Page 1: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

São Paulo, Brasil

13 Setembro 2012

Engenharia de Sistemas

Fabio Tadeu Alves

Integrando Sistemas:

O caso de projetos de Sistema Metroferroviário

Page 2: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

2009 - 2012 – MBA em Excelência Gerencial do Metro, Fundação

Instituto de Administração – FIA, FEA/USP.

2007 - 2008 – Mestre em Railway System Engineering and

Integration, University of Birmingham (UoB), UK.

1994 - 1999 – Engenheiro Eletricista, Faculdade Engenharia

Industrial (FEI), SBC.

1994 - 1999 – Técnico em Eletrotécnica, Escola Técnica Federal de

São Paulo (ETFSP).

Page 3: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

Planejamento . . . Não desta forma . . .

Page 4: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

… mas desta forma,

muito melhor!!!

Fonte: Harris e Godward (1992)

Page 5: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

Adesão representa . . .

Page 6: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

Sistema Ferroviário é um conjunto integrado de pessoas, ativos fixos e móveis que

estão organizados de certa maneira para transportar pessoas e produtos de um

ponto A até um ponto B de forma segura, confiável, temporal, e

energeticamente eficiente.

Permitam-me descrever algumas definições...

Gerenciar um Sistema Ferroviário com sucesso, significa controlar todas as

interfaces entre subsistemas de uma maneira efetiva enquanto garante que

fatores humanos estão sendo apropriadamente considerados e que as

necessidades do meio ambiente estão sendo respeitadas a todo o momento.

Page 7: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

Sistema de Transporte sobre Trilhos possui alta complexidade e

deve ser composto pelo estado da arte com os seguintes

componentes:

Infra-estrutura

Estações

Material Rodante

Operação

Sistemas de Sinalização e Controle

Marketing

Manutenção

Financeiro

Gerenciamento

Aspectos Legais

Page 8: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

Contexto do Sistema sobre Trilhos

8

Sistema sobre

Trilhos

Informação

Economia Nacional

Regional & Local

Lucro

Regras & Regulação

Informação

Emergências & Disrupção Staffs

Otimização do

Trem

Falhas & Atrasos

Energia

Equipto &

Serviços

Tarifas

Emergências &

Disrupção

Regulação Investidores Tarifas

Cargas &

Passageiros

Clima

Disrupção

Atrasos Segurança Conforto

Informação

Transporte

Qualidade Viagem

Viagem

Retorno Investimento

Fornecedores

Sistemas

Transporte

Incidentes

Externos Governo

Stockholders

Carga

Turistas

Usuários

Meio

Ambiente Staffs Equipamento

Sistema de Controle

Page 9: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil 9

Operação

do TremCondução

Parada

do Trem

Fechamento

de Portas

Operação em

Caso de

Incidente

Exemplos

Manual

(GoA – 1)Condutor Condutor Condutor Condutor

Bruxelas

Barcelona

Hamburgo

STO -

Semi –

Automática

(GoA – 2)

Automático Automático Condutor Condutor

Metrô SP L1,2,3

Hong Kong

Singapura

DTO

Driverless

(GoA – 3)

Automático Automático Agente no Trem Agente no Trem

Docklands

Osaka

Ankara

UTO

Unattended

(GoA – 4)

Automático Automático Automático Automático

Metrô SP - L4

Metrô Paris - L14

Toulouse

People Movers

Page 10: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

Railway Control System

Station & Line

Control System

10

The Railway System

Train

Control

System

Train Operation

System

Signalling System

Service Control System

Revenue Collection

Fire Detection,

Suppression & Ventilation

Control

Lifts, Escalators,

Pumps, Lights,

Power, etc Crowd Control

Telecoms, Radio, Data Transmission

Network Planning

Network Control

System

CCTV, Information

Display Public Address,

Voice Communication, Asset Monitoring & Management

Staff Utilisation

Train

Optimisation

Passenger

Flow

Optimisation Source: Class notes UoB, 2008, Dr. Woodland

Page 11: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

CONFIANÇA

CONFIABILIDADE SEGURANÇA PROTEÇÃODISPONIBILIDADE

Capacidade de o

sistema disponibilizar

serviços quando

necessário

Capacidade de o

sistema disponibilizar

serviços conforme

necessário

Capacidade de o

sistema operar sem

falhas catastróficas

Capacidade de o

sistema se proteger

contra invasão

acidental ou deliberada

Page 12: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

System Engineering

Page 13: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

Por quê é importante controlar melhor um Sistema?

