76
PREFEITURA MUNICIPAL DE BAGÉ ESTADO DO RIO GRANDE DO SUL CONVITE nº 008/2008 PROJETOS: GEOMÉTRICO, TERRAPLENAGEM, PAVIMENTAÇÃO, DRENAGEM E SINALIZAÇÃO DE VIAS - RUA AKSAKOF DE VILHENA – Est. 0 a Est. 10+13,259 - RUA WALTER DIAS DA COSTA – Est. 0 a Est. 22+14,927 - RUA ORVANDIL ALVES LUCAS – Est. 0 a Est. 37+16,780 - RUA 11 DE JUNHO – Est. 0 a Est. 5+16,128 TRECHO ENTRE A AVENIDA ESPANHA E A AVENIDA GENERAL OSÓRIO BAIRROS SÃO JORGE E CENTRO BAGÉ – RS VOLUME 2 - PLANILHAS DE CÁLCULO DOS PROJETOS Porto Alegre, Março de 2008 Rua Delfina Fusquini Siriani, 65 – CEP 91750-280 – Jardim Vila Nova – Porto Alegre – RS C.G.C. 88.705.447/0001-07 – Fones/Fax: (051) 3248-5833 e 3246-9238 E-mail: [email protected]

PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

  • Upload
    phamque

  • View
    215

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

PREFEITURA MUNICIPAL DE BAGÉ

ESTADO DO RIO GRANDE DO SULCONVITE nº 008/2008

PROJETOS: GEOMÉTRICO, TERRAPLENAGEM, PAVIMENTAÇÃO,

DRENAGEM E SINALIZAÇÃO DE VIAS

- RUA AKSAKOF DE VILHENA– Est. 0 a Est. 10+13,259

- RUA WALTER DIAS DA COSTA– Est. 0 a Est. 22+14,927

- RUA ORVANDIL ALVES LUCAS– Est. 0 a Est. 37+16,780

- RUA 11 DE JUNHO– Est. 0 a Est. 5+16,128

TRECHO ENTRE A AVENIDA ESPANHA E A AVENIDA GENERAL OSÓRIO

BAIRROS SÃO JORGE E CENTRO

BAGÉ – RS

VOLUME 2 - PLANILHAS DE CÁLCULO DOS PROJETOS

Porto Alegre, Março de 2008

Rua Delfina Fusquini Siriani, 65 – CEP 91750-280 – Jardim Vila Nova – Porto Alegre – RSC.G.C. 88.705.447/0001-07 – Fones/Fax: (051) 3248-5833 e 3246-9238

E-mail: [email protected]

Page 2: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

1.ÍNDICE1. ÍNDICE........................................................................................................................ 01

2. APRESENTAÇÃO....................................................................................................... 02

ANEXOS

Page 3: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

2. APRESENTAÇÃO Este documento é decorrente do contrato firmado entre o Município de Bagé através da Prefeitura

Municipal de Bagé/SMAU, e a empresa Aerogeo Aerofotogrametria, Geoprocessamento e Engenharia

Ltda., para elaboração de Projetos Geométricos, de Pavimentação, de Drenagem e de Sinalização

Horizontal e Vertical da Avenida Leonel de Moura Brizola; das ruas 11 de Junho, Orvandil Alves Lucas,

Walter Dias da Costa e Aksakof de Vilhena; das ruas Clélia Gomes Araújo, Gedeão Ratto e Travessa 45 e;

das ruas Caetano Gonçalves e Vereador Pinto Machado, referente ao convite nº 008/2008.

Este relatório, Volume 2 de 4 apresenta as planilhas de cálculo e detalhes decorrentes dos projeto acima

citados das ruas 11 de Junho, Orvandil Alves Lucas, Walter Dias da Costa e Aksakof de Vilhena, trecho entre o entroncamento com a Avenida Espanha e a Rua Aksakof de Vilhena e, o entroncamento com

a rua 11 de Junho e a Avenida General Osório, Bairro São Jorge e Bairro Centro - cidade de Bagé-RS. A

extensão total do projeto é de aproximadamente 1,6km.

Porto Alegre, Março de 2008.

_________________________Engº. Civil Milton Dupont

CREA 29.463 / RS

Page 4: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

SUMARIO

1 – PROJETO HORIZONTAL

- LISTAGEM DO ESTAQUEAMENTO

- LISTAGEM DAS CURVAS HORIZONTAIS

2 – PROJETO VERTICAL

- LISTAGEM DO GREIDE DE PROJETO

- LISTAGEM DAS CURVAS VERTICAIS

3 - SONDAGENS

4 - PLANILHA DE CÁLCULO DO ISP

5– NOTAS DE SERVIÇO

6 – SEÇÕES TIPO

7 – QUANTITATIVOS

SINALIZAÇÃO

GEOMÉTRICO

DRENAGEM

8 - PLANILHA DE DIMENSIONAMENTO HIDRÁULICO

Page 5: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

1 – PROJETO HORIZONTAL

• LISTAGEM DO ESTAQUEAMENTO• LISTAGEM DAS CURVAS HORIZONTAIS

Page 6: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

Aerogeo Ltda.Traçado Horizontal: Eixo-Rua Aksakof

Data: 21/07/08 Hora: 15:14 Página: 1Projeto: Rua Walter da Costa Local: Bagé

Sistema topoGRAPH 98 © 1998 - 1999 char *Pointer Informática

Estaca Descrição Progressiva Norte Este Cota Azimute

0 0 0,000 532.940,3982 774.297,9852 240,275 319°38'56"

0+9,500 PCV1 9,500 532.946,5492 774.305,2251 239,880 319°38'56"

0+14,500 PTV1 14,500 532.949,7865 774.309,0356 239,812 319°38'56"

0+17,000 17,000 532.951,4052 774.310,9408 239,778 319°38'56"

0+19,500 19,500 532.953,0238 774.312,8460 239,744 319°38'56"

1 20,000 532.953,3476 774.313,2271 239,737 319°38'56"

2 40,000 532.966,2969 774.328,4689 239,572 319°38'56"

3 60,000 532.979,2463 774.343,7108 239,413 319°38'56"

4 80,000 532.992,1957 774.358,9526 239,266 319°38'56"

4+1,700 81,700 532.995,2388 774.362,5344 239,249 319°38'56"

5 100,000 533.005,1450 774.374,1945 239,056 319°38'56"

5+10,430 PCV2 110,430 533.011,8981 774.382,1431 319°38'56"

6 120,000 533.018,0944 774.389,4363 239,023 319°38'56"

7 140,000 533.031,0438 774.404,6782 238,972 319°38'56"

7+2,700 142,700 533.032,7919 774.406,7358 238,968 319°38'56"

8 160,000 533.043,9931 774.419,9200 239,138 319°38'56"

8+0,430 PTV2 160,430 533.044,2715 774.420,2477 319°38'56"

8+1,985 EIXO WALTER DA COSTA161,985 533.045,2781 774.421,4324 239,212 319°38'56"

8+5,000 PCV3 165,000 533.047,2305 774.423,7305 319°38'56"

9 180,000 533.056,9425 774.435,1618 239,291 319°38'56"

9+5,222 185,222 533.060,3236 774.439,1415 239,193 319°38'56"

9+15,000 PTV3 195,000 533.066,6545 774.446,5932 319°38'56"

10 V 200,000 533.069,8919 774.450,4037 238,746 319°38'56"

10+13,259 213,259 533.078,4766 774.460,5083 238,501 319°38'56"

Page 7: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

Aerogeo Ltda.Traçado Horizontal: eixo-rua walter d. da costa

Data: 21/07/08 Hora: 15:15 Página: 1Projeto: Rua Walter da Costa Local: Bagé

Sistema topoGRAPH 98 © 1998 - 1999 char *Pointer Informática

Estaca Descrição Progressiva Norte Este Cota Azimute

0 0 0,000 533.045,2781 774.421,4324 239,212 353°13'38"

0+5,000 PCV1 5,000 533.045,8677 774.426,3975 353°13'38"

0+10,000 PTV1 10,000 533.046,4574 774.431,3626 239,319 353°13'38"

0+16,564 16,564 533.047,2314 774.437,8804 239,389 353°13'38"

0+17,566 17,566 533.047,3496 774.438,8755 239,419 353°13'38"

1 20,000 533.047,6367 774.441,2929 239,450 353°13'38"

1+5,180 25,180 533.048,2476 774.446,4367 239,510 353°13'38"

1+15,072 PCV2 35,072 533.049,4142 774.456,2597 353°13'38"

1+17,566 37,566 533.049,7082 774.458,7359 239,260 353°13'38"

2 40,000 533.049,9953 774.461,1533 239,158 353°13'38"

2+17,566 57,566 533.052,0668 774.478,5963 238,422 353°13'38"

3 60,000 533.052,3539 774.481,0137 238,273 353°13'38"

3+5,072 PTV2 65,072 533.052,9521 774.486,0503 353°13'38"

3+17,566 77,566 533.054,4255 774.498,4568 237,200 353°13'38"

4 80,000 533.054,7126 774.500,8742 237,050 353°13'38"

4+13,060 PT1 93,060 533.056,2527 774.513,8430 236,244 353°27'08"

4+15,832 PCV3 95,832 533.056,5580 774.516,5982 353°40'38"

4+17,566 97,566 533.056,7489 774.518,3212 235,970 353°40'38"

5 100,000 533.057,0170 774.520,7408 235,856 353°40'38"

5+17,566 117,566 533.058,9515 774.538,1996 235,030 353°40'38"

6 120,000 533.059,2196 774.540,6192 234,976 353°40'38"

6+15,832 PTV3 135,832 533.060,9631 774.556,3549 353°40'38"

6+17,566 137,566 533.061,1541 774.558,0787 234,583 353°40'38"

7 140,000 533.061,4222 774.560,4975 234,566 353°40'38"

7+12,564 152,564 533.062,8058 774.572,9847 234,480 353°40'38"

7+17,567 157,567 533.063,3567 774.577,9574 234,454 353°40'38"

8 160,000 533.063,6247 774.580,3759 234,427 353°40'38"

8+17,657 177,657 533.065,5693 774.597,9255 234,308 353°40'38"

9 180,000 533.065,8273 774.600,2542 234,292 353°40'38"

9+17,567 197,567 533.067,7620 774.617,7148 234,095 353°40'38"

10 200,000 533.068,0299 774.620,1326 234,080 353°40'38"

10+17,568 217,568 533.069,9646 774.637,5934 233,944 353°40'38"

11 220,000 533.070,2324 774.640,0109 233,956 353°40'38"

11+17,565 237,565 533.072,1668 774.657,4687 234,025 353°40'38"

12 240,000 533.072,4350 774.659,8892 234,025 353°40'38"

12+2,564 242,564 533.072,7173 774.662,4373 234,017 353°40'38"

12+2,657 PCV4 242,657 533.072,7276 774.662,5301 353°40'38"

12+17,565 257,565 533.074,3694 774.677,3471 233,676 353°40'38"

13 260,000 533.074,6375 774.679,7676 233,556 353°40'38"

13+2,657 PTV4 262,657 533.074,9302 774.682,4084 353°40'38"

13+7,565 PCV5 267,565 533.075,4707 774.687,2866 353°40'38"

13+17,565 277,565 533.076,5719 774.697,2255 232,875 353°40'38"

14 280,000 533.076,8401 774.699,6459 232,767 353°40'38"

14+17,565 297,565 533.078,7745 774.717,1038 232,017 353°40'38"

15 300,000 533.079,0427 774.719,5243 231,969 353°40'38"

15+17,565 317,565 533.080,9771 774.736,9822 231,648 353°40'38"

15+19,464 entroncamento 319,464 533.081,1862 774.738,8697 231,629 353°40'38"

16 320,000 533.081,2452 774.739,4026 231,605 353°40'38"

16+7,565 PTV5 327,565 533.082,0784 774.746,9216 353°40'38"

16+17,565 337,565 533.083,1796 774.756,8605 231,057 353°40'38"

17 340,000 533.083,4478 774.759,2810 230,999 353°40'38"

Page 8: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

Aerogeo Ltda.Traçado Horizontal: eixo-rua walter d. da costa

Data: 21/07/08 Hora: 15:15 Página: 2Projeto: Rua Walter da Costa Local: Bagé

Sistema topoGRAPH 98 © 1998 - 1999 char *Pointer Informática

Estaca Descrição Progressiva Norte Este Cota Azimute

17+17,565 PCV6 357,565 533.085,3822 774.776,7388 230,639 353°40'38"

18 360,000 533.085,6504 774.779,1593 230,561 353°40'38"

18+17,565 377,565 533.087,5848 774.796,6172 230,046 353°40'38"

19 380,000 533.087,8529 774.799,0377 229,891 353°40'38"

19+17,565 PTV6 397,565 533.089,7873 774.816,4955 228,791 353°40'38"

20 400,000 533.090,0555 774.818,9160 228,618 353°40'38"

20+17,565 417,565 533.091,9899 774.836,3739 227,416 353°40'38"

21 420,000 533.092,2581 774.838,7944 227,300 353°40'38"

21+4,809 PCV7 424,809 533.092,7877 774.843,5741 353°40'38"

21+15,809 435,809 533.093,9979 774.854,4967 226,191 353°40'38"

22 440,000 533.094,4606 774.858,6727 225,743 353°40'38"

22+14,809 PTV7 454,809 533.096,0915 774.873,3916 353°40'38"

22+14,927 V 454,927 533.096,1045 774.873,5089 223,776 353°40'38"

Page 9: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

Aerogeo Ltda.Vértices (Curvas): eixo-rua walter d. da costa

Data: 21/07/08 Hora: 15:15 Página: 1Projeto: Rua Walter da Costa Local: Bagé

Sistema topoGRAPH 98 © 1998 - 1999 char *Pointer Informática

Curva Horizontal: PD-1 - Circular Simples (Tangente)

Vértice Norte Este Azimute Distância Deflexão

0

PD-1

PF

533.045,2781

533.056,2527

533.096,1045

774.421,4324

774.513,8430

774.873,5089

83°13'38"

83°40'38"

93,060

361,867

0°27'00"

Page 10: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

Aerogeo Ltda.Traçado Horizontal: Eixo-Rua Orvandil A Lucas

Data: 21/07/08 Hora: 15:13 Página: 1Projeto: Rua Walter da Costa Local: Bagé

Sistema topoGRAPH 98 © 1998 - 1999 char *Pointer Informática

Estaca Descrição Progressiva Norte Este Cota Azimute

0 0,000 533.093,9990 774.854,5067 226,191 82°57'51"

0+0,808 0,808 533.093,1970 774.854,6057 226,335 82°57'51"

0+12,936 PCV1 12,936 533.081,1605 774.856,0913 225,867 82°57'51"

0+17,936 PTV1 17,936 533.076,1981 774.856,7037 82°57'51"

1 20,000 533.074,1496 774.856,9566 225,595 82°57'51"

1+0,809 20,809 533.073,3472 774.857,0556 225,564 82°57'51"

2 40,000 533.054,3003 774.859,4064 224,299 82°57'51"

2+0,809 40,809 533.053,4975 774.859,5055 224,245 82°57'51"

2+15,419 PCV2 55,419 533.038,9974 774.861,2951 82°57'51"

3 60,000 533.034,4509 774.861,8562 222,991 82°57'51"

3+0,809 60,809 533.033,6478 774.861,9553 222,933 82°57'51"

4 80,000 533.014,6015 774.864,3060 222,730 82°57'51"

4+0,810 80,810 533.013,7981 774.864,4052 222,730 82°57'51"

5 100,000 532.994,7521 774.866,7559 222,864 82°57'51"

5+0,810 100,810 532.993,9483 774.866,8551 222,871 82°57'51"

5+5,419 PTV2 105,419 532.989,3739 774.867,4197 82°57'51"

5+6,952 PCV3 106,952 532.987,8524 774.867,6074 82°57'51"

6 120,000 532.974,9027 774.869,2057 223,731 82°57'51"

6+0,810 120,810 532.974,0988 774.869,3049 223,767 82°57'51"

6+16,952 PTV3 136,952 532.958,0783 774.871,2822 82°57'51"

7 140,000 532.955,0533 774.871,6555 225,181 82°57'51"

7+0,811 140,811 532.954,2489 774.871,7548 225,242 82°57'51"

8 160,000 532.935,2039 774.874,1054 226,893 82°57'51"

8+0,811 160,811 532.934,3992 774.874,2047 226,963 82°57'51"

8+5,543 PCV4 165,543 532.929,7026 774.874,7843 82°57'51"

9 180,000 532.915,3545 774.876,5552 228,488 82°57'51"

9+0,811 180,811 532.914,5495 774.876,6545 228,555 82°57'51"

