.3.1 C2860 LASTRO DE AREIA ADQUIRIDA (COXIM DE AREIA)
7.4 PAVIMENTAÇAO
7.4.1 C3025 PISO MORTO CONCRETO FCK=13,5MPa CIPREPARO E LANCAMENTO
7.4.2 C1586 LADRILHOS HIDRAULICOS C/ARGAMASSA DE CAL 1 :4+100KG CIMENTO
7.4.3 C0365 BANQUETA/ MEIO FIO DE CONCRETO MOLDADO NO LOCAL
7.4.4 C4624 PISO PODOTATIL EXTERNO EM PMC ESP. 3CM, ASSENTADO COM ARGAMASSA {FORNECIMENTO E ASSENTAMENTO)
7.5 PAISAGISMO E URBANIZAÇAO
7.5.1 PMP - 01 BANCO DE MADEIRA COM ESTRUTURA DE FERRO I (CONFORME PROJETO) 7.5.2 C3451 LIXEIRA EM FIBRA DE VIDRO CAP.=40L e DIAM.=35cm
7.8 INSTALAÇÕES ELÉTRICAS
7.6.1 C2090 QUADRO P/ MEDIÇÃO EM POSTE DE CONCRETO
CONJUNTO C/04 PETALAS E LAMPADAS VAPOR METALICO 7.6.2 C3728 250VIJ, MONTADA EM POSTE DE CONCRETO CIRCULAR-
H= 12M
7.6.3 C1196 ELETROCUTO PVC ROSC.INCL.CONEXOES D= 25mm (314")
JMC CONCEITO SERVIÇO E EMPREENDIMENTOS EIRELI - ME CNPJ: 08.863.83110001 -Q7 CGC: 06.213.254-7 Rua Manoel Pinheiro de Almeida, 213, Centro, Farias Brm/CE - CEP: 63.185-000 Contatos:(88) 3544-166519.9796-381619.8150.0000 - conoei1Dconstrucao .serv@hotma~Wm""'""
FONTE UNIO QUANnDADE
SEINFRA M2 174,38
SEINFRA M3 17,02
SE INFRA M3 10,21
SEINFRA M2 170,24
SE INFRA M 41 ,50
SEINFRA M2 16,21
PROPRIA UN 5,00
SE INFRA UN 2,00
SE INFRA UN 1,00
SE INFRA UN 1,00
SE INFRA M 13,00
SE INFRA M 69,00
SE INFRA UN 1,00
SE INFRA UN 1,00
SEINFRA UN 2,00
SEINFRA M2 174,38
PROPRIA Ml;S 6,00
~ SE INFRA M:Pfl' 244,10
SEINFRA M3 23,80
SEINFRA M3 14,28
SE INFRA M