Requisitos incompletos - 13,1%

Não envolve os usuários - 12,4%

Recursos insuficientes/cronograma - 10,6%

Expectativas irrealistas - 9,9%

Falta de apoio da gestão - 9,3%

Alteração de Requisitos - de 8,7%

Falha de planejamento - 8,1%

Não mais necessário - 7,4%

Fonte: www.standishgroup.com

Falhas em Projetos

Page 14: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

História do System Engineering

Produtos

1950

1960

Projetos

2000

Software

1970

1980

Page 15: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil Fonte: Adaptado a partir de Steve McConnell, Code Complete) e INCOSE

Page 16: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil 16

Page 17: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

Interfaces Simples - Complexa

17

Page 18: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

Diversos Subsistemas e Interfaces

18

CIS:Sistema de Informação ao Usuário / VCS: Sistema de Controle do Trem

Sis

tem

a d

e M

an

ute

nçã

o

Eixos & Rodeiros Comunicação

& Sistema

Sinalização

Eletrificação & Subestação

Sistemas Estação

Dormentes & Via

Tração &

Sistema

Frenagem

Sistemas Subestrutura

Con

trole

Sis

tem

as

Ge

ren

cia

men

to O

pe

racio

na

l Estrutura

Trem

Rail Rail

VCS

CIS ATP

Truque

Terc

eiro

s

Fonte: Notas de Aulas University of Birmingam Schmid (2008)

Page 19: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

Conectividades

Conectividade:

• Através de funções do projeto;

• Cenários existentes;

• Interoperabilidade;

Fonte: Keith Robinson

Page 20: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

Sistema de Transporte de Passageiros

20

Page 21: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil 21

Page 22: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

Customer

Requirements

(Mission)

Option

Development

System

Requirement

Functional

Decomposition

Physical

Decomposition

Design &

Development

Operational

& Disposal

Validate

Requirements

Test of

System

Integration

Process

Test of

Subsystems

Verification

Process

Manufacture

& Build Processo de Gerenciamento de Projeto

Utilização de Ferramentas de ‘System Engineering’

Gerenciamento do Projeto:

System Engineering Vee-Process

Page 23: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

PM

SE

System Engineering x Gerenciamento de Projetos

Vitech CORE ® Gerenciamento de todo ciclo de vida

Page 24: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

Introduction TEMP on the ‘Vee’ Cycle

24

Statement of

Need

Operational

Use

System

Requirements

Subsystem

Requirements

Component

Requirements

System

Test

Subsystem

Test

Component

Test

Stakeholder

Requirements

Acceptance

Test

Qualifying

Verifying

Validating

Page 25: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

LuL – East London Lin Poject (ELLP)

25

Page 26: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

SYSTEM ENGINEERING PROCESS FLOW

System Analysis

and Control

(Balance)

Process

Input

Process

Output

Requirements

Loop

Design

Loop

System Level

Tradeoffs

Equipment

Level

Tradeoffs Modeling

Simulation

Testing

Verification

Reference: MIL-HDBK-502, Acquisition Logistics

The Analysis Loop and the Synthesis (Design) Loop are

Key Elements of the System Engineering Process.

Requirements

Analysis

Functional Analysis/

Allocation

Synthesis

Page 27: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

SYSTEM PERFORMANCE SPECIFICATION

SYSTEM ENGINEERING

MANAGEMENT PLAN

REQUIREMENTS TRACEABILTY

MATRIX

SYSTEM DESIGN DESCRIPTION

SYSTEM INTERFACE

SPECIFICATION

INTERFACE DESIGN

DESCRIPTION INTEGRATED

MASTER PLAN

REQUIREMENTS VERIFICATION

MATRIX

DETAIL (HW) SPECIFICATIONS

SOFTWARE DOCUMENTS

SYSTEM INTEGRATION DOCUMENTS

SYSTEM VERIFICATION DOCUMENTS

SYSTEM TEST DOCUMENTS

SYSTEM SUPPORT DOCUMENTS

INTEGRATED MASTER

SCHEDULE

SYSTEM DOCUMENTATION TREE

CONTRACT DATA REQUIREMENTS

LIST

CONTRACT PERFORMANCE

WORK STATEMENT

SYSTEM REQUIREMENTS

DOCUMENT

Page 28: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

The objective of this presentation is to review the purpose and scope of SE documents prepared on a program.