9+15,543 PTV4 195,543 532.899,9286 774.878,4591 82°57'51"

10 200,000 532.895,5051 774.879,0050 229,661 82°57'51"

10+0,600 PCV5 200,600 532.894,9096 774.879,0785 82°57'51"

10+0,812 200,812 532.894,6997 774.879,1044 229,707 82°57'51"

10+3,424 PT1 203,424 532.892,1069 774.879,4244 229,871 83°04'22"

10+13,000 213,000 532.882,5986 774.880,5613 230,471 83°10'53"

11 220,000 532.875,6481 774.881,3924 230,660 83°10'53"

11+0,800 220,800 532.874,8541 774.881,4873 230,664 83°10'53"

12 240,000 532.855,7896 774.883,7669 230,330 83°10'53"

12+0,600 PTV5 240,600 532.855,1938 774.883,8381 83°10'53"

12+0,800 240,800 532.854,9951 774.883,8619 230,315 83°10'53"

12+16,077 PCV6 256,077 532.839,8263 774.885,6756 83°10'53"

13 260,000 532.835,9311 774.886,1414 229,490 83°10'53"

13+0,800 260,800 532.835,1365 774.886,2364 229,454 83°10'53"

13+10,100 270,100 532.825,9023 774.887,3405 229,412 83°10'53"

14 280,000 532.816,0725 774.888,5159 229,341 83°10'53"

14+0,800 280,800 532.815,2780 774.888,6109 229,335 83°10'53"

15 300,000 532.796,2140 774.890,8904 229,833 83°10'53"

15+0,800 300,800 532.795,4194 774.890,9854 229,850 83°10'53"

15+16,077 PTV6 316,077 532.780,2507 774.892,7991 83°10'53"

16 320,000 532.776,3554 774.893,2649 230,858 83°10'53"

16+0,800 320,800 532.775,5609 774.893,3599 230,903 83°10'53"

16+12,705 PCV7 332,705 532.763,7403 774.894,7733 83°10'53"

17 340,000 532.756,4969 774.895,6394 232,180 83°10'53"

Page 11: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

Aerogeo Ltda.Traçado Horizontal: Eixo-Rua Orvandil A Lucas

Data: 21/07/08 Hora: 15:13 Página: 2Projeto: Rua Walter da Costa Local: Bagé

Sistema topoGRAPH 98 © 1998 - 1999 char *Pointer Informática

Estaca Descrição Progressiva Norte Este Cota Azimute

17+0,800 340,800 532.755,7023 774.895,7344 232,234 83°10'53"

17+10,800 350,800 532.745,7734 774.896,9216 233,088 83°10'53"

18 360,000 532.736,6383 774.898,0139 233,541 83°10'53"

18+0,800 360,800 532.735,8438 774.898,1089 233,585 83°10'53"

19 380,000 532.716,7798 774.900,3884 233,947 83°10'53"

19+0,800 380,800 532.715,9852 774.900,4834 233,960 83°10'53"

20 400,000 532.696,9213 774.902,7629 234,259 83°10'53"

20+0,800 400,800 532.696,1266 774.902,8579 234,271 83°10'53"

20+8,006 PI2 408,006 532.688,9719 774.903,7134 234,218 83°34'41"

20+12,705 PTV7 412,705 532.684,2988 774.904,2066 83°58'29"

21 420,000 532.677,0441 774.904,9724 234,165 83°58'29"

21+0,802 420,802 532.676,2470 774.905,0565 234,162 83°58'29"

22 440,000 532.657,1546 774.907,0718 233,909 83°58'29"

22+0,804 440,804 532.656,3555 774.907,1561 233,902 83°58'29"

23 460,000 532.637,2651 774.909,1711 233,922 83°58'29"

23+0,806 460,806 532.636,4639 774.909,2557 233,921 83°58'29"

24 480,000 532.617,3756 774.911,2705 234,084 83°58'29"

24+0,709 480,709 532.616,6707 774.911,3449 234,089 83°58'29"

24+10,213 490,213 532.607,2195 774.912,3425 234,283 83°58'29"

25 500,000 532.597,4861 774.913,3699 234,215 83°58'29"

25+0,766 500,766 532.596,7243 774.913,4503 234,214 83°58'29"

26 520,000 532.577,5966 774.915,4693 234,143 83°58'29"

26+0,723 520,723 532.576,8779 774.915,5452 234,138 83°58'29"

26+8,611 PCV8 528,611 532.569,0332 774.916,3732 83°58'29"

27 540,000 532.557,7071 774.917,5687 233,915 83°58'29"

27+0,730 540,730 532.556,9814 774.917,6453 233,907 83°58'29"

28 560,000 532.537,8176 774.919,6681 233,419 83°58'29"

28+0,746 560,746 532.537,0755 774.919,7464 233,401 83°58'29"

28+18,611 PTV8 578,611 532.519,3094 774.921,6217 83°58'29"

29 580,000 532.517,9281 774.921,7675 232,155 83°58'29"

29+0,746 580,746 532.517,1859 774.921,8458 232,107 83°58'29"

30 600,000 532.498,0386 774.923,8669 230,649 83°58'29"

30+0,746 600,746 532.497,2963 774.923,9452 230,587 83°58'29"

30+3,656 PI3 603,656 532.494,4028 774.924,2507 230,415 83°47'41"

30+13,250 PCV9 613,250 532.484,8683 774.925,3176 83°36'54"

31 620,000 532.478,1601 774.926,0683 229,446 83°36'54"

31+0,747 620,747 532.477,4183 774.926,1513 229,401 83°36'54"

31+8,747 628,747 532.469,4679 774.927,0409 228,973 83°36'54"

32 640,000 532.458,2842 774.928,2924 228,467 83°36'54"

32+0,747 640,747 532.457,5422 774.928,3755 228,433 83°36'54"

33 660,000 532.438,4083 774.930,5166 227,926 83°36'54"

33+0,747 660,747 532.437,6663 774.930,5996 227,910 83°36'54"

33+3,250 PTV9 663,250 532.435,1784 774.930,8780 83°36'54"

34 680,000 532.418,5323 774.932,7408 227,602 83°36'54"

34+0,747 680,747 532.417,7903 774.932,8238 227,590 83°36'54"

35 700,000 532.398,6564 774.934,9650 227,390 83°36'54"

35+0,747 700,747 532.397,9142 774.935,0480 227,379 83°36'54"

35+5,615 PCV10 705,615 532.393,0762 774.935,5894 83°36'54"

36 720,000 532.378,7804 774.937,1892 227,283 83°36'54"

36+0,747 720,747 532.378,0383 774.937,2722 227,280 83°36'54"

37 740,000 532.358,9045 774.939,4133 227,535 83°36'54"

Page 12: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

Aerogeo Ltda.Traçado Horizontal: Eixo-Rua Orvandil A Lucas

Data: 21/07/08 Hora: 15:13 Página: 3Projeto: Rua Walter da Costa Local: Bagé

Sistema topoGRAPH 98 © 1998 - 1999 char *Pointer Informática

Estaca Descrição Progressiva Norte Este Cota Azimute

37+0,747 740,747 532.358,1622 774.939,4964 227,545 83°36'54"

37+15,615 PTV10 755,615 532.343,3864 774.941,1499 83°36'54"

37+16,780 V 756,780 532.342,2286 774.941,2794 228,331 83°36'54"

Page 13: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

Aerogeo Ltda.Vértices (Curvas): Eixo-Rua Orvandil A Lucas

Data: 21/07/08 Hora: 15:14 Página: 1Projeto: Rua Walter da Costa Local: Bagé

Sistema topoGRAPH 98 © 1998 - 1999 char *Pointer Informática

Curva Horizontal: PD-1 - Circular Simples (Tangente)

Vértice Norte Este Azimute Distância Deflexão

0

PD-1

PD-2

533.093,9990

532.892,1069

532.688,9719

774.854,5067

774.879,4244

774.903,7134

172°57'51"

173°10'53"

203,424

204,582

0°13'03"

Curva Horizontal: PD-2 - Circular Simples (Tangente)

Vértice Norte Este Azimute Distância Deflexão

PD-1

PD-2

PD-3

532.892,1069

532.688,9719

532.494,4028

774.879,4244

774.903,7134

774.924,2507

173°10'53"

173°58'29"

204,582

195,650

0°47'35"

Curva Horizontal: PD-3 - Circular Simples (Tangente)

Vértice Norte Este Azimute Distância Deflexão

PD-2

PD-3

PF

532.688,9719

532.494,4028

532.342,2286

774.903,7134

774.924,2507

774.941,2794

173°58'29"

173°36'54"

195,650

153,124

0°21'35"

Page 14: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

Aerogeo Ltda.Traçado Horizontal: Eixo-Rua 11 de Junho

Data: 21/07/08 Hora: 15:14 Página: 1Projeto: Rua Walter da Costa Local: Bagé

Sistema topoGRAPH 98 © 1998 - 1999 char *Pointer Informática

Estaca Descrição Progressiva Norte Este Cota Azimute

0 0,000 532.340,4955 774.925,9965 228,570 353°31'24"

0+5,381 PCV1 5,381 532.341,1025 774.931,3432 228,486 353°31'24"

0+10,381 PTV1 10,381 532.341,6665 774.936,3113 228,409 353°31'24"

0+15,381 PIV2 15,381 532.342,2304 774.941,2792 228,331 353°31'24"

0+19,126 19,126 532.342,6529 774.945,0005 228,306 353°31'24"

1 20,000 532.342,7515 774.945,8689 228,286 353°31'24"

1+0,381 PCV3 20,381 532.342,7945 774.946,2475 228,285 353°31'24"

1+5,381 PTV3 25,381 532.343,3585 774.951,2156 228,266 353°31'24"

1+19,128 39,128 532.344,9091 774.964,8745 228,215 353°31'24"

2 40,000 532.345,0075 774.965,7413 228,223 353°31'24"

2+9,177 PCV4 49,177 532.346,0426 774.974,8597 228,306 353°31'24"

2+19,129 59,129 532.347,1652 774.984,7485 228,396 353°31'24"

3 60,000 532.347,2634 774.985,6136 228,424 353°31'24"

3+9,177 PTV4 69,177 532.348,2986 774.994,7320 228,736 353°31'24"

3+10,000 PCV5 70,000 532.348,3914 774.995,5498 228,764 353°31'24"

3+19,131 79,131 532.349,4214 775.004,6226 229,075 353°31'24"

4 80,000 532.349,5194 775.005,4860 229,094 353°31'24"

4+1,257 81,257 532.349,6612 775.006,7346 229,070 353°31'24"

4+10,000 PCCV6 90,000 532.350,6474 775.015,4221 229,262 353°31'24"

4+18,811 98,811 532.351,6412 775.024,1766 229,407 353°31'24"

5 100,000 532.351,7754 775.025,3583 229,452 353°31'24"

5+10,000 PTV6 110,000 532.352,9034 775.035,2945 229,852 353°31'24"

5+15,957 V7 115,957 532.353,5753 775.041,2133 230,090 353°31'24"

5+16,128 PF 116,128 532.353,5946 775.041,3834 230,097 353°31'24"

Page 15: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

Aerogeo Ltda.Traçado Horizontal: Eixo-Av. Gen. Osório

Data: 21/07/08 Hora: 15:12 Página: 1Projeto: Rua Walter da Costa Local: Bagé

Sistema topoGRAPH 98 © 1998 - 1999 char *Pointer Informática

Estaca Descrição Progressiva Norte Este Cota Azimute

0 0,000 532.349,6605 775.006,7348 229,070 81°51'24"

0+5,000 PCV1 5,000 532.344,7109 775.007,4430 81°51'24"

0+9,164 9,164 532.340,5891 775.008,0328 229,904 81°51'24"

0+10,000 PTV1 10,000 532.339,7613 775.008,1513 81°51'24"

0+16,861 16,861 532.332,9698 775.009,1231 230,320 81°51'24"

1 20,000 532.329,8621 775.009,5678 230,460 81°51'24"

1+16,862 36,862 532.313,1706 775.011,9563 231,193 81°51'24"

2 V 40,000 532.310,0638 775.012,4008 231,359 81°51'24"

2+16,457 PF 56,457 532.293,7727 775.014,7320 232,222 81°51'24"

Page 16: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

2 – PROJETO VERTICAL

• RELATÓRIO DO GREIDE DE PROJETO• LISTAGEM DAS CURVAS VERTICAIS

Page 17: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

Aerogeo Ltda.Traçado Vertical: greide aksakof final

Data: 21/07/08 Hora: 15:23 Página: 1Projeto: Rua Walter da Costa Local: Bagé

Sistema topoGRAPH 98 © 1998 - 1999 char *Pointer Informática

Estaca Descrição Cota Seção-tipo

0+9,500 PCV1 239,880 AksakofAksakof

0+14,500 PTV1 239,760

0+17,000 239,745

0+19,500 239,729

1 239,726

2 239,600

3 239,473

4 239,347

4+1,700 239,336

5 239,221

5+10,430 PCV2 239,155

6 239,110

7 239,112

7+2,700 239,123

8 239,246

8+0,430 PTV2 239,251

8+1,985 EIXO WALTER DA COSTA 239,266

8+5,000 PCV3 239,297

9 239,279

9+5,222 239,193

9+15,000 PTV3 238,922

10 V 238,746 AksakofAksakof

Page 18: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

Aerogeo Ltda.Vértices (Curvas): greide aksakof final

Data: 21/07/08 Hora: 15:23 Página: 1Projeto: Rua Walter da Costa Local: Bagé

Sistema topoGRAPH 98 © 1998 - 1999 char *Pointer Informática

Curva Vertical: 2 - Parábola (Comprimento)

Vértice Estaca Cota Rampa (%) Distância K (%)

0

PIV1

PIV2

0+9,5

0+12

6+15,43

239,880

239,776

238,998

-4,15200

-0,63088

2,500

123,430

3,521

Parábola Simples

Comprimento: 5,000 Raio Vertical: 142,000 Constante -0,0035211161 Dist. Externa: -0,022

Pontos Notáveis

Ponto Estaca Cota

PCV1 0+9,500 239,880

PTV1 0+14,500 239,760

Curva Vertical: 3 - Parábola (Comprimento)

Vértice Estaca Cota Rampa (%) Distância K (%)

PIV1

PIV2

PIV3

0+12

6+15,43

9

239,776

238,998

239,449

-0,63088

1,01261

123,430

44,570

1,643

Parábola Simples

Comprimento: 50,000 Raio Vertical: 3.042,300 Constante -0,0001643493 Dist. Externa: -0,103

Pontos Notáveis

Ponto Estaca Cota

PCV2 5+10,430 239,155

PTV2 8+0,430 239,251

Curva Vertical: 4 - Parábola (Comprimento)

Vértice Estaca Cota Rampa (%) Distância K (%)

PIV2

PIV3

PF

6+15,43

9

10

238,998

239,449

238,746

1,01261

-3,51410

44,570

20,000

4,527

Parábola Simples

Comprimento: 30,000 Raio Vertical: -662,733 Constante 0,0007544516 Dist. Externa: 0,170

Pontos Notáveis

Ponto Estaca Cota

PCV3 8+5,000 239,297

PTV3 9+15,000 238,922

Page 19: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

Aerogeo Ltda.Traçado Vertical: GREIDE WALTER

Data: 21/07/08 Hora: 15:25 Página: 1Projeto: Rua Walter da Costa Local: Bagé

Sistema topoGRAPH 98 © 1998 - 1999 char *Pointer Informática

Estaca Descrição Cota Seção-tipo

0+5,000 PCV1 239,203 WALTER DIAS DA COSTAWALTER DIAS DA COSTA

0+10,000 PTV1 239,133

0+16,564 239,113

0+17,566 239,110

1 239,103

1+5,180 239,087

1+15,072 PCV2 239,057

1+17,566 239,043

2 239,018

2+17,566 238,472

3 238,347

3+5,072 PTV2 238,046

3+17,566 237,242

4 237,085

4+13,060 PT1 236,244

4+15,832 PCV3 236,065

4+17,566 235,956

5 235,809

5+17,566 235,010

6 234,934

6+15,832 PTV3 234,655

6+17,566 234,645

7 234,630

7+12,564 234,553

7+17,567 234,523

8 234,508

8+17,657 234,400

9 234,386

9+17,567 234,279

10 234,264

10+17,568 234,157

11 234,142

11+17,565 234,035

12 234,020

12+2,564 234,005

12+2,657 PCV4 234,004

12+17,565 233,727

13 233,647

13+2,657 PTV4 233,547

13+7,565 PCV5 233,353

13+17,565 232,969

14 232,879

14+17,565 232,272

15 232,194

15+17,565 231,671

15+19,464 entroncamento 231,619

16 231,604

16+7,565 PTV5 231,405

16+17,565 231,152

17 231,090

17+17,565 PCV6 230,645

Page 20: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

Aerogeo Ltda.Traçado Vertical: GREIDE WALTER

Data: 21/07/08 Hora: 15:25 Página: 2Projeto: Rua Walter da Costa Local: Bagé

Sistema topoGRAPH 98 © 1998 - 1999 char *Pointer Informática

Estaca Descrição Cota Seção-tipo

18 230,581

18+17,565 229,952

19 229,842

19+17,565 PTV6 228,887

20 228,734

20+17,565 227,635

21 227,483

21+4,809 PCV7 227,182

21+15,809 226,291

22 225,844

22+14,809 PTV7 223,795

22+14,927 V 223,776 WALTER DIAS DA COSTAWALTER DIAS DA COSTA

Page 21: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

Aerogeo Ltda.Vértices (Curvas): GREIDE WALTER

Data: 21/07/08 Hora: 15:25 Página: 1Projeto: Rua Walter da Costa Local: Bagé

Sistema topoGRAPH 98 © 1998 - 1999 char *Pointer Informática

Curva Vertical: 2 - Parábola (Comprimento)

