Mine Project 2012/2013 Pretende-se: 1. Definição do nível adequado de produção 2. Método de desmonte (detalhado) 3. Desenvolvimento e traçagem do jazigo 4. Preparação do jazigo 5. Operações de furação, carga e transporte 6. Diagramas de fogo rampas ou galerias de rolagem e câmaras de desmonte. Project must contain: 1. Adequate level of production (ton/year; m3/year; lifetime years) 2. Mining method 3. Primary and secondary underground development openings 4. Tertiary underground development openings 5. Drilling, loading and hauling operations description and calculations 6. Drilling patterns of a drift and a stope. Data (surveys distance 500 x 500 metres square mesh): Avg. altitude 810 m Ore deposit A Survey S ab Footwall depth (m) Thickness (m) Avg. grade (%) S00 S01 S02 S03 S04 S05 S06 S10 S11 S12 356 1 6.2 S13 346 1.5 6.1 S14 319 1 6.8 S15 S16 S20 S21 355 1.5 6.3 S22 353 1.2 6.6 S23 351 1.5 7.2 S24 343 2 7.1 S25 341 1.5 7.8

Mine Project

Embed Size (px)

DESCRIPTION

Mine Project

Citation preview

Page 1: Mine Project

Mine Project

2012/2013

Pretende-se:

1. Definição do nível adequado de produção 2. Método de desmonte (detalhado) 3. Desenvolvimento e traçagem do jazigo 4. Preparação do jazigo 5. Operações de furação, carga e transporte 6. Diagramas de fogo rampas ou galerias de rolagem e câmaras de desmonte.

Project must contain:

1. Adequate level of production (ton/year; m3/year; lifetime years) 2. Mining method 3. Primary and secondary underground development openings 4. Tertiary underground development openings 5. Drilling, loading and hauling operations description and calculations 6. Drilling patterns of a drift and a stope.

Data (surveys distance 500 x 500 metres – square mesh):

Avg. altitude 810 m

Ore deposit A

Survey Sab Footwall depth (m)

Thickness (m)

Avg. grade (%)

S00

S01

S02

S03

S04

S05

S06

S10

S11

S12 356 1 6.2

S13 346 1.5 6.1

S14 319 1 6.8

S15

S16

S20

S21 355 1.5 6.3

S22 353 1.2 6.6

S23 351 1.5 7.2

S24 343 2 7.1

S25 341 1.5 7.8

Page 2: Mine Project

S26

S30

S31 368 2 8.0

S32 373 2.1 8.4

S33 374 2.2 8.2

S34 382 2.3 7.8

S35 388 0.8 8.0

S36

S40

S41 390 1 6.5

S42 394 2.2 7.4

S43 403 2.3 8.2

S44 403 2.2 7.5

S45 416 1.8 6.1

S46

S50

S51

S52 413 1.2 7.2

S53 414 1.5 6.5

S54 420 1 6.1

S55

S56

Page 3: Mine Project
Page 4: Mine Project

Table 1 – Mechanical properties obtained in laboratory

Page 5: Mine Project

Table 2 – Values of the mechanical properties used in simulation for stability analysis of

Moinho Mine, Aljustrel, Portugal.

Page 6: Mine Project

Fig 4.1 – Variation of recovery with pillar and stopes dimensions (Moinho Mine)

Page 7: Mine Project

Fig 4.2 – Variation of safety factor with pillar (pilares) and stopes (camaras) dimensions