SE documents that will be discussed include the following:

– System Documentation Tree

– System Engineering Management Plan (SEMP)

– Integrated Master Plan (IMP)

– Integrated Master Schedule (IMS)

– System Performance Specification (PS)

– System Design Description (SDD)

– System Interface Specification (IS)

– Interface Design Description (IDD)

– Requirements Traceability Matrix (RTM)

– Requirements Verification Matrix (RVM)

– Detail Specifications (DS)

– Software Documents

– System Integration Documents

– System Verification Documents

– System Test Documents

– System Support Documents

Page 29: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil 29

Page 30: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil 30

Desafios para a aplicação de um Sistema de Engenharia

Metroferroviario

Page 31: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

Desafios para a aplicação de um Sistema de Engenharia

Metroferroviario

31

Whole life, whole systems approach

•Rail systems engineering people

and competencies

•Integrating client and supply side

systems engineering

•Innovation and technology

management

•Programme systems integration

•Whole system reliability

•Systems engineering services,

infrastructure and rolling stock

•Systems engineering the rail

industry

Page 32: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil 32

Desafios para a aplicação de um Sistema de Engenharia

Metroferroviario

Page 33: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil 33

•Deep competence for some –basic skill for

all

•Skills and knowledge can be trained

•How do we get people with the right

attributes

–Seeing issues from multiple perspectives

–… and at multiple levels

–Rapport building

–Knowing when to continuing to analyse –

and when to stop

•Where do we get them

–From rail or other sectors

–In house or consultants

Desafios para a aplicação de um Sistema de Engenharia

Metroferroviario

Page 34: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

Master Plan for the Korean CBTC

System Development Project

2008. 4. 9

Young-Hoon Lee

Byoung-Gil Lee, Jae-Chon Lee, Yong-Kyu Kim

Korea Railroad Research Institute

Ajou University

SysCon 2008 – IEEE International Systems Conference

Montreal, Canada, April 7-10, 2008

Page 35: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

Introduction Traditional Railroad Signaling

Safe distance between trains

– Train position, speed, the direction, etc.

35

Block sections to control the train speed safely

Position of moving train is continuously relayed

Page 36: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

Examples of CBTC System ERTMS/ETCS Level 2

http://www.etcs.eu/en/funktionsprinzip/etcs_level_2.htm

36

Page 37: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

Introduction

What is a TEMP? Test & Evaluation Master Plan

Requirements for test & evaluation,

Procedures for accomplishing testing,

Resources required, associated planning information etc.

Why TEMP? High degree of confidence: performing as intended

Evaluation & validation of the whole system to ensure that the requirements have been met

Starting usually in the concept design phase

37

Page 38: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

Introduction TEMP on the ‘Vee’ Cycle

38

Statement of

Need

Operational

Use

System

Requirements

Subsystem

Requirements

Component

Requirements

System

Test

Subsystem

Test

Component

Test

Stakeholder

Requirements

Acceptance

Test

Qualifying

Verifying

Validating

Page 39: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

Process for Generating TEMP Generating TEMP

Verification of the system to be integrated & built

Test & evaluation for the system validation

We have:

Design specifications for 5 subsystems

– ATS, ATP, ATO, RCN, EIE Existing signaling systems

We need:

System-level requirements

39

Page 40: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

Process for Preparing TEMP

Proposed Process

Integration of design specifications to system-level specification

Partitioning specification into logical part and physical part

Analysis of logical part

Testability check

Documentation to TEMP

40 Documentation

of TEMP

Subsystems

design specifications

Existing system

operation concept

Integration of

design specifications

System scope

Logical part Physical part

System-level

requirements

Verification &

testability check

Allocation

Requirements

analysis

Page 41: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

System-Level Specification Integration of 5 subsystems design specifications

Consideration of system scope for system level

Logical part & physical part

41

Railroad

Vehicle

system

Track

system

Control

system

ATS

Power

system

ATP ATO EIE RCN

Page 42: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

System-Level Specification Logical Part

Functional requirements of the system mostly

Analysis based on signaling expert’s knowledge with operation concept of

existing system

– System functions

– Logical operation activities

Logical operation scenario for the system mission

– Reflection to system-level requirements

Test items from the testability check

42

Page 43: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

Logical Operation Scenario Logical Operation Activities

Setting for the system mission

43

Ref.

con.1

Train readyto run

con.2

Trainoperation on

auto

con.3

Trainwarehousing

Ref.

Wayside

Operator

On-boardRef. AND

con.1

Preconditioning

con.2

LaunchingTrain data

con.3

Movement towaiting line

con.4

Acknowledgmentstart

con.5

Pre departuretest

con.6

Acknowledgement Data

con.7

Movement tostartingstation

con.8

Trainschedulemanagement

AND LP OR

AND

con.9

Acknowledgmentof status

con.10

Precisionstop atstation

con.11

Doors opening

con.12

Doors Closing

con.13

Movement nextstation

con.14

Door control

con.15

Operationstrategydecision

AND

LE

OR LP AND

con.16

Acknowledgmentend

con.17

Movement towaiting line.

con.18

Movement toshed

con.19

Train databack-up

con.20

Movement toendstation

con.21

System test

con.22

Arrangementtrain

speration

con.23

Depotmanagement

con.24

Train databackup

AND Ref.