Vértice Estaca Cota Rampa (%) Distância K (%)

0

PIV-1

PIV2

0+5

0+7,5

2+10,0719

239,203

239,140

239,012

-2,50000

-0,29999

2,500

42,572

2,200

Parábola Simples

Comprimento: 5,000 Raio Vertical: 227,271 Constante -0,0022000134 Dist. Externa: -0,014

Pontos Notáveis

Ponto Estaca Cota

PCV1 0+5,000 239,203

PTV1 0+10,000 239,133

Curva Vertical: 3 - Parábola (Comprimento)

Vértice Estaca Cota Rampa (%) Distância K (%)

PIV-1

PIV2

PIV3

0+7,5

2+10,0719

5+15,8318

239,140

239,012

234,777

-0,29999

-6,44031

42,572

65,760

6,140

Parábola Simples

Comprimento: 30,000 Raio Vertical: -488,574 Constante 0,0010233869 Dist. Externa: 0,230

Pontos Notáveis

Ponto Estaca Cota

PCV2 1+15,072 239,057

PTV2 3+5,072 238,046

Curva Vertical: 4 - Parábola (Comprimento)

Vértice Estaca Cota Rampa (%) Distância K (%)

PIV2

PIV3

PIV4

2+10,0719

5+15,8318

12+12,6572

239,012

234,777

233,943

-6,44031

-0,60951

65,760

136,825

5,831

Parábola Simples

Comprimento: 40,000 Raio Vertical: 686,012 Constante -0,0007288501 Dist. Externa: -0,292

Pontos Notáveis

Ponto Estaca Cota

PCV3 4+15,832 236,065

PTV3 6+15,832 234,655

Page 22: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

Aerogeo Ltda.Vértices (Curvas): GREIDE WALTER

Data: 21/07/08 Hora: 15:25 Página: 2Projeto: Rua Walter da Costa Local: Bagé

Sistema topoGRAPH 98 © 1998 - 1999 char *Pointer Informática

Curva Vertical: 5 - Parábola (Comprimento)

Vértice Estaca Cota Rampa (%) Distância K (%)

PIV3

PIV4

PIV5

5+15,8318

12+12,6572

14+17,565

234,777

233,943

232,166

-0,60951

-3,95815

136,825

44,908

3,349

Parábola Simples

Comprimento: 20,000 Raio Vertical: -597,256 Constante 0,0008371619 Dist. Externa: 0,084

Pontos Notáveis

Ponto Estaca Cota

PCV4 12+2,657 234,004

PTV4 13+2,657 233,547

Curva Vertical: 6 - Parábola (Comprimento)

Vértice Estaca Cota Rampa (%) Distância K (%)

PIV4

PIV5

PIV6

12+12,6572

14+17,565

18+17,565

233,943

232,166

230,138

-3,95815

-2,53428

44,908

80,000

1,424

Parábola Simples

Comprimento: 60,000 Raio Vertical: 4.213,840 Constante -0,0001186566 Dist. Externa: -0,107

Pontos Notáveis

Ponto Estaca Cota

PCV5 13+7,565 233,353

PTV5 16+7,565 231,405

Curva Vertical: 7 - Parábola (Comprimento)

Vértice Estaca Cota Rampa (%) Distância K (%)

PIV5

PIV6

PIV7

14+17,565

18+17,565

21+19,809

232,166

230,138

226,243

-2,53428

-6,25770

80,000

62,244

3,723

Parábola Simples

Comprimento: 40,000 Raio Vertical: -1.074,281 Constante 0,0004654276 Dist. Externa: 0,186

Pontos Notáveis

Ponto Estaca Cota

PCV6 17+17,565 230,645

PTV6 19+17,565 228,887

Page 23: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

Aerogeo Ltda.Vértices (Curvas): GREIDE WALTER

Data: 21/07/08 Hora: 15:25 Página: 3Projeto: Rua Walter da Costa Local: Bagé

Sistema topoGRAPH 98 © 1998 - 1999 char *Pointer Informática

Curva Vertical: 8 - Parábola (Comprimento)

Vértice Estaca Cota Rampa (%) Distância K (%)

PIV6

PIV7

PF

18+17,565

21+19,809

22+14,927

230,138

226,243

223,776

-6,25770

-16,31988

62,244

15,118

10,062

Parábola Simples

Comprimento: 30,000 Raio Vertical: -298,146 Constante 0,0016770313 Dist. Externa: 0,377

Pontos Notáveis

Ponto Estaca Cota

PCV7 21+4,809 227,182

PTV7 22+14,809 223,795

Page 24: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

Aerogeo Ltda.Traçado Vertical: GREIDE ORVANDIL

Data: 21/07/08 Hora: 15:24 Página: 1Projeto: Rua Walter da Costa Local: Bagé

Sistema topoGRAPH 98 © 1998 - 1999 char *Pointer Informática

Estaca Descrição Cota Seção-tipo

0 V0 226,291 WALTER DIAS DA COSTAWALTER DIAS DA COSTA

0+0,808 226,275

0+12,936 PCV1 226,044

0+17,936 PTV1 225,842

1 225,715

1+0,809 225,665

2 224,482

2+0,809 224,432

2+15,419 PCV2 223,532

3 223,271

3+0,809 223,230

4 222,637

4+0,810 222,629

5 222,824

5+0,810 222,849

5+5,419 PTV2 223,016

5+6,952 PCV3 223,079

6 223,738

6+0,810 223,786

6+16,952 PTV3 224,961

7 225,218

7+0,811 225,287

8 226,907

8+0,811 226,975

8+5,543 PCV4 227,375

9 228,503

9+0,811 228,561

9+15,543 PTV4 229,510

10 229,768

10+0,600 PCV5 229,802

10+0,812 229,815

10+3,424 PT1 229,957

10+13,000 230,340

11 230,485

11+0,800 230,494

12 230,266

12+0,600 PTV5 230,245

12+0,800 230,238

12+16,077 PCV6 229,691

13 229,565

13+0,800 229,542

13+10,100 229,362

14 229,337

14+0,800 229,342

15 229,809

15+0,800 229,842

15+16,077 PTV6 230,696

16 230,968

16+0,800 231,023

16+12,705 PCV7 231,847

17 232,328

Page 25: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

Aerogeo Ltda.Traçado Vertical: GREIDE ORVANDIL

Data: 21/07/08 Hora: 15:24 Página: 2Projeto: Rua Walter da Costa Local: Bagé

Sistema topoGRAPH 98 © 1998 - 1999 char *Pointer Informática

Estaca Descrição Cota Seção-tipo

17+0,800 232,378

17+10,800 232,952

18 233,399

18+0,800 233,435

19 234,107

19+0,800 234,128

20 234,452

20+0,800 234,458

20+8,006 PI2 234,488

20+12,705 PTV7 234,482

21 234,458

21+0,802 234,455

22 234,390

22+0,804 234,388

23 234,323

23+0,806 234,320

24 234,256

24+0,709 234,253

24+10,213 234,221

25 234,188

25+0,766 234,186

26 234,121

26+0,723 234,118

26+8,611 PCV8 234,092

27 233,969

27+0,730 233,955

28 233,343

28+0,746 233,309

28+18,611 PTV8 232,291

29 232,195

29+0,746 232,144

30 230,822

30+0,746 230,771

30+3,656 PI3 230,571

30+13,250 PCV9 229,912

31 229,474

31+0,747 229,429

31+8,747 228,983

32 228,476

32+0,747 228,448

33 227,927

33+0,747 227,915

33+3,250 PTV9 227,880

34 227,668

34+0,747 227,658

35 227,415

35+0,747 227,406

35+5,615 PCV10 227,344

36 227,292

36+0,747 227,296

37 227,648

Page 26: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

Aerogeo Ltda.Traçado Vertical: GREIDE ORVANDIL

Data: 21/07/08 Hora: 15:24 Página: 3Projeto: Rua Walter da Costa Local: Bagé

Sistema topoGRAPH 98 © 1998 - 1999 char *Pointer Informática

Estaca Descrição Cota Seção-tipo

37+0,747 227,671

37+15,615 PTV10 228,273

37+16,780 V 228,331 WALTER DIAS DA COSTAWALTER DIAS DA COSTA

Page 27: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

Aerogeo Ltda.Vértices (Curvas): GREIDE ORVANDIL

Data: 21/07/08 Hora: 15:24 Página: 1Projeto: Rua Walter da Costa Local: Bagé

Sistema topoGRAPH 98 © 1998 - 1999 char *Pointer Informática

Curva Vertical: 2 - Parábola (Comprimento)

Vértice Estaca Cota Rampa (%) Distância K (%)

0

PIV1

PIV2

0

0+15,4358

4+0,4189

226,291

225,996

221,992

-1,91023

-6,16186

15,436

64,983

4,252

Parábola Simples

Comprimento: 5,000 Raio Vertical: -117,602 Constante 0,0042516290 Dist. Externa: 0,027

Pontos Notáveis

Ponto Estaca Cota

PCV1 0+12,936 226,044

PTV1 0+17,936 225,842

Curva Vertical: 3 - Parábola (Comprimento)

Vértice Estaca Cota Rampa (%) Distância K (%)

PIV1

PIV2

PIV3

0+15,4358

4+0,4189

6+1,9517

225,996

221,992

223,694

-6,16186

4,09958

64,983

41,533

10,261

Parábola Simples

Comprimento: 50,000 Raio Vertical: 487,261 Constante -0,0010261443 Dist. Externa: -0,641

Pontos Notáveis

Ponto Estaca Cota

PCV2 2+15,419 223,532

PTV2 5+5,419 223,016

Curva Vertical: 4 - Parábola (Comprimento)

Vértice Estaca Cota Rampa (%) Distância K (%)

PIV2

PIV3

PIV4

4+0,4189

6+1,9517

9+0,543

221,992

223,694

228,642

4,09958

8,44364

41,533

58,591

4,344

Parábola Simples

Comprimento: 30,000 Raio Vertical: 690,598 Constante -0,0007240106 Dist. Externa: -0,163

Pontos Notáveis

Ponto Estaca Cota

PCV3 5+6,952 223,079

PTV3 6+16,952 224,961

Page 28: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

Aerogeo Ltda.Vértices (Curvas): GREIDE ORVANDIL

Data: 21/07/08 Hora: 15:24 Página: 2Projeto: Rua Walter da Costa Local: Bagé

Sistema topoGRAPH 98 © 1998 - 1999 char *Pointer Informática

Curva Vertical: 5 - Parábola (Comprimento)

Vértice Estaca Cota Rampa (%) Distância K (%)

PIV3

PIV4

PIV5

6+1,9517

9+0,543

11+0,6

223,694

228,642

230,960

8,44364

5,78798

58,591

40,057

2,656

Parábola Simples

Comprimento: 30,000 Raio Vertical: -1.129,660 Constante 0,0004426109 Dist. Externa: 0,100

Pontos Notáveis

Ponto Estaca Cota

PCV4 8+5,543 227,375

PTV4 9+15,543 229,510

Curva Vertical: 6 - Parábola (Comprimento)

Vértice Estaca Cota Rampa (%) Distância K (%)

PIV4

PIV5

PIV6

9+0,543

11+0,6

14+6,0772

228,642

230,960

228,619

5,78798

-3,57595

40,057

65,477

9,364

Parábola Simples

Comprimento: 40,000 Raio Vertical: -427,171 Constante 0,0011704905 Dist. Externa: 0,468

Pontos Notáveis

Ponto Estaca Cota

PCV5 10+0,600 229,802

PTV5 12+0,600 230,245

Curva Vertical: 7 - Parábola (Comprimento)

Vértice Estaca Cota Rampa (%) Distância K (%)

PIV5

PIV6

PIV7

11+0,6

14+6,0772

18+12,7047

230,960

228,619

234,617

-3,57595

6,92463

65,477

86,628

10,501

Parábola Simples

Comprimento: 60,000 Raio Vertical: 571,397 Constante -0,0008750477 Dist. Externa: -0,788

Pontos Notáveis

Ponto Estaca Cota

PCV6 12+16,077 229,691

PTV6 15+16,077 230,696

Page 29: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

Aerogeo Ltda.Vértices (Curvas): GREIDE ORVANDIL

Data: 21/07/08 Hora: 15:24 Página: 3Projeto: Rua Walter da Costa Local: Bagé

Sistema topoGRAPH 98 © 1998 - 1999 char *Pointer Informática

Curva Vertical: 8 - Parábola (Comprimento)

Vértice Estaca Cota Rampa (%) Distância K (%)

PIV6

PIV7

PIV8

14+6,0772

18+12,7047

27+13,6106

228,619

234,617

234,007

6,92463

-0,33705

86,628

180,906

7,262

Parábola Simples

Comprimento: 80,000 Raio Vertical: -1.101,674 Constante 0,0004538550 Dist. Externa: 0,726

Pontos Notáveis

Ponto Estaca Cota

PCV7 16+12,705 231,847

PTV7 20+12,705 234,482

Curva Vertical: 9 - Parábola (Comprimento)

Vértice Estaca Cota Rampa (%) Distância K (%)

PIV7

PIV8

PIV9

18+12,7047

27+13,6106

31+18,2504

234,617

234,007

228,196

-0,33705

-6,86660

180,906

84,640

6,530

Parábola Simples

Comprimento: 50,000 Raio Vertical: -765,750 Constante 0,0006529550 Dist. Externa: 0,408

Pontos Notáveis

Ponto Estaca Cota

PCV8 26+8,611 234,092

PTV8 28+18,611 232,291

Curva Vertical: 10 - Parábola (Comprimento)

Vértice Estaca Cota Rampa (%) Distância K (%)

PIV8

PIV9

PIV10

27+13,6106

31+18,2504

36+10,6152

234,007

228,196

227,028

-6,86660

-1,26388

84,640

92,365

5,603

Parábola Simples

Comprimento: 50,000 Raio Vertical: 892,423 Constante -0,0005602724 Dist. Externa: -0,350

Pontos Notáveis

Ponto Estaca Cota

PCV9 30+13,250 229,912

PTV9 33+3,250 227,880

Page 30: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

Aerogeo Ltda.Vértices (Curvas): GREIDE ORVANDIL

Data: 21/07/08 Hora: 15:24 Página: 4Projeto: Rua Walter da Costa Local: Bagé

Sistema topoGRAPH 98 © 1998 - 1999 char *Pointer Informática

Curva Vertical: 11 - Parábola (Comprimento)

Vértice Estaca Cota Rampa (%) Distância K (%)

PIV9

PIV10

PF

31+18,2504

36+10,6152

37+16,7800

228,196

227,028

228,331

-1,26388

4,97925

92,365

26,165

6,243

Parábola Simples

Comprimento: 50,000 Raio Vertical: 800,881 Constante -0,0006243127 Dist. Externa: -0,390

Pontos Notáveis

Ponto Estaca Cota

PCV10 35+5,615 227,344

PTV10 37+15,615 228,273

Page 31: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

Aerogeo Ltda.Traçado Vertical: GREIDE 11 DE JUNHO

Data: 21/07/08 Hora: 15:23 Página: 1Projeto: Rua Walter da Costa Local: Bagé

Sistema topoGRAPH 98 © 1998 - 1999 char *Pointer Informática

Estaca Descrição Cota Seção-tipo

0 V0 228,570 WALTER DIAS DA COSTAWALTER DIAS DA COSTA

0+5,381 PCV1 228,279

0+10,381 PTV1 228,206

0+15,381 PIV2 228,331

0+19,126 228,237

1 228,216

1+0,381 PCV3 228,206

1+5,381 PTV3 228,158

1+19,128 228,239

2 228,244

2+9,177 PCV4 228,298

2+19,129 228,452

3 228,474

3+9,177 PTV4 228,802

3+10,000 PCV5 228,839

3+19,131 229,171

4 229,195

4+1,257 229,226

4+10,000 PCCV6 229,369

4+18,811 229,504

5 229,531

5+10,000 PTV6 229,852

5+15,957 V7 230,090 WALTER DIAS DA COSTAWALTER DIAS DA COSTA

Page 32: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

Aerogeo Ltda.Vértices (Curvas): GREIDE 11 DE JUNHO

Data: 21/07/08 Hora: 15:23 Página: 1Projeto: Rua Walter da Costa Local: Bagé

Sistema topoGRAPH 98 © 1998 - 1999 char *Pointer Informática

Curva Vertical: 2 - Parábola (Comprimento)

