Item SERVIÇOS Valor do item
DEZ/15 JAN/16 FEV/16 MAR/16 ABR/16 MAI/16 JUN/16 JUL/16 AGO/16 SET/16 OUT/16 NOV/16 (R$)
50% 50%
12.955,88 12.955,88
100%
627,40
50% 50%
2.922,53 2.922,53
75% 25%
7.046,25 2.348,75
100%
8.244,99
100%
20.168,23
80% 20%
59.688,48 14.922,12
100%
69.034,49
80% 20%
35.571,93 8.892,98
100%
1.368,03
100%
3.566,45
70% 30%
21.678,62 9.290,84
Simples 0,00 0,00 0,00 0,00 12.955,88 72.644,36 40.150,66 12.213,36 35.459,46 7.283,22 104.606,42 8.892,98
Acumulado 0,00 0,00 0,00 0,00 12.955,88 85.600,25 125.750,91 137.964,27 173.423,73 180.706,96 285.313,38 294.206,36 294.206,36
Simples 0,00% 0,00% 0,00% 0,00% 4,40% 24,69% 13,65% 4,15% 12,05% 2,48% 35,56% 3,02% 100,00%
Acumulado 0,00% 0,00% 0,00% 0,00% 4,40% 29,10% 42,74% 46,89% 58,95% 61,42% 96,98% 100,00%
Valor da obra: R$- 294.206,36
OBRA: CONSTRUÇÃO DE UM SISTEMA DE ABASTECIMENTO DE ÁGUA COM CAPACIDADE PARA 25.000 LITROS Contrato: FUNASA / PREFEITURA
Prazo de execução: 240 dias contados a partir da publicação no DOU Localização das obras: VILA JANUA COELI
Tempo de execução (meses)
01 INSTALAÇÃO PROVISÓRIA E SERVIÇOS PRELIMINARES 25.911,76
02CONSTRUÇÃO DE ESTRUTURA EM CONCRETO - MOVIMENTO
DE TERRA627,40
03 FUNDAÇÃO 5.845,06
04 ESTRUTURA (CONCRETO) 9.395,00
05 CASA DE OPERAÇÃO 8.244,99
06 BARRILETE DE RECALQUE E RESERVAÇÃO 20.168,23
07 CAPTAÇÃO 74.610,60
08 REDE DE DISTRIBUIÇÃO 69.034,49
09 LIGAÇÕES DOMICILIARES 44.464,91
12 INSTALAÇÕES ELÉTRICAS ( fornecimento e instalação ) 30.969,45
10 PISOS 1.368,03
11 CERCADO / ESCADA DE ACESSO 3.566,45
Desembolso
Percentual
Estado do ParáPrefeitura Municipal de Cametá
CRONOGRAMA FÍSICO - FINANCEIRO
2018-08-08T12:23:29-0300MARCIO VIEIRA GONCALVES:62854160282