TrainstatusTrainstatus

TrainstatusTrainstatusTrainstatusTrainstatusTrainstatus

Trainstatus

Traindata.

Trainstatus

Traindata.Traindata.No error

Waiting

Databackup

Dwelltime

MovingAuthori...

Traindata

Drivingpattern

Mode=YardSystembooting

Mode

Trainready

Doorclosed

End ofoperation

EnterShed

Trainstop

1 2 3

Ref.

con.1

Train readyto run

con.2

Trainoperation on

auto

con.3

Trainwarehousing

Ref.

Wayside

Operator

On-boardRef. AND

con.1

Preconditioning

con.2

LaunchingTrain data

con.3

Movement towaiting line

con.4

Acknowledgmentstart

con.5

Pre departuretest

con.6

Acknowledgement Data

con.7

Movement tostartingstation

con.8

Trainschedulemanagement

AND LP OR

AND

con.9

Acknowledgmentof status

con.10

Precisionstop atstation

con.11

Doors opening

con.12

Doors Closing

con.13

Movement nextstation

con.14

Door control

con.15

Operationstrategydecision

AND

LE

OR LP AND

con.16

Acknowledgmentend

con.17

Movement towaiting line.

con.18

Movement toshed

con.19

Train databack-up

con.20

Movement toendstation

con.21

System test

con.22

Arrangementtrain

speration

con.23

Depotmanagement

con.24

Train databackup

AND Ref.

TrainstatusTrainstatus

TrainstatusTrainstatusTrainstatusTrainstatusTrainstatus

Trainstatus

Traindata.

Trainstatus

Traindata.Traindata.No error

Waiting

Databackup

Dwelltime

MovingAuthori...

Traindata

Drivingpattern

Mode=YardSystembooting

Mode

Trainready

Doorclosed

End ofoperation

EnterShed

Trainstop

1 2 3

Page 44: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

System-Level Requirements

Physical part of system-level specification

Physical elements of the system

Allocation of requirements to physical elements

Traceability with relationships

Verification requirements for test items

System-level requirements

Base material in generating the TEMP

– What the integrated system has to be met

– Principal technical elements & risk

Technical performance measures for the test items

44

Page 45: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

System Architecture Logical & physical views of the integrated system

Traceability with the relationships between views Links between requirements and subsystems

Verification requirements

45

Page 46: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

Documentation of TEMP

Generation of TEMP Document

Using products of the activities of the process

Considering system architecture, project plan, etc.

Script language supported by tool

Recommended format (DAU)

1) System Introduction

2) Integration Test Program Summary

3) Developmental Test and Evaluation Outline

4) Operational Test and Evaluation Outline

5) Test and Evaluation Resource Summary

6) Annexes 46

Page 47: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

Implementation with CORE® Schema with the relationships between classes

47

Satisfies Satisfied by

Defines Defined by

Assign Assigned to

Uses configuration Configuration for

Verification

Requirement

Verification

Event

Responsible

Organization

Test

Configuration

Test

Procedure

Verifies Traced from

Traces to Verified by System

Requirement

Function

System/

Component

Allocated to Performs

Page 48: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

Implementation with CORE® Traceability with the relationships

48

built from built from built from built from built from

CBTC System

System

ATO

System

ATP

System

ATS

System

EIE

System

RCN

System

Page 49: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

Implementation with CORE® Example of system functions

Logical operation scenario :PS

49

Page 50: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

Lições Aprendidas em Aplicação em Sistemas Metroferroviario

Utilizar as atividades abaixo:

Develop a Pilot Project or Prototype

Requirements Management

System Integration

System Staging

Schedule (Track Access)

Testing

System Operating Requirements

Evolution of Technology

Coordination with other Capital Programs

Procurement Approach

Consultants

SYSTEM ENGINEERING MUST BE TRULY TOP DOWN

50

Page 51: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

... e finalmente, a maneira de tratar as coisas caso não de

certo . . .

Page 52: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

Muito Obrigado !

52

Page 53: Integrando Sistemas - AEAMESP · 2016-04-27 · Display Public Address, Voice Communication, Asset Monitoring & Management Staff Utilisation Train ... infrastructure and rolling stock

MSc. Fabio Tadeu Alves – 18a. AEAMESP – Sao Paulo/Brasil

Fabio Tadeu Alves

[email protected]

+55 11 98232 3516

53