Vértice Estaca Cota Rampa (%) Distância K (%)

0

PIV1

PIV2

0

0+7,881

0+15,381

228,570

228,144

228,331

-5,41175

2,50000

7,881

7,500

7,912

Parábola Simples

Comprimento: 5,000 Raio Vertical: 63,197 Constante -0,0079117498 Dist. Externa: -0,049

Pontos Notáveis

Ponto Estaca Cota

PCV1 0+5,381 228,279

PTV1 0+10,381 228,206

Curva Vertical: 3 - Ponto de Intersecção

Vértice Estaca Cota Rampa (%) Distância K (%)

PIV1

PIV2

PIV3

0+7,881

0+15,381

1+2,881

228,144

228,331

228,144

2,50000

-2,50000

7,500

7,500

5,000

Curva Vertical: 4 - Parábola (Comprimento)

Vértice Estaca Cota Rampa (%) Distância K (%)

PIV2

PIV3

PIV4

0+15,381

1+2,881

2+19,177

228,331

228,144

228,356

-2,50000

0,58582

7,500

36,296

3,086

Parábola Simples

Comprimento: 5,000 Raio Vertical: 162,031 Constante -0,0030858221 Dist. Externa: -0,019

Pontos Notáveis

Ponto Estaca Cota

PCV3 1+0,381 228,206

PTV3 1+5,381 228,158

Page 33: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

Aerogeo Ltda.Vértices (Curvas): GREIDE 11 DE JUNHO

Data: 21/07/08 Hora: 15:23 Página: 2Projeto: Rua Walter da Costa Local: Bagé

Sistema topoGRAPH 98 © 1998 - 1999 char *Pointer Informática

Curva Vertical: 5 - Parábola (Comprimento)

Vértice Estaca Cota Rampa (%) Distância K (%)

PIV3

PIV4

PIV5

1+2,881

2+19,177

4

228,144

228,356

229,285

0,58582

4,46228

36,296

20,823

3,876

Parábola Simples

Comprimento: 20,000 Raio Vertical: 515,935 Constante -0,0009691138 Dist. Externa: -0,097

Pontos Notáveis

Ponto Estaca Cota

PCV4 2+9,177 228,298

PTV4 3+9,177 228,802

Curva Vertical: 6 - Parábola (Comprimento)

Vértice Estaca Cota Rampa (%) Distância K (%)

PIV4

PIV5

PIV6

2+19,177

4

5

228,356

229,285

229,452

4,46228

0,83345

20,823

20,000

3,629

Parábola Simples

Comprimento: 20,000 Raio Vertical: -551,142 Constante 0,0009072068 Dist. Externa: 0,091

Pontos Notáveis

Ponto Estaca Cota

PCV5 3+10,000 228,839

PCCV6 4+10,000 229,369

Curva Vertical: 7 - Parábola (Comprimento)

Vértice Estaca Cota Rampa (%) Distância K (%)

PIV5

PIV6

PIV7

4

5

5+15,957

229,285

229,452

230,090

0,83345

3,99825

20,000

15,957

3,165

Parábola Simples

Comprimento: 20,000 Raio Vertical: 631,952 Constante -0,0007911988 Dist. Externa: -0,079

Pontos Notáveis

Ponto Estaca Cota

PCCV6 4+10,000 229,369

PTV6 5+10,000 229,852

Page 34: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

Aerogeo Ltda.Traçado Vertical: GREIDE GEN OSÓRIO

Data: 21/07/08 Hora: 15:23 Página: 1Projeto: Rua Walter da Costa Local: Bagé

Sistema topoGRAPH 98 © 1998 - 1999 char *Pointer Informática

Estaca Descrição Cota Seção-tipo

0 V0 229,195 GEN OSÓRIOGEN OSÓRIO

0+5,000 PCV1 229,070

0+9,164 229,135

0+10,000 PTV1 229,188

0+16,861 229,685

1 229,912

1+16,862 231,132

2 V 231,359 GEN OSÓRIOGEN OSÓRIO

Page 35: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

Aerogeo Ltda.Vértices (Curvas): GREIDE GEN OSÓRIO

Data: 21/07/08 Hora: 15:24 Página: 1Projeto: Rua Walter da Costa Local: Bagé

Sistema topoGRAPH 98 © 1998 - 1999 char *Pointer Informática

Curva Vertical: 2 - Parábola (Comprimento)

Vértice Estaca Cota Rampa (%) Distância K (%)

0

PIV1

PF

0

0+7,5

2

229,195

229,008

231,359

-2,50000

7,23538

7,500

32,500

9,735

Parábola Simples

Comprimento: 5,000 Raio Vertical: 51,359 Constante -0,0097353846 Dist. Externa: -0,061

Pontos Notáveis

Ponto Estaca Cota

PCV1 0+5,000 229,070

PTV1 0+10,000 229,188

Page 36: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

3 – SONDAGENS

Page 37: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

BOLETIM DE SONDAGEM

RUAS - AKSAKOF, WALTER D. DA COSTA, ERVANDIL, 11 DE JUNHO E GEN. OSÓRIO

LOCAL DE SONDAGEM REG

.

TIPO DE SOLO

ESTACA PROFUNDIDADE CLASSIFICAÇÃO VISUAL

2 RUA ERVANDIL A. LUCAS (EIXO) 1,10 0 SAIBRO ARGILOSO

5 RUA AKSAKOF (LE) 1,20 1 TURFA PRETA

11RUA WALTER D. DA COSTA (EIXO) 1,00

2SAIBRO AMARELO

RUA WALTER D. DA COSTA (LE) 1,20 RESIDUO CARVÃO CASCALHO TURFA

16 RUA WALTER D. DA COSTA (LE) 1,00 3 SAIBRO AMARELO

21 RUA WALTER D. DA COSTA (LE) 1,00 4 ARENITO ARGILOSO AMARELO

26 RUA WALTER D. DA COSTA (LE) 1,00 5 SAIBRO AMARELO

32 RUA WALTER D. DA COSTA (LD) 0,80 6 CASCALHO COM ARGILA AMARELA

37 RUA WALTER D. DA COSTA (LE) 1,00 7 ARENITO ARGILOSO AMARELO

42 RUA ERVANDIL A. LUCAS (EIXO) 1,00 8 ARENITO ARGILOSO AMARELO

47 RUA ERVANDIL A. LUCAS (EIXO) 1,00 9 ARENITO ARGILOSO AMARELO

53 RUA ERVANDIL A. LUCAS (EIXO)0,40

10TURFA PRETA

1,10 ARGILA AMARELA

58 RUA ERVANDIL A. LUCAS (EIXO) 1,00 11 ARENITO ARGILOSO AMARELO

66 RUA ERVANDIL A. LUCAS (EIXO)0,60

12ARENITO ARGILOSO

1,20 TURFA CINZA CLARA

70 RUA 11 DE JUNHO (EIXO) 1,00 13 ARENITO ARGILOSO AMARELO

POSIÇÃO

Page 38: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

QUADRO RESUMO DE ENSAIOSLOCAL DA SONDAGEM

ANÁLISE GRANULOMÍETRICA ENSAIOSCLASSIFIC. I.S.C TIPO DE SOLO

(% QUE PASSA NA PENEIRA) FÍSICOSFURO PRFUND. EST. EIXO LOC. LADO CASA 3/8´´ 4 10 20 40 60 200,0 LL IP IG HRB h ISC Classificação Visual

RUA AKSAKOF DE VILHENA0 0-1,10 2,00 E S/Nº 100,0 87,0 65,0 53,5 36,0 19,75 8 A-6 1845 9,8 9,4 1833 0,80 12,8 SAIBRO ARGILOSO

1 0-1,20 5,00 LE S/Nº 100,0 97,5 73,0 50,0 37,0 21,2 7 A-6 1800 13,0 12,7 1788 2,77 6,46 TURFA NEGRA

RUA WALTER DIAS DA COSTA2 0-1,00 11,00 E S/Nº 100,0 87,0 65,5 52,0 30,5 15,02 6 A-6 1910 16,8 15,9 1898 0,17 13,2 SAIBRO AMARELO

2 0-1,20 11,00 LE S/Nº 100,0 95,5 74,5 49,0 36,0 17,7 6 A-6 1670 19,2 18,7 1658 2,74 0,89 RESIDUO CARVÃO, CASCALHO, TURFA.

3 0-1,00 16,00 LE S/Nº 100,0 83,5 62,0 49,5 35,0 19,15 7 A-6 1915 18,0 17,9 1903 0,16 12,2 SAIBRO AMARELO

4 0-1,00 21,00 E S/Nº 100,0 87,0 63,5 51,0 37,0 19,5 7 A-6 1820 14,8 14,1 1807 0,18 11,3 ARENITO ARGILOSO AMARELO

5 0-1,00 26,00 LE S/Nº 100,0 85,5 62,5 47,0 37,5 21,75 7 A-6 1890 15,2 14,8 1880 1,61 11,9 SAIBRO AMARELO

RUA ORVANDIL ALVES LUCAS6 0-0,80 32,00 LD S/Nº 100,0 82,5 58,5 42,0 32,5 17,18 4 A-6 1805 18,4 18,3 1794 0,19 10,7 CASCALHO COM ARGILA AMARELA

7 0-1,00 37,00 LE S/Nº 100,0 87,0 63,5 49,0 34,0 18,3 6 A-6 1830 16,7 16,5 1817 0,15 12,5 ARENITO ARGILOSO AMARELO

8 0-1,00 42,00 E S/Nº 100,0 85,5 62,5 47,0 38,0 22,1 7 A-6 1795 16,7 16,3 1783 0,81 12,6 ARENITO ARGILOSO AMARELO

9 0-1,00 47,00 E S/Nº 100,0 87,5 64,5 52,0 37,0 21,07 8 A-6 1815 15,8 15,2 1803 0,72 13,2 ARENITO ARGILOSO AMARELO

10 0-0,40 53,00 E S/Nº 100,0 85,5 64,0 50,5 40,0 24,1 9 A-6 1675 17,6 16,7 1663 2,78 7,3 TURFA NEGRA

10 0-1,10 53,00 E S/Nº 100,0 83,0 63,5 50,0 32,0 16,4 6 A-6 1750 16,0 15,9 1737 0,81 13,2 ARGILA AMARELA

11 0-1,00 58,00 E S/Nº 100,0 86,0 66,5 58,0 38,5 20,65 9 A-6 1800 18,1 17,9 1788 0,81 12,1 ARENITO ARGILOSO AMARELO

12 0-0,60 66,00 E S/Nº 100,0 87,5 66,0 52,0 37,0 19,0 7 A-6 1810 16,9 16,6 1798 0,63 11,3 ARENITO ARGILOSO

12 0-1,20 66,00 E S/Nº 100,0 96,0 71,5 49,5 38,5 22,72 8 A-6 1670 18,0 17,6 1658 2,78 10,7 TURFA CINZA CLARA

RUA 11 DE JUNHO13 0-1,00 70,00 E S/Nº 100,0 86,0 64,5 53,0 36,0 19,9 8 A-6 1810 18,0 18,2 1798 0,90 13,1 ARENITO ARGILOSO AMARELO

Comp. AASTHO

Dmax Hot. dens. exp.

Page 39: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

4 – PLANILHA DE CÁLCULO DO ISP

Page 40: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

DA

DO DADOS DOS ENSAIOS DADOS NÃO ESCOIMADOS

FURO ISC OBS ISC OBS1 2 12,80 12,80 ###2 5 6,46 1 - ###3 11 13,20 13,20 ###4 16 12,20 12,20 ###5 21 11,30 11,30 ###6 26 11,90 11,90 ###7 32 10,70 10,70 ###8 37 12,50 12,50 ###9 42 12,60 12,60 ###

10 47 13,20 13,20 ###11 53 7,31 1 - ###12 53 13,20 13,20 ###13 58 12,10 12,10 ###14 66 11,30 11,30 ###15 70 13,10 13,10 ###

- ###- ###- ###

11,59 MÉDIA 12,32 MÉDIAS 2,06 DESVIO 0,83 DESVION 15,0 N AMOSTRAS 13,0 N AMOSTRAS

CV 17,81 C. VARIAÇÃO 6,7 C. VARIAÇÃOK 1,29 K 1,29 K

9,50 LIM INF 11,46 LIM INF13,68 LIM SUP 13,17 LIM SUP

ISp 10,90 ISp 12,02 ISp

COM DADOS DAS CAMADAS SIGNIFICATIVASOBS.:

1 Valores de ISC excluídos do cálculo estatístico por estarem fora do intervalo de aceitação2 Valores de ISC excluídos do cálculo estatístico por apresentar expansão >=2%

CÁLCULO DO ISp - ANÁLISE ESTATÍSTICA

ISCméd

CV = (100.S ) / ISCmédCoef. de Student

Linf Linf=ISCméd-((k.S)/(N^(0,5)))-0,68.SLsup Lsup=ISCméd+((k.S)/(N^(0,5)))+0,68.S

ISp=ISCméd-((k.S) / (N)^(0,5))

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

Lin

01

2

3

4

5

6

7

89

10

11

12

13

14

DADOS

ISC

Page 41: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

5 – NOTAS DE SERVIÇO

Page 42: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

NOTAS DE SERVIÇO DE PAVIMENTAÇÃORUA WALTER DIAS DA COSTA

ESTACALADO ESQUERDO EIXO LADO DIREITO

OFF-SET PASSEIO PLATAFORMA COTAS PLATAFORMA PASSEIO OFF-SETDIST. COTA TIPO DIST. COTA INC (%) DIST. COTA DIST. SE (%) COTA TERRENO GREIDE DIF. TIPO DIST. SE (%) COTA DIST. COTA INC (%) DIST. COTA DIST. COTA TIPO

00+16,564 8,682 239,390 C 8,500 239,208 2,000 5,000 239,138 5,000 -2,500 238,988 239,212 239,113 0,099 C 5,000 -2,500 238,988 5,000 239,138 2,000 8,500 239,208 9,105 239,813 A0+17,566 8,658 239,363 C 8,500 239,205 2,000 5,000 239,135 5,000 -2,500 238,985 239,289 239,110 0,179 C 5,000 -2,500 238,985 5,000 239,135 2,000 8,500 239,205 8,823 239,528 A1+5,180 8,745 239,019 A 8,500 239,182 2,000 5,000 239,112 5,000 -2,500 238,962 239,510 239,087 0,423 C 5,000 -2,500 238,962 5,000 239,112 2,000 8,500 239,182 8,906 239,588 A1+17,566 8,728 239,366 C 8,500 239,138 2,000 5,000 239,068 5,000 -2,500 238,918 239,260 239,043 0,217 C 5,000 -2,500 238,918 5,000 239,068 2,000 8,500 239,138 8,949 239,587 A2+17,566 8,960 239,027 C 8,500 238,567 2,000 5,000 238,497 5,000 -2,500 238,347 238,422 238,472 -0,050 A 5,000 -2,500 238,347 5,000 238,497 2,000 8,500 238,567 8,656 238,723 A3+17,566 8,850 237,687 C 8,500 237,337 2,000 5,000 237,267 5,000 -2,500 237,117 237,200 237,242 -0,042 A 5,000 -2,500 237,117 5,000 237,267 2,000 8,500 237,337 9,123 237,960 A4+13,060 8,516 236,329 A 8,500 236,339 2,000 5,000 236,269 5,000 -2,500 236,119 236,244 236,244 --- C 5,000 -2,500 236,119 5,000 236,269 2,000 8,500 236,339 8,537 236,376 A4+17,566 8,847 236,398 C 8,500 236,051 2,000 5,000 235,981 5,000 -2,500 235,831 235,970 235,956 0,014 C 5,000 -2,500 235,831 5,000 235,981 2,000 8,500 236,051 8,755 236,306 A5+17,566 8,859 234,866 A 8,500 235,105 2,000 5,000 235,035 5,000 -2,500 234,885 235,030 235,010 0,020 C 5,000 -2,500 234,885 5,000 235,035 2,000 8,500 235,105 8,578 235,183 A6+17,566 9,176 234,289 A 8,500 234,740 2,000 5,000 234,670 5,000 -2,500 234,520 234,583 234,645 -0,062 A 5,000 -2,500 234,520 5,000 234,670 2,000 8,500 234,740 8,602 234,842 A7+12,564 9,195 234,185 A 8,500 234,648 2,000 5,000 234,578 5,000 -2,500 234,428 234,480 234,553 -0,073 A 5,000 -2,500 234,428 5,000 234,578 2,000 8,500 234,648 8,681 234,527 C7+17,567 9,375 234,035 A 8,500 234,618 2,000 5,000 234,548 5,000 -2,500 234,398 234,454 234,523 -0,069 A 5,000 -2,500 234,398 5,000 234,548 2,000 8,500 234,618 8,906 234,347 C8+17,657 8,575 234,570 C 8,500 234,495 2,000 5,000 234,425 5,000 -2,500 234,275 234,308 234,400 -0,092 A 5,000 -2,500 234,275 5,000 234,425 2,000 8,500 234,495 8,722 234,717 A9+17,567 9,002 234,040 A 8,500 234,374 2,000 5,000 234,304 5,000 -2,500 234,154 234,095 234,279 -0,184 A 5,000 -2,500 234,154 5,000 234,304 2,000 8,500 234,374 8,853 234,139 C10+17,568 8,863 234,010 A 8,500 234,252 2,000 5,000 234,182 5,000 -2,500 234,032 233,944 234,157 -0,213 A 5,000 -2,500 234,032 5,000 234,182 2,000 8,500 234,252 8,506 234,258 A11+17,565 8,961 233,822 A 8,500 234,130 2,000 5,000 234,060 5,000 -2,500 233,910 234,025 234,035 -0,010 A 5,000 -2,500 233,910 5,000 234,060 2,000 8,500 234,130 8,799 234,429 A12+2,564 8,705 233,963 A 8,500 234,100 2,000 5,000 234,030 5,000 -2,500 233,880 234,017 234,005 0,012 C 5,000 -2,500 233,880 5,000 234,030 2,000 8,500 234,100 8,942 234,541 A12+17,565 8,511 233,832 C 8,500 233,822 2,000 5,000 233,752 5,000 -2,500 233,602 233,676 233,727 -0,051 A 5,000 -2,500 233,602 5,000 233,752 2,000 8,500 233,822 8,545 233,792 C13+17,565 9,183 232,609 A 8,500 233,064 2,000 5,000 232,994 5,000 -2,500 232,844 232,875 232,969 -0,094 A 5,000 -2,500 232,844 5,000 232,994 2,000 6,970 233,033 7,075 233,138 A14+17,565 9,135 231,943 A 8,500 232,367 2,000 5,000 232,297 5,000 -2,500 232,147 232,017 232,272 -0,255 A 5,000 -2,500 232,147 5,000 232,297 2,000 8,500 232,367 8,504 232,364 C15+17,565 9,341 231,205 A 8,500 231,766 2,000 5,000 231,696 5,000 -2,500 231,546 231,648 231,671 -0,023 A 5,000 -2,500 231,546 5,000 231,696 2,000 8,500 231,766 8,714 231,980 A15+19,464 9,352 231,146 A 8,500 231,714 2,000 5,000 231,644 5,000 -2,500 231,494 231,629 231,619 0,010 C 5,000 -2,500 231,494 5,000 231,644 2,000 8,500 231,714 8,759 231,973 A16+17,565 8,757 231,076 A 8,500 231,247 2,000 5,000 231,177 5,000 -2,500 231,027 231,057 231,152 -0,095 A 5,000 -2,500 231,027 5,000 231,177 2,000 8,009 231,237 8,473 231,702 A17+17,565 8,940 230,447 A 8,500 230,740 2,000 5,000 230,670 5,000 -2,500 230,520 230,639 230,645 -0,006 A 5,000 -2,500 230,520 5,000 230,670 2,000 8,500 230,740 8,639 230,879 A18+17,565 8,624 230,171 C 8,500 230,047 2,000 5,000 229,977 5,000 -2,500 229,827 230,046 229,952 0,094 C 5,000 -2,500 229,827 5,000 229,977 2,000 8,500 230,047 8,595 230,142 A19+17,565 8,564 229,046 C 8,500 228,982 2,000 5,000 228,912 5,000 -2,500 228,762 228,791 228,887 -0,096 A 5,000 -2,500 228,762 5,000 228,912 2,000 8,500 228,982 8,747 229,229 A20+17,565 8,987 228,217 C 8,500 227,730 2,000 5,000 227,660 5,000 -2,500 227,510 227,416 227,635 -0,219 A 5,000 -2,500 227,510 5,000 227,660 2,000 8,500 227,730 8,583 227,674 C22+14,927 8,000 224,647 C 7,201 223,845 2,000 5,000 223,801 5,000 -2,500 223,651 223,776 223,776 --- C 5,000 -2,500 223,651 5,000 223,801 2,000 8,500 223,871 8,913 224,284 A

Page 43: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

NOTAS DE SERVIÇO DE PAVIMENTAÇÃORUA ORVANDIL LUCAS

ESTACALADO ESQUERDO EIXO LADO DIREITO

OFF-SET PASSEIO PLATAFORMA COTAS PLATAFORMA PASSEIO OFF-SETDIST. COTA TIPO DIST. COTA INC (%) DIST. COTA DIST. SE (%) COTA TERRENO GREIDE DIF. TIPO DIST. SE (%) COTA DIST. COTA INC (%) DIST. COTA DIST. COTA TIPO

00 10,763 224,877 A 8,500 226,386 2,000 5,000 226,316 5,000 -2,500 226,166 226,191 226,291 -0,100 A 5,000 -2,500 226,166 5,000 226,316 2,000 8,500 226,386 8,793 226,191 C

0+0,808 10,677 224,919 A 8,500 226,370 2,000 5,000 226,300 5,000 -2,500 226,150 226,335 226,275 0,060 C 5,000 -2,500 226,150 5,000 226,300 2,000 8,500 226,370 9,093 226,963 A1+0,809 9,002 225,426 A 8,500 225,760 2,000 5,000 225,690 5,000 -2,500 225,540 225,564 225,665 -0,101 A 5,000 -2,500 225,540 5,000 225,690 2,000 8,500 225,760 10,148 227,408 A2+0,809 10,343 223,298 A 8,500 224,527 2,000 5,000 224,457 5,000 -2,500 224,307 224,245 224,432 -0,187 A 5,000 -2,500 224,307 5,000 224,457 2,000 8,500 224,527 11,197 227,224 A3+0,809 9,079 222,939 A 8,500 223,325 2,000 5,000 223,255 5,000 -2,500 223,105 222,933 223,230 -0,297 A 5,000 -2,500 223,105 5,000 223,255 2,000 8,500 223,325 9,993 224,818 A4+0,810 9,309 222,185 A 8,500 222,724 2,000 5,000 222,654 5,000 -2,500 222,504 222,730 222,629 0,101 C 5,000 -2,500 222,504 5,000 222,654 2,000 8,500 222,724 9,055 223,279 A5+0,810 9,045 222,581 A 8,500 222,944 2,000 5,000 222,874 5,000 -2,500 222,724 222,871 222,849 0,022 C 5,000 -2,500 222,724 5,000 222,874 2,000 8,144 222,937 8,219 222,887 C6+0,810 9,184 223,425 A 8,500 223,881 2,000 5,000 223,811 5,000 -2,500 223,661 223,767 223,786 -0,019 A 5,000 -2,500 223,661 5,000 223,811 2,000 7,057 223,852 --- --- A7+0,811 8,738 225,620 C 8,500 225,382 2,000 5,000 225,312 5,000 -2,500 225,162 225,242 225,287 -0,045 A 5,000 -2,500 225,162 5,000 225,312 2,000 7,331 225,359 7,531 225,559 A8+0,811 8,926 227,496 C 8,500 227,070 2,000 5,000 227,000 5,000 -2,500 226,850 226,963 226,975 -0,012 A 5,000 -2,500 226,850 5,000 227,000 2,000 7,488 227,050 8,235 227,578 A9+0,811 8,710 228,866 C 8,500 228,656 2,000 5,000 228,586 5,000 -2,500 228,436 228,555 228,561 -0,006 A 5,000 -2,500 228,436 5,000 228,586 2,000 7,852 228,643 8,316 229,107 A

10+0,812 8,641 230,051 C 8,500 229,910 2,000 5,000 229,840 5,000 -2,500 229,690 229,707 229,815 -0,108 A 5,000 -2,500 229,690 5,000 229,840 2,000 8,500 229,910 8,716 230,126 A10+13,000 8,793 230,240 A 8,500 230,435 2,000 5,000 230,365 5,000 -2,500 230,215 230,472 230,340 0,132 C 5,000 -2,500 230,215 5,000 230,365 2,000 8,500 230,435 8,715 230,650 A11+0,800 8,766 230,855 C 8,500 230,589 2,000 5,000 230,519 5,000 -2,500 230,369 230,664 230,494 0,170 C 5,000 -2,500 230,369 5,000 230,519 2,000 8,500 230,589 9,222 231,311 A12+0,800 8,837 230,670 C 8,500 230,333 2,000 5,000 230,263 5,000 -2,500 230,113 230,315 230,238 0,077 C 5,000 -2,500 230,113 5,000 230,263 2,000 8,500 230,333 8,812 230,645 A13+0,800 9,407 229,033 A 8,500 229,637 2,000 5,000 229,567 5,000 -2,500 229,417 229,454 229,542 -0,088 A 5,000 -2,500 229,417 5,000 229,567 2,000 8,500 229,637 8,815 229,951 A14+0,800 9,090 229,044 A 8,500 229,437 2,000 5,000 229,367 5,000 -2,500 229,217 229,335 229,342 -0,007 A 5,000 -2,500 229,217 5,000 229,367 2,000 8,500 229,437 8,606 229,543 A15+0,800 8,593 229,875 A 8,500 229,937 2,000 5,000 229,867 5,000 -2,500 229,717 229,850 229,842 0,008 C 5,000 -2,500 229,717 5,000 229,867 2,000 8,500 229,937 8,545 229,982 A16+0,800 8,634 231,252 C 8,500 231,118 2,000 5,000 231,048 5,000 -2,500 230,898 230,903 231,023 -0,120 A 5,000 -2,500 230,898 5,000 231,048 2,000 8,500 231,118 8,820 231,438 A17+0,800 8,676 232,649 C 8,500 232,473 2,000 5,000 232,403 5,000 -2,500 232,253 232,234 232,378 -0,144 A 5,000 -2,500 232,253 5,000 232,403 2,000 8,500 232,473 8,729 232,702 A17+10,800 9,132 232,626 A 8,500 233,047 2,000 5,000 232,977 5,000 -2,500 232,827 233,088 232,952 0,136 C 5,000 -2,500 232,827 5,000 232,977 2,000 8,500 233,047 8,974 233,521 A18+0,800 8,612 233,641 C 8,500 233,530 2,000 5,000 233,460 5,000 -2,500 233,310 233,585 233,435 0,150 C 5,000 -2,500 233,310 5,000 233,460 2,000 8,500 233,530 8,828 233,858 A19+0,800 8,709 234,084 A 8,500 234,223 2,000 5,000 234,153 5,000 -2,500 234,003 233,960 234,128 -0,168 A 5,000 -2,500 234,003 5,000 234,153 2,000 8,500 234,223 8,840 234,563 A20+0,800 8,596 234,489 A 8,500 234,553 2,000 5,000 234,483 5,000 -2,500 234,333 234,271 234,458 -0,187 A 5,000 -2,500 234,333 5,000 234,483 2,000 8,500 234,553 9,140 235,193 A21+0,802 8,913 234,275 A 8,500 234,550 2,000 5,000 234,480 5,000 -2,500 234,330 234,162 234,455 -0,293 A 5,000 -2,500 234,330 5,000 234,480 2,000 8,500 234,550 8,695 234,745 A22+0,804 9,188 234,024 A 8,500 234,483 2,000 5,000 234,413 5,000 -2,500 234,263 233,902 234,388 -0,486 A 5,000 -2,500 234,263 5,000 234,413 2,000 8,500 234,483 8,632 234,615 A23+0,806 9,017 234,070 A 8,500 234,415 2,000 5,000 234,345 5,000 -2,500 234,195 233,921 234,320 -0,399 A 5,000 -2,500 234,195 5,000 234,345 2,000 8,500 234,415 8,563 234,373 C24+0,709 8,933 234,059 A 8,500 234,348 2,000 5,000 234,278 5,000 -2,500 234,128 234,089 234,253 -0,164 A 5,000 -2,500 234,128 5,000 234,278 2,000 8,500 234,348 8,711 234,559 A24+10,213 9,656 233,545 A 8,500 234,316 2,000 5,000 234,246 5,000 -2,500 234,096 234,283 234,221 0,062 C 5,000 -2,500 234,096 5,000 234,246 2,000 8,500 234,316 8,734 234,550 A25+0,766 9,007 233,943 A 8,500 234,281 2,000 5,000 234,211 5,000 -2,500 234,061 234,214 234,186 0,028 C 5,000 -2,500 234,061 5,000 234,211 2,000 8,500 234,281 9,171 234,952 A26+0,723 8,550 234,180 A 8,500 234,213 2,000 5,000 234,143 5,000 -2,500 233,993 234,138 234,118 0,020 C 5,000 -2,500 233,993 5,000 234,143 2,000 8,500 234,213 9,518 235,231 A27+0,730 8,504 234,054 C 8,500 234,050 2,000 5,000 233,980 5,000 -2,500 233,830 233,907 233,955 -0,048 A 5,000 -2,500 233,830 5,000 233,980 2,000 8,500 234,050 9,296 234,846 A28+0,746 8,660 233,297 A 8,500 233,404 2,000 5,000 233,334 5,000 -2,500 233,184 233,401 233,309 0,092 C 5,000 -2,500 233,184 5,000 233,334 2,000 8,500 233,404 9,068 233,972 A29+0,746 8,949 232,688 C 8,500 232,239 2,000 5,000 232,169 5,000 -2,500 232,019 232,107 232,144 -0,037 A 5,000 -2,500 232,019 5,000 232,169 2,000 8,500 232,239 8,773 232,512 A30+0,746 8,561 230,826 A 8,500 230,866 2,000 5,000 230,796 5,000 -2,500 230,646 230,587 230,771 -0,184 A 5,000 -2,500 230,646 5,000 230,796 2,000 8,500 230,866 8,660 231,026 A31+0,747 8,845 229,294 A 8,500 229,524 2,000 5,000 229,454 5,000 -2,500 229,304 229,401 229,429 -0,028 A 5,000 -2,500 229,304 5,000 229,454 2,000 8,500 229,524 8,617 229,641 A31+8,747 8,773 228,896 A 8,500 229,078 2,000 5,000 229,008 5,000 -2,500 228,858 228,973 228,983 -0,010 A 5,000 -2,500 228,858 5,000 229,008 2,000 8,500 229,078 8,596 229,014 C32+0,747 8,788 228,351 A 8,500 228,543 2,000 5,000 228,473 5,000 -2,500 228,323 228,433 228,448 -0,015 A 5,000 -2,500 228,323 5,000 228,473 2,000 8,500 228,543 8,569 228,497 C33+0,747 9,512 227,335 A 8,500 228,010 2,000 5,000 227,940 5,000 -2,500 227,790 227,910 227,915 -0,005 A 5,000 -2,500 227,790 5,000 227,940 2,000 8,500 228,010 9,013 228,523 A34+0,747 10,418 226,474 A 8,500 227,753 2,000 5,000 227,683 5,000 -2,500 227,533 227,590 227,658 -0,068 A 5,000 -2,500 227,533 5,000 227,683 2,000 8,500 227,753 8,884 228,137 A35+0,747 8,810 227,294 A 8,500 227,501 2,000 5,000 227,431 5,000 -2,500 227,281 227,379 227,406 -0,027 A 5,000 -2,500 227,281 5,000 227,431 2,000 8,500 227,501 8,923 227,924 A36+0,747 9,150 226,958 A 8,500 227,391 2,000 5,000 227,321 5,000 -2,500 227,171 227,280 227,296 -0,016 A 5,000 -2,500 227,171 5,000 227,321 2,000 8,500 227,391 8,690 227,581 A37+0,747 8,776 227,582 A 8,500 227,766 2,000 5,000 227,696 5,000 -2,500 227,546 227,545 227,671 -0,126 A 5,000 -2,500 227,546 5,000 227,696 2,000 8,500 227,766 8,543 227,737 C37+16,780 8,538 228,464 C 8,500 228,426 2,000 5,000 228,356 5,000 -2,500 228,206 228,331 228,331 --- C 5,000 -2,500 228,206 5,000 228,356 2,000 8,500 228,426 8,714 228,283 C

Page 44: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

NOTAS DE SERVIÇO DE PAVIMENTAÇÃORUA GENERAL OSÓRIO

ESTACALADO ESQUERDO EIXO LADO DIREITO

OFF-SET PASSEIO PLATAFORMA COTAS PLATAFORMA PASSEIO OFF-SETDIST. COTA TIPO DIST. COTA INC (%) DIST. COTA DIST. SE (%) COTA TERRENO GREIDE DIF. TIPO DIST. SE (%) COTA DIST. COTA INC (%) DIST. COTA DIST. COTA TIPO

00 11,177 228,767 A 10,500 229,218 2,000 7,500 229,158 7,500 -2,500 229,008 229,070 229,195 -0,125 A 7,500 -2,500 229,008 7,500 229,158 2,000 10,500 229,218 10,555 229,273 A

0+9,164 11,646 230,303 C 10,500 229,158 2,000 7,500 229,098 7,500 -2,500 228,948 229,904 229,135 0,769 C 7,500 -2,500 228,948 7,500 229,098 2,000 10,500 229,158 10,679 229,336 A0+16,861 10,891 230,098 C 10,500 229,708 2,000 7,500 229,648 7,500 -2,500 229,498 230,320 229,685 0,635 C 7,500 -2,500 229,498 7,500 229,648 2,000 10,500 229,708 10,732 229,939 A1+16,862 10,568 231,222 C 10,500 231,155 2,000 7,500 231,095 7,500 -2,500 230,945 231,193 231,132 0,061 C 7,500 -2,500 230,945 7,500 231,095 2,000 10,500 231,155 10,707 231,016 C

Page 45: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

NOTAS DE SERVIÇO DE PAVIMENTAÇÃORUA 11 DE JUNHO

ESTACALADO ESQUERDO EIXO LADO DIREITO

OFF-SET PASSEIO PLATAFORMA COTAS PLATAFORMA PASSEIO OFF-SETDIST. COTA TIPO DIST. COTA INC (%) DIST. COTA DIST. SE (%) COTA TERRENO GREIDE DIF. TIPO DIST. SE (%) COTA DIST. COTA INC (%) DIST. COTA DIST. COTA TIPO

00+15,381 9,329 227,874 A 8,500 228,426 2,000 5,000 228,356 5,000 -2,500 228,206 228,331 228,331 --- C 5,000 -2,500 228,206 5,000 228,356 2,000 8,500 228,426 --- --- A0+19,126 9,524 227,649 A 8,500 228,332 2,000 5,000 228,262 5,000 -2,500 228,112 228,306 228,237 0,069 C 5,000 -2,500 228,112 5,000 228,262 2,000 8,500 228,332 8,930 228,762 A1+19,128 --- --- C 8,500 228,334 2,000 5,000 228,264 5,000 -2,500 228,114 228,215 228,239 -0,024 A 5,000 -2,500 228,114 5,000 228,264 2,000 8,500 228,334 8,818 228,652 A2+19,129 8,775 228,364 A 8,500 228,547 2,000 5,000 228,477 5,000 -2,500 228,327 228,396 228,452 -0,056 A 5,000 -2,500 228,327 5,000 228,477 2,000 8,500 228,547 9,016 229,063 A3+19,131 9,736 228,442 A 8,500 229,266 2,000 5,000 229,196 5,000 -2,500 229,046 229,075 229,171 -0,096 A 5,000 -2,500 229,046 5,000 229,196 2,000 8,500 229,266 8,912 229,678 A4+1,257 --- --- C 8,500 229,321 2,000 5,000 229,251 5,000 -2,500 229,101 --- 229,226 --- C 5,000 -2,500 229,101 5,000 229,251 2,000 8,500 229,321 9,075 229,896 A4+18,811 9,449 228,967 A 8,500 229,599 2,000 5,000 229,529 5,000 -2,500 229,379 229,407 229,504 -0,097 A 5,000 -2,500 229,379 5,000 229,529 2,000 8,185 229,593 8,500 229,908 A5+15,957 9,898 229,253 A 8,500 230,185 2,000 5,000 230,115 5,000 -2,500 229,965 230,090 230,090 --- C 5,000 -2,500 229,965 5,000 230,115 2,000 6,617 230,147 8,500 232,031 A

Page 46: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

NOTAS DE SERVIÇO DE PAVIMENTAÇÃORUA AKSAKOF DE VILHENA

ESTACALADO ESQUERDO EIXO LADO DIREITO

OFF-SET PASSEIO PLATAFORMA COTAS PLATAFORMA PASSEIO OFF-SETDIST. COTA TIPO DIST. COTA INC (%) DIST. COTA DIST. SE (%) COTA TERRENO GREIDE DIF. TIPO DIST. SE (%) COTA DIST. COTA INC (%) DIST. COTA DIST. COTA TIPO

00+9,500 8,022 239,950 A 8,000 239,965 2,000 5,000 239,905 5,000 -2,500 239,755 239,880 239,880 --- C 5,000 -2,500 239,755 5,000 239,905 2,000 8,000 239,965 8,276 239,781 C

1 8,199 239,678 A 8,000 239,811 2,000 5,000 239,751 5,000 -2,500 239,601 239,737 239,726 0,011 C 5,000 -2,500 239,601 5,000 239,751 2,000 8,000 239,811 8,367 239,567 C2 8,244 239,929 C 8,000 239,685 2,000 5,000 239,625 5,000 -2,500 239,475 239,572 239,600 -0,028 A 5,000 -2,500 239,475 5,000 239,625 2,000 7,135 239,668 7,708 240,240 -3 8,225 239,783 C 8,000 239,558 2,000 5,000 239,498 5,000 -2,500 239,348 239,413 239,473 -0,060 A 5,000 -2,500 239,348 5,000 239,498 2,000 8,000 239,558 8,308 239,866 A4 8,298 239,233 A 8,000 239,432 2,000 5,000 239,372 5,000 -2,500 239,222 239,266 239,347 -0,081 A 5,000 -2,500 239,222 5,000 239,372 2,000 7,728 239,427 7,886 239,321 C

4+1,700 8,199 239,289 A 8,000 239,421 2,000 5,000 239,361 5,000 -2,500 239,211 239,249 239,336 -0,087 A 5,000 -2,500 239,211 5,000 239,361 2,000 8,000 239,421 8,394 239,158 C5 8,329 239,087 A 8,000 239,306 2,000 5,000 239,246 5,000 -2,500 239,096 239,056 239,221 -0,165 A 5,000 -2,500 239,096 5,000 239,246 2,000 8,000 239,306 8,083 239,250 C6 8,321 238,981 A 8,000 239,195 2,000 5,000 239,135 5,000 -2,500 238,985 239,023 239,110 -0,087 A 5,000 -2,500 238,985 5,000 239,135 2,000 8,000 239,195 8,116 239,118 C7 8,569 238,818 A 8,000 239,197 2,000 5,000 239,137 5,000 -2,500 238,987 238,972 239,112 -0,140 A 5,000 -2,500 238,987 5,000 239,137 2,000 7,629 239,190 --- --- A

7+2,700 8,541 238,848 A 8,000 239,208 2,000 5,000 239,148 5,000 -2,500 238,998 238,968 239,123 -0,155 A 5,000 -2,500 238,998 5,000 239,148 2,000 7,514 239,198 7,610 239,294 A8 8,231 239,177 A 8,000 239,331 2,000 5,000 239,271 5,000 -2,500 239,121 239,138 239,246 -0,108 A 5,000 -2,500 239,121 5,000 239,271 2,000 8,000 239,331 8,215 239,546 A

8+1,985 8,000 239,127 A 7,673 239,344 2,000 5,000 239,291 5,000 -2,500 239,141 --- 239,266 --- C 5,000 -2,500 239,141 5,000 239,291 2,000 8,000 239,351 8,079 239,298 C9+5,222 8,000 238,985 A 7,572 239,269 2,000 5,000 239,218 5,000 -2,500 239,068 239,193 239,193 --- C 5,000 -2,500 239,068 5,000 239,218 2,000 8,000 239,278 8,191 239,151 C

10+13,259 --- --- C 8,000 238,586 2,000 5,000 238,526 5,000 -2,500 238,376 238,501 238,501 --- C 5,000 -2,500 238,376 5,000 238,526 2,000 8,000 238,586 --- --- A

Page 47: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

6 – SEÇÕES TIPO

Page 48: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide
Page 49: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide
Page 50: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide
Page 51: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide
Page 52: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide
Page 53: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

7 – QUANTITATIVOS• SINALIZAÇÃO

• GEOMÉTRICO• DRENAGEM

Page 54: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

GOVERNO DO ESTADO DO RIO GRANDE DO SUL

PREFEITURA MUNICIPAL DE BAGÉ

TRECHO: Rua Aksakof de VilhenaEXTENSÃO:213 mCONVITE Nº:008/2008

Código Descrição Unidade Quantitativos

1.0 TERRAPLENAGEM1.1 Regularização do Sub-leito 2.109,141.2 Escavação Mecânica em Terra (Mat. 1ª Cat ) 757,541.3 Compactação manual (aterro passeios) 149,77

1.4 594,34

1.5 Transp com carga e descarga até 2Km em Cam Tomb m³xkm 607,77

2.0 PAVIMENTAÇÃO2.1 Base de Brita Graduada 669,232.2 Limpeza de pista 3.261,202.3 Imprimação com CM-30, inclusiva material asfáltico 2.099,292.4 Aquisição de CM-30 ton 2,522.5 Pintura de ligação com RR-IC, inclusive material asfáltico 2.099,292.6 Aquisição de RR-1C ton 1,472.7 Pavimentação asfaltica (via) - 5cm - capeamento 2.006,062.8 Aquisição de CAP 50/70 ton 14,44

3.0 DRENAGEM3.1 472,163.2 375,043.3 m 64,003.4 m 118,003.5 Boca de Lobo BLS01 10,003.6 Poço de Visita - PVI 02 6,003.7 Metro adicional de PVI 02 m 2,053.8 42,203.9 Chaminé dos poços de visita (na pista) - CPV 02 (H=1,50m) 3,00

3.10 Escoramento m² 134,923.14 97,12

4.0 SINALIZAÇÃO4.1 SINALIZAÇÃO HORIZONTAL

4.1.1 Pintura faixa - tinta base acrílica p/ 2 anos m² 6,85 4.1.2 m² 131,95 4.2 SINALIZAÇÃO VERTICAL - TODA REFLETIVA

4.2.1 m² 3,13 4.3 SINALIZAÇÃO VERTICAL - SEMI-REFLETIVA

4.3.1 m² 4,59 4.5 DIVERSOS

4.5.1 Suporte Metálico c/ Implantação D=3" 12,00 4.5.2 Caiação m² 367,60

5.0 OBRAS COMPLEMENTARES5.1 Meio-fio de concreto MFC-05 m 342,515.3 869,75

5.10 Remoção de meio fio existente m 123,72

m2

m3

m3

Reforço do subleito c/rachão (c/transp. e remoção de solo mole) m3

m3

m2

m2

m2

m2

Esc. Mec. de Valas Mat. 1ª Cat. DMT ≤ 50 m m3

Reaterro e Compactação m3

Tubulação Dren. Urbana D=0,30 S/BerçoTubulação Dren. Urbana D=0,60 S/Berço

unid.unid.

Enrocamento de pedra arrumada m3

unid.

Transp com carga e descarga até 2Km em Cam Tomb m³xkm

Pintura setas e zebrado - tinta b.acrílica -2 anos

Forn. e implantação placa sinaliz. tot.refletiva (sem suporte)

Forn. e implantação placa sinaliz. semi-refletiva (sem suporte)

unid.

Passeio Novo (Concreto Reguado) m2

Page 55: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

GOVERNO DO ESTADO DO RIO GRANDE DO SUL

TRECHO:EXTENSÃO:455 mCONVITE Nº:008/2008

Código Descrição Unidade Quantitativos

1.0 TERRAPLENAGEM1.1 Regularização do Sub-leito 5.353,851.2 1.461,72

1.3 11,92

1.4 Compactação manual (aterro passeios) 423,341.5 1.026,46

2.0 PAVIMENTAÇÃO2.1 Base de Brita Graduada 1.311,692.2 Limpeza de pista 8.367,102.3 5.353,852.4 Aquisição de CM-30 6,422.5 Pintura de ligação com RR-IC, inclusive material asfáltico 5.353,852.6 Aquisição de RR-1C 3,752.7 5.143,532.8 Aquisição de CAP 50/70 ton 37,03

3.0 DRENAGEM3.1 Esc. Mec. de Valas Mat. 1ª Cat. DMT ≤ 50 m 923,543.2 Reaterro e Compactação 672,323.3 Tubulação Dren. Urbana D=0,30 S/Berço m 183,003.4 Tubulação Dren. Urbana D=0,40 S/Berço m 341,003.5 Tubulação Dren. Urbana D=0,50 S/Berço m 63,003.6 Tubulação Dren. Urbana D=0,60 S/Berço m 21,003.7 Boca de Lobo BLS01 unid. 31,003.8 Poço de Visita - PVI 01 unid. 13,003.9 Poço de Visita - PVI 02 unid. 5,003.10 Metro adicional de PVI 01 m 1,743.14 Enrocamento de pedra arrumada 121,723.15 Chaminé dos poços de visita (na pista) - CPV 02 (H=1,50m) unid. 5,003.16 Concreto Armado p/ poços de visita e bocas-de-lobo 20mPa 16,873.17 Confecção e lanç. de concreto magro em betoneira (radier) 4,883.18 Transp com carga e descarga até 2Km em Cam Tomb m³xkm 251,22

4.0 SINALIZAÇÃO4.1 SINALIZAÇÃO HORIZONTAL

4.1.1 Pintura faixa - tinta base acrílica p/ 2 anos m² 16,06 4.1.2 Pintura setas e zebrado - tinta b.acrílica -2 anos m² 198,16 4.2 SINALIZAÇÃO VERTICAL - TODA REFLETIVA

4.2.1 Forn. e implantação placa sinaliz. tot.refletiva (sem suporte) m² 5,74 4.3 SINALIZAÇÃO VERTICAL - SEMI-REFLETIVA

4.3.1 Forn. e implantação placa sinaliz. semi-refletiva (sem suporte) m² 12,23 4.5 DIVERSOS

4.5.2 Suporte Metálico c/ Implantação D=3" unid. 27,00 4.5.3 Caiação m² 803,07

5.0 OBRAS COMPLEMENTARES5.1 Meio-fio de concreto MFC-05 m 674,155.3 Passeio Novo (Concreto Reguado) 2.621,535.4 Remoçao de árvores D=0,15 a 0,30 m unid. 1,00

PREFEITURA MUNICIPAL DE BAGÉ

Rua Walter Dias da Costa

m2

Escavação Mecânica em Terra (Mat. 1ª Cat ) m3

Compactação de aterro a 100% Proctor Normal (aterro pista c/ solo local) m3

m3

Transp com carga e descarga até 2Km em Cam Tomb m³xkm

m3

m2

Imprimação com CM-30, inclusiva material asfáltico m2

tonm2

tonPavimentação asfaltica (via) - 5cm - capeamento m2

m3

m3

m3

m3

m3

m2

Page 56: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

GOVERNO DO ESTADO DO RIO GRANDE DO SUL

TRECHO: Rua Orvandil Alves LucasEXTENSÃO:757 mCONVITE Nº:008/2008

Código Descrição Unidade Quantitativos

1.0 TERRAPLENAGEM1.1 Regularização do Sub-leito 8.636,481.2 Escavação Mecânica em Terra (Mat. 1ª Cat ) 3.614,26

1.3 35,32

1.4 Compactação manual (aterro passeios) 812,50

1.5 605,31

1.6 Transp com carga e descarga até 2Km em Cam Tomb m³xkm 2.766,45

2.0 PAVIMENTAÇÃO2.1 Base de Brita Graduada 2.280,062.2 Limpeza de pista 14.215,852.3 Imprimação com CM-30, inclusiva material asfáltico 8.586,012.4 Aquisição de CM-30 ton 10,302.5 Pintura de ligação com RR-IC, inclusive material asfáltico 8.586,012.6 Aquisição de RR-1C ton 6,012.7 Pavimentação asfaltica (via) - 5cm - capeamento 8.233,532.8 Aquisição de CAP 50/70 ton 59,28

3.0 DRENAGEM3.1 Esc. Mec. de Valas Mat. 1ª Cat. DMT ≤ 50 m 1.391,803.2 Reaterro e Compactação 1.075,943.3 Tubulação Dren. Urbana D=0,30 S/Berço m 160,003.4 Tubulação Dren. Urbana D=0,40 S/Berço m 398,003.5 Tubulação Dren. Urbana D=0,50 S/Berço m 86,003.6 Tubulação Dren. Urbana D=0,60 S/Berço m 45,003.7 Tubulação Dren. Urbana D=1,20 S/Berço m 17,003.8 Boca de Lobo BLS01 unid. 37,003.9 Poço de Visita - PVI 01 unid. 13,00

3.10 Poço de Visita - PVI 02 unid. 7,003.14 Poço de Visita - PVI 05 unid. 1,003.15 Metro adicional de PVI 01 m 4,343.16 Metro adicional de PVI 02 m 2,183.17 Metro adicional de PVI 05 m 0,703.18 Enrocamento de pedra arrumada 148,223.19 Chaminé dos poços de visita (na pista) - CPV 02 (H=1,50m) unid. 3,003.20 Concreto Armado p/ poços de visita e bocas-de-lobo 20mPa 3,423.21 Escoramento m² 281,103.22 Confecção e lanç. de concreto magro em betoneira (radier) 3,913.23 Transp com carga e descarga até 2Km em Cam Tomb m³xkm 315,86

4.0 SINALIZAÇÃO4.1 SINALIZAÇÃO HORIZONTAL

4.1.1 Pintura faixa - tinta base acrílica p/ 2 anos m² 25,05 4.1.2 Pintura setas e zebrado - tinta b.acrílica -2 anos m² 271,84 4.2 SINALIZAÇÃO VERTICAL - TODA REFLETIVA

4.2.1 Forn. e implantação placa sinaliz. tot.refletiva (sem suporte) m² 6,26 4.3 SINALIZAÇÃO VERTICAL - SEMI-REFLETIVA

4.3.1 Forn. e implantação placa sinaliz. semi-refletiva (sem suporte) m² 21,40 4.4 DIVERSOS

4.4.1 Suporte Metálico c/ Implantação D=3" unid. 40,00 4.4.2 Caiação m² 1.339,49

5.0 OBRAS COMPLEMENTARES5.1 Meio-fio de concreto MFC-05 m 1.444,555.3 Passeio Novo (Concreto Reguado) 4.674,575.4 Remoçao de árvores D=0,15 a 0,30 m unid. 2,00

PREFEITURA MUNICIPAL DE BAGÉ

m2

m3

Compactação de aterro a 100% Proctor Normal (aterro pista c/ solo local) m3

m3

Reforço do subleito c/rachão (c/transp. e remoção de solo mole) m3

m3

m2

m2

m2

m2

m3

m3

m3

m3

m3

m2

Page 57: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

GOVERNO DO ESTADO DO RIO GRANDE DO SUL

TRECHO: Rua 11 de JunhoEXTENSÃO:116 mCONVITE Nº:008/2008

Código Descrição Unidade Quantitativos

1.0 TERRAPLENAGEM1.1 Regularização do Sub-leito 1.472,381.2 Escavação Mecânica em Terra (Mat. 1ª Cat ) 985,81

1.3 0,06

1.4 Compactação manual (aterro passeios) 168,611.5 Transp com carga e descarga até 2Km em Cam Tomb m³xkm 817,14

2.0 PAVIMENTAÇÃO2.1 Base de Brita Graduada 360,732.2 Limpeza de pista 2.267,862.3 Imprimação com CM-30, inclusiva material asfáltico 1.472,382.4 Aquisição de CM-30 ton 1,772.5 Pintura de ligação com RR-IC, inclusive material asfáltico 1.472,382.6 Aquisição de RR-1C ton 1,032.7 Pavimentação asfaltica (via) - 5cm - capeamento 1.419,012.8 Aquisição de CAP 50/70 ton 10,22

3.0 DRENAGEM3.1 Esc. Mec. de Valas Mat. 1ª Cat. DMT ≤ 50 m 58,503.2 Reaterro e Compactação 49,303.3 Tubulação Dren. Urbana D=0,30 S/Berço m 32,003.4 Boca de Lobo BLS01 unid. 5,003.5 Enrocamento de pedra arrumada 5,763.6 Transp com carga e descarga até 2Km em Cam Tomb m³xkm 9,20

4.0 SINALIZAÇÃO4.1 SINALIZAÇÃO HORIZONTAL

4.1.1 Pintura faixa - tinta base acrílica p/ 2 anos m² 2,05 4.1.2 Pintura setas e zebrado - tinta b.acrílica -2 anos m² 46,05 4.2 SINALIZAÇÃO VERTICAL - TODA REFLETIVA

4.2.1 Forn. e implantação placa sinaliz. tot.refletiva (sem suporte) m² 1,04 4.3 SINALIZAÇÃO VERTICAL - SEMI-REFLETIVA

4.3.1 Forn. e implantação placa sinaliz. semi-refletiva (sem suporte) m² 4,59 4.5 DIVERSOS

4.4.1 Suporte Metálico c/ Implantação D=3" unid. 8,00 4.4.2 Caiação m² 317,55

5.0 OBRAS COMPLEMENTARES5.1 Meio-fio de concreto MFC-05 m 211,865.2 Passeio Novo (Concreto Reguado) 696,505.3 Remanejamento de postes de madeira unid. 1,005.4 Remoção de meio fio existente m 519,895.5 Arrancamento e remoção de paralelepípedos 462,41

PREFEITURA MUNICIPAL DE BAGÉ

m2

m3

Compactação de aterro a 100% Proctor Normal (aterro pista c/ solo local) m3

m3

m3

m2

m2

m2

m2

m3

m3

m3

m2

m2

Page 58: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

GOVERNO DO ESTADO DO RIO GRANDE DO SUL

TRECHO: Ruas Aksakof de Vilhena, Wlater Dias da Costa, Orvandil Alves Lucas e 11 de Junho.EXTENSÃO:1,6 kmCONVITE Nº:008/2008

Código Descrição Unidade Quantitativos

1.0 TERRAPLENAGEM1.1 Regularização do Sub-leito 17.571,851.2 Escavação Mecânica em Terra (Mat. 1ª Cat ) 6.819,33

1.3 47,30

1.4 Compactação manual (aterro passeios) 1.554,22

1.5 1.199,65

1.6 Transp com carga e descarga até 2Km em Cam Tomb m³xkm 5.217,82

SUB-TOTAL >>>>>

2.0 PAVIMENTAÇÃO2.1 Base de Brita Graduada 4.621,722.2 Limpeza de pista 28.112,012.3 Imprimação com CM-30, inclusiva material asfáltico 17.511,532.4 Aquisição de CM-30 ton 21,012.5 Pintura de ligação com RR-IC, inclusive material asfáltico 17.511,532.6 Aquisição de RR-1C ton 12,262.7 Pavimentação asfaltica (via) - 5cm - capeamento 16.802,132.8 Aquisição de CAP 50/70 ton 120,98

SUB-TOTAL >>>>>

3.0 DRENAGEM3.1 Esc. Mec. de Valas Mat. 1ª Cat. DMT ≤ 50 m 2.846,003.2 2.172,603.3 m 439,003.4 m 739,003.5 m 149,003.6 m 184,003.7 m 17,003.8 Boca de Lobo BLS01 83,003.9 Poço de Visita - PVI 01 26,00

3.10 Poço de Visita - PVI 02 18,003.14 Poço de Visita - PVI 05 1,003.15 Metro adicional de PVI 01 m 6,083.16 Metro adicional de PVI 02 m 4,233.17 Metro adicional de PVI 05 m 0,703.18 317,903.19 Chaminé dos poços de visita (na pista) - CPV 02 (H=1,50m) 11,003.20 Concreto Armado p/ poços de visita e bocas-de-lobo 20mPa 20,293.21 Escoramento m² 416,023.22 8,793.23 673,40

SUB-TOTAL >>>>>

4.0 SINALIZAÇÃO4.1 SINALIZAÇÃO HORIZONTAL

4.1.1 Pintura faixa - tinta base acrílica p/ 2 anos m² 50,00 4.1.2 m² 648,00 4.2 SINALIZAÇÃO VERTICAL - TODA REFLETIVA

4.2.1 m² 16,18 4.3 SINALIZAÇÃO VERTICAL - SEMI-REFLETIVA

4.3.1 m² 42,80 4.4 DIVERSOS

4.4.1 Suporte Metálico c/ Implantação D=3" 87,00 4.4.2 Caiação m² 2.827,71

SUB-TOTAL >>>>>

5.0 OBRAS COMPLEMENTARES5.1 Meio-fio de concreto MFC-05 m 2.673,075.2 Passeio Novo (Concreto Reguado) 8.862,345.3 Remoçao de árvores D=0,15 a 0,30 m unid. 3,005.4 Remanejamento de postes de madeira unid. 1,005.5 Remoção de meio fio existente m 643,625.6 Arrancamento e remoção de paralelepípedos 462,41

PREFEITURA MUNICIPAL DE BAGÉ

m2

m3

Compactação de aterro a 100% Proctor Normal (aterro pista c/ solo local) m3

m3

Reforço do subleito c/rachão (c/transp. e remoção de solo mole) m3

m3

m2

m2

m2

m2

m3

Reaterro e Compactação m3

Tubulação Dren. Urbana D=0,30 S/BerçoTubulação Dren. Urbana D=0,40 S/BerçoTubulação Dren. Urbana D=0,50 S/BerçoTubulação Dren. Urbana D=0,60 S/BerçoTubulação Dren. Urbana D=1,20 S/Berço

unid.unid.unid.unid.

Enrocamento de pedra arrumada m3

unid.m3

Confecção e lanç. de concreto magro em betoneira (radier) m3

Transp com carga e descarga até 2Km em Cam Tomb m³xkm

Pintura setas e zebrado - tinta b.acrílica -2 anos

Forn. e implantação placa sinaliz. tot.refletiva (sem suporte)

Forn. e implantação placa sinaliz. semi-refletiva (sem suporte)

unid.

m2

m2

Page 59: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

Quantitativos de Sinalização

DISCRIMINAÇÃO UNIDDMT(km)

QUANT.

SINALIZAÇÃO

Sinalização Horizontal

Sinalização horizontal - Tinta acrílica m2 50Sinalização horizontal - Áreas especiais m2 648

Sinalização Vertical - Toda Refletiva

Placa octogonal - L=0,33m unid. 26Placa circular - D=0,80 m unid. 5

Sinalização Vertical. Semi-Refletiva

Placa retangular - 0,60x1,00mPlaca retangular - 0,80x1,00m

unid.unid.

1046

Diversos

Suporte metálico c/ implantação D=3”Pintura meio-fio (caiado branco)

unid.m2

872827,71

- Foram considerados 5% de acréscimo na sinalização horizontal

Page 60: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

QUANTITATIVOS SINALIZAÇÃO HORIZONTAL E CONDUÇÃO ÓTICA

1.PINTURA DE LINHAS TRACEJADAS CAD.: 1,00x3,00 BRANCO REFLETIVO - L= 0,10 m EXTENSÃO (m) = 1.292,00 32,30

2.PINTURA DE LINHAS CONTÍNUAS AMARELO REFLETIVO NO EIXO - L= 0,12m EXTENSÃO (m) = 130,00 15,60

3.PINTURA DE ÁREAS ESPECIAIS 617,25

SÍMBOLO RETENÇÃO

2,73 2,70 0,86

1 26 12

2,73 70,20 534,00 10,32

4.PINTUA DE MEIO-FIO - CAL BRANCO EXTENSÃO (m) = 14138,55 2827,71

TOTAL (m2) =

TOTAL (m2) =

TOTAL (m2) =

ÁREA UNITÁRIA (m2)

QUANTITADE (unid.)

ÁREA TOTAL (m2)

TOTAL (m2) =

FAIXA DE SEGURANÇA

Page 61: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide
Page 62: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide
Page 63: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide
Page 64: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide
Page 65: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide
Page 66: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide
Page 67: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

- O aterro passeio destina-se ao aterro para regularização dos passeios e será feito com solo local.- Na região de solos moles, o aterro pista será executado j

PLANILHA DE VOLUMESRUA AKSAKOF DE VILHENA

ESTACAÁREA (m²) VOLUME (m³)

CORTE ATERRO PASSEIO ATERRO PISTA CORTE

0 - - - - - - NÃO0+9,500 3,639 0,544 0,000 9,50 17,285 2,583 - NÃO

1,000 3,185 1,043 0,000 10,50 35,824 8,331 0,000 NÃO2,000 4,651 0,059 0,000 20,00 78,359 11,023 0,000 NÃO3,000 11,142 0,016 0,000 20,00 157,934 0,748 0,000 55,0174,000 9,793 1,135 0,000 20,00 209,351 11,501 0,000 110,034

4+1,700 9,773 1,361 0,000 1,70 16,631 2,121 0,000 9,3535,000 8,821 1,477 0,000 18,30 170,140 25,969 0,000 100,6816,000 9,758 0,846 0,000 20,00 185,788 23,231 0,000 110,0347,000 9,120 1,375 0,000 20,00 188,778 22,215 0,000 110,034

7+2,700 9,213 1,219 0,000 2,70 24,750 3,503 0,000 14,8558,000 9,202 1,118 0,000 17,30 159,291 20,217 0,000 95,179

9+5,222 3,409 0,991 0,000 19,83 125,030 20,915 0,000 NÃOTOTAL 1.351,88 149,77 0,00 605,19

OBS.: O VOLUME DE CORTE INCLUI O VOLUME DE ESCAVAÇÃO DO REFORÇO DO SUBLEITO (RACHÃO).

DISTÂNCIA (m) ATERRO

PASSEIOATERRO

PISTAREFORÇO DO

SUBLEITO (RACHÃO)

Page 68: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

- O aterro passeio destina-se ao aterro para regularização dos passeios e será feito com solo local.- Na região de solos moles, o aterro pista será executado j

PLANILHA DE VOLUMESRUA WALTER DIAS DA COSTA

ESTACAÁREA (m²) VOLUME (m³)

CORTE ATERRO PASSEIO ATERRO PISTA CORTE

0 - - - - - -0+16,564 8,325 - - 16,56 68,946 0,000 0,0001+5,180 9,286 0,215 0,000 8,61 75,848 0,924 0,0001+17,566 7,100 0,000 0,000 12,39 101,473 1,328 0,0002+17,566 6,307 0,000 0,000 20,00 134,068 0,000 0,0003+17,566 8,034 0,052 0,000 20,00 143,411 0,516 0,0004+13,060 1,885 1,450 0,000 15,49 76,837 11,634 0,0004+17,566 5,324 0,000 0,000 4,51 16,242 3,267 0,0005+17,566 3,057 0,933 0,000 20,00 83,812 9,332 0,0006+17,566 2,125 1,693 0,000 20,00 51,822 26,265 0,0007+12,564 2,512 1,839 0,000 15,00 34,778 26,489 0,0007+17,567 2,601 2,306 0,000 5,00 12,790 10,368 0,0008+17,567 2,237 0,493 0,000 20,03 48,451 28,030 0,0009+17,567 1,079 1,201 0,000 20,00 33,160 16,938 0,000

10+17,568 1,176 1,386 0,000 20,01 22,559 25,877 0,00011+17,565 3,634 1,000 0,000 20,00 48,090 23,849 0,00012+2,564 4,069 0,628 0,000 5,00 19,254 4,067 0,000

12+17,565 2,916 0,426 0,000 15,00 52,395 7,905 0,00013+17,565 2,159 1,102 0,000 20,00 50,753 15,283 0,00014+17,565 0,839 1,618 0,244 20,00 29,982 27,197 2,43715+17,565 3,891 1,742 0,000 20,00 47,303 33,599 2,43715+19,464 4,600 1,638 0,000 1,90 8,062 3,210 0,00016+17,565 2,442 0,918 0,017 8,10 28,524 10,353 0,06717+17,565 2,933 1,243 0,000 20,00 53,745 21,611 0,16518+17,565 4,915 0,370 0,000 20,00 78,477 16,126 0,00019+17,565 3,332 0,911 0,082 20,00 82,471 12,807 0,82020+17,565 0,814 2,213 0,181 20,00 41,463 31,244 2,62522+14,927 3,755 0,737 0,000 37,36 85,353 55,118 3,372

TOTAL 1.461,12 423,34 11,92

DISTÂNCIA (m) ATERRO

PASSEIOATERRO

PISTA

Page 69: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

- O aterro passeio destina-se ao aterro para regularização dos passeios e será feito com solo local.- Na região de solos moles, o aterro pista será executado j

PLANILHA DE VOLUMESRUA ORVANDIL ALVES LUCAS

ESTACAÁREA (m²) VOLUME (m³)

CORTE ATERRO PASSEIO ATERRO PISTA CORTE

0 1,601 5,099 0,415 0,00 0,000 0,000 0,000 NÃO0+0,808 5,690 4,248 0,246 0,81 2,946 3,776 0,267 NÃO1+0,809 6,056 1,304 0,000 20,01 117,524 55,544 2,461 NÃO2+0,809 10,387 0,017 0,752 20,00 164,430 13,210 7,523 NÃO3+0,809 2,291 5,171 0,711 20,00 126,779 51,877 14,629 NÃO4+0,810 6,362 1,496 0,000 20,01 86,571 66,698 7,110 NÃO5+0,810 3,439 1,289 0,000 20,00 98,000 27,845 0,000 NÃO6+0,810 3,226 1,627 0,000 20,00 66,648 29,156 0,000 NÃO7+0,810 4,307 0,000 0,000 20,00 75,337 16,268 0,000 NÃO8+0,811 6,552 0,514 0,000 20,01 108,645 5,143 0,000 NÃO9+0,811 5,578 0,077 0,000 20,00 121,298 5,905 0,000 NÃO10+0,812 2,293 0,996 0,072 20,01 78,750 10,728 0,723 NÃO10+13,000 5,758 0,489 0,000 12,19 49,063 9,048 0,441 NÃO11+0,800 7,407 0,085 0,000 7,80 51,342 2,239 0,000 NÃO12+0,800 7,149 0,000 0,000 20,00 145,550 0,851 0,000 NÃO13+0,800 3,908 1,706 0,000 20,00 110,564 17,057 0,000 NÃO14+0,800 3,749 1,454 0,000 20,00 76,566 31,599 0,000 NÃO15+0,800 4,389 0,086 0,000 20,00 81,370 15,403 0,000 NÃO16+0,800 5,049 0,055 0,000 20,00 94,371 1,415 0,000 NÃO17+0,800 5,890 0,290 0,000 20,00 109,381 3,452 0,000 NÃO17+10,800 6,793 0,865 0,000 10,00 63,418 5,775 0,000 NÃO18+0,800 7,613 0,000 0,000 10,00 72,033 4,325 0,000 NÃO19+0,800 4,548 0,566 0,000 20,00 121,613 5,655 0,000 NÃO20+0,800 10,879 0,485 0,000 20,00 154,270 10,507 0,000 55,01721+0,802 8,811 1,250 0,000 20,02 197,097 17,372 0,000 110,14422+0,804 5,766 2,632 0,000 20,02 145,920 38,860 0,000 110,14723+0,806 5,787 3,387 0,000 20,02 115,647 60,250 0,000 110,15024+0,709 9,748 1,948 0,000 19,90 154,598 53,095 0,000 109,50324+10,213 12,220 2,123 0,000 9,50 104,392 19,348 0,000 52,28825+0,766 12,308 0,573 0,000 10,55 129,421 14,226 0,000 58,05926+0,723 7,466 0,068 0,000 19,96 197,317 6,396 0,000 NÃO27+0,730 4,963 0,000 0,008 20,07 124,719 0,684 0,078 NÃO28+0,746 7,877 0,300 0,000 20,16 129,422 3,023 0,079 NÃO29+0,746 5,422 0,000 0,000 20,00 132,992 2,999 0,000 NÃO30+0,746 2,297 0,535 0,000 20,00 77,192 5,354 0,000 NÃO31+0,747 3,281 0,737 0,000 20,01 55,812 12,730 0,000 NÃO31+8,747 3,531 0,747 0,000 8,00 27,250 5,938 0,000 NÃO32+0,747 2,985 0,959 0,000 20,00 65,156 17,063 0,000 NÃO33+0,747 4,656 1,516 0,000 20,00 76,404 24,753 0,000 NÃO34+0,747 3,468 2,208 0,001 20,00 81,241 37,248 0,012 NÃO35+0,747 3,584 1,002 0,000 20,00 70,523 32,101 0,012 NÃO36+0,747 3,281 1,870 0,007 20,00 68,646 28,718 0,069 NÃO37+0,747 1,497 0,942 0,102 20,00 47,776 28,123 1,093 NÃO37+16,780 4,057 0,397 0,000 16,03 44,523 10,737 0,821 NÃO

TOTAL 4.219,57 812,497 35,317 605,31

OBS.: O VOLUME DE CORTE INCLUI O VOLUME DE ESCAVAÇÃO DO REFORÇO DO SUBLEITO (RACHÃO).

DISTÂNCIA (m) ATERRO

PASSEIOATERRO

PISTAREFORÇO DO

SUBLEITO

Page 70: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

- O aterro passeio destina-se ao aterro para regularização dos passeios e será feito com solo local.- Na região de solos moles, o aterro pista será executado j

PLANILHA DE VOLUMESRUA 11 DE JUNHO

RUA 11 DE JUNHO

ESTACAÁREA (m²) VOLUME (m³)

CORTE ATERRO PASEIO ATERRO PISTA CORTE

0 0,000 0,000 0,000 - - -0+19,126 5,318 2,100 0,000 19,13 50,852 20,083 0,0001+19,128 4,583 0,148 0,000 20,02 99,105 22,498 0,0002+19,129 4,773 0,619 0,000 20,01 93,610 7,671 0,0003+19,131 3,854 1,756 0,000 20,02 86,363 23,778 0,0004+18,811 3,303 2,317 0,006 19,68 70,433 40,080 0,0565+15,957 11,018 2,999 0,000 17,15 122,775 45,571 0,000

SUBTOTAL 523,14 159,68 0,06

RUA GENERAL OSÓRIO

ESTACAÁREA (m²) VOLUME (m³)

CORTE ATERRO PASSEIO ATERRO PISTA CORTE

0 0,000 0,000 0,000 0,00 - - -0+9,164 22,374 0,000 0,000 9,16 102,517 0,000 0,000

0+16,861 16,148 0,000 0,000 7,70 148,252 0,000 0,0001+16,862 5,032 0,892 0,000 20,01 211,903 8,925 0,000

SUBTOTAL 462,67 8,93 0,00

TOTAL 985,81 168,61 0,06

DISTÂNCIA (m) ATERRO

PASSEIOATERRO

PISTA

DISTÂNCIA (m) ATERRO

PASSEIOATERRO

PISTA

Page 71: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

PLANILHA DE QUANTIDADES PLANILHA DE QUANTIDADESObra: PI: Obra: Ruas Aksakof de Vilhena, Walter Dias da Costa, Orvandil Alves Lucas e 11 de JunhoTrecho: Trecho: Entre a Av Espanha e a Avenida General OsórioCidade: Data: Março 2008 Cidade: Bagé – RS

PV NºTipo Cotas Altura 1 Altura 2 Trecho Diâmetro Envelope Altura Espessura Altura de h Largura Largura Escavação Escavação Volume Envelope Envelope Remoção Volume Remoção Escora- PV Altura Metro PV Altura Metro PV Altura Metro DN 30 DN 40 DN 50 DN 60 DN 80 DN 100 DN 120 DN 150

Resumo QuantidadesA;B;C Fundo 1 Fundo 2 Tampa (PV/ mento Média de Tubo Escavação Vala mento Adicional Total Parcial por DN Tubos mento Tipo A Tipo B Tipo C(m) (m) (m) (m) (m) BL-PV) L (m) (0/1) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)

PV 1 B 238,440 238,440 239,640 1,200 1,200 PV1 PV2 44,00 60 0 0,00 1,430 0,060 1,490 0,20 1,30 11,440 0,000 0,000 11,440 96,668 0,347 0,000 0,000 0,407 17,915 29,355 67,313 0,000 0 0,000 0,000 1 1,200 0,000 0 0,000 0,000 0,00 0,00 0,00 44,00 0,00 0,00 0,00 0,00PV 2 B 237,690 237,690 239,350 1,660 1,660 PV2 PV3 10,00 60 0 0,00 1,715 0,060 1,775 0,20 1,30 2,600 0,000 0,000 7,580 30,655 0,347 0,000 0,000 0,407 4,072 6,672 23,983 16,600 0 0,000 0,000 1 1,660 0,160 0 0,000 0,000 0,00 0,00 0,00 10,00 0,00 0,00 0,00 0,00 2394,51PV 3 B 237,520 237,520 239,290 1,770 1,770 PV3 PV4 26,00 60 0 0,00 1,915 0,060 1,975 0,20 1,30 6,760 0,000 0,000 20,566 87,321 0,347 0,000 0,000 0,407 10,586 17,346 69,975 46,020 0 0,000 0,000 1 1,770 0,270 0 0,000 0,000 0,00 0,00 0,00 26,00 0,00 0,00 0,00 0,00 317,90PV 4 B 237,080 237,080 239,140 2,060 2,060 PV4 PV5 25,00 60 0 0,00 2,260 0,060 2,320 0,20 1,30 6,500 0,000 0,000 21,950 97,350 0,347 0,000 0,000 0,407 10,179 16,679 80,671 51,500 0 0,000 0,000 1 2,060 0,560 0 0,000 0,000 0,00 0,00 0,00 25,00 0,00 0,00 0,00 0,00 8,79PV 5 B 236,650 236,650 239,110 2,460 2,460 PV5 1 2,460 0,960 451,49

2846,00PV 6 B 237,510 237,510 239,110 1,600 1,600 PV6 PV5 13,00 60 0 0,00 1,925 0,060 1,985 0,20 1,30 3,380 0,000 0,000 9,620 43,167 0,347 0,000 0,000 0,407 5,293 8,673 34,494 20,800 0 0,000 0,000 1 1,600 0,100 0 0,000 0,000 0,00 0,00 0,00 13,00 0,00 0,00 0,00 0,00 20,29PV 5 B 236,860 236,650 239,110 2,250 2,460 PV5 673,41

2172,59PV 7 A 238,060 238,060 239,070 1,010 1,010 PV7 PV8 40,00 40 0 0,00 1,005 0,040 1,045 0,20 1,00 8,000 0,000 0,000 8,000 49,800 0,213 0,000 0,000 0,181 7,238 15,238 34,562 0,000 1 1,010 0,010 0 0,000 0,000 0 0,000 0,000 0,00 40,00 0,00 0,00 0,00 0,00 0,00 0,00 416,02PV 8 A 236,660 236,660 237,660 1,000 1,000 PV8 PV9 40,00 40 0 0,00 1,000 0,040 1,040 0,20 1,00 8,000 0,000 0,000 8,000 49,600 0,213 0,000 0,000 0,181 7,238 15,238 34,362 0,000 1 1,000 0,000 0 0,000 0,000 0 0,000 0,000 0,00 40,00 0,00 0,00 0,00 0,00 0,00 0,00 PV Tipo A 26PV 9 A 234,260 234,260 235,260 1,000 1,000 PV9 PV10 34,00 40 0 0,00 1,040 0,040 1,080 0,20 1,00 6,800 0,000 0,000 6,800 43,520 0,213 0,000 0,000 0,181 6,152 12,952 30,568 0,000 1 1,000 0,000 0 0,000 0,000 0 0,000 0,000 0,00 34,00 0,00 0,00 0,00 0,00 0,00 0,00 PV Tipo B 18PV 10 A 233,510 233,510 234,590 1,080 1,080 PV10 PV Tipo C 1

6,080PV 11 A 233,670 233,670 234,510 0,840 0,840 PV11 PV10 15,00 40 1 0,00 0,960 0,040 1,000 0,20 1,00 3,000 0,680 1,020 4,020 19,020 0,213 0,000 3,202 0,181 2,714 9,936 9,084 0,000 1 0,840 0,000 0 0,000 0,000 0 0,000 0,000 0,00 15,00 0,00 0,00 0,00 0,00 0,00 0,00 4,230PV 10 A 233,510 233,510 234,590 1,080 1,080 PV10 PV12 13,00 40 1 0,00 1,225 0,040 1,265 0,20 1,00 2,600 0,680 0,884 3,484 19,929 0,213 0,000 2,775 0,181 2,352 8,611 11,318 0,000 1 1,080 0,080 0 0,000 0,000 0 0,000 0,000 0,00 13,00 0,00 0,00 0,00 0,00 0,00 0,00 0,700PV 12 A 233,220 233,220 234,590 1,370 1,370 PV12 1 1,370 0,370 DN 30 (m) 439,00

DN 40 (m) 739,00PV 13 A 233,260 233,260 234,260 1,000 1,000 PV13 PV14 36,00 40 0 0,00 1,220 0,040 1,260 0,20 1,00 7,200 0,000 0,000 7,200 52,560 0,213 0,000 0,000 0,181 6,514 13,714 38,846 0,000 1 1,000 0,000 0 0,000 0,000 0 0,000 0,000 0,00 36,00 0,00 0,00 0,00 0,00 0,00 0,00 DN 50 (m) 149,00PV 14 A 232,580 232,580 234,020 1,440 1,440 PV14 PV16 24,00 40 0 0,00 1,420 0,040 1,460 0,20 1,00 4,800 0,000 0,000 4,800 39,840 0,213 0,000 0,000 0,181 4,343 9,143 30,697 0,000 1 1,440 0,440 0 0,000 0,000 0 0,000 0,000 0,00 24,00 0,00 0,00 0,00 0,00 0,00 0,00 DN 60 (m) 184,00PV 16 A 232,120 232,020 233,520 1,400 1,500 PV16 DN 80 (m) 0,00

DN 100 (m) 0,00PV 15 A 232,600 232,600 234,000 1,400 1,400 PV15 PV16 12,00 40 0 0,00 1,400 0,040 1,440 0,20 1,00 2,400 0,000 0,000 2,400 19,680 0,213 0,000 0,000 0,181 2,171 4,571 15,109 0,000 1 1,400 0,400 0 0,000 0,000 0 0,000 0,000 0,00 12,00 0,00 0,00 0,00 0,00 0,00 0,00 DN 120 (m) 17,00PV 16 B 232,120 232,020 233,520 1,400 1,500 PV16 PV17 50,00 50 0 0,00 1,100 0,050 1,150 0,20 1,20 12,000 0,000 0,000 12,000 81,000 0,277 0,000 0,000 0,283 14,137 26,137 54,863 0,000 0 0,000 0,000 1 1,500 0,000 0 0,000 0,000 0,00 0,00 50,00 0,00 0,00 0,00 0,00 0,00 DN 150 (m) 0,00PV 17 B 231,070 231,070 231,770 0,700 0,700 PV17 PV18 13,00 50 1 0,00 0,645 0,050 0,695 0,20 1,20 3,120 0,800 1,040 4,160 15,002 0,277 0,000 3,604 0,283 3,676 11,440 3,562 0,000 0 0,000 0,000 1 0,700 0,000 0 0,000 0,000 0,00 0,00 13,00 0,00 0,00 0,00 0,00 0,00PV 18 B 230,820 230,820 231,410 0,590 0,590 PV18 1 0,590 0,000 83,00

PV 19 A 229,430 229,430 230,430 1,000 1,000 PV19 PV20 32,00 40 0 0,00 1,220 0,040 1,260 0,20 1,00 6,400 0,000 0,000 6,400 46,720 0,213 0,000 0,000 0,181 5,791 12,191 34,529 0,000 1 1,000 0,000 0 0,000 0,000 0 0,000 0,000 0,00 32,00 0,00 0,00 0,00 0,00 0,00 0,00PV 20 A 227,480 227,480 228,920 1,440 1,440 PV20 PV21 32,00 40 0 0,00 1,220 0,040 1,260 0,20 1,00 6,400 0,000 0,000 6,400 46,720 0,213 0,000 0,000 0,181 5,791 12,191 34,529 0,000 1 1,440 0,440 0 0,000 0,000 0 0,000 0,000 0,00 32,00 0,00 0,00 0,00 0,00 0,00 0,00PV 21 A 225,530 225,530 226,530 1,000 1,000 PV21 PV22 33,00 40 0 0,00 0,980 0,040 1,020 0,20 1,00 6,600 0,000 0,000 6,600 40,260 0,213 0,000 0,000 0,181 5,972 12,572 27,688 0,000 1 1,000 0,000 0 0,000 0,000 0 0,000 0,000 0,00 33,00 0,00 0,00 0,00 0,00 0,00 0,00PV 22 A 223,520 223,520 224,480 0,960 0,960 PV22 PV23 30,00 40 0 0,00 0,835 0,040 0,875 0,20 1,00 6,000 0,000 0,000 6,000 32,250 0,213 0,000 0,000 0,181 5,429 11,429 20,821 0,000 1 0,960 0,000 0 0,000 0,000 0 0,000 0,000 0,00 30,00 0,00 0,00 0,00 0,00 0,00 0,00PV 23 B 222,140 221,940 222,850 0,710 0,910 PV23 PV24 21,00 60 1 0,00 1,065 0,060 1,125 0,20 1,30 5,460 0,920 1,932 7,392 38,105 0,347 0,000 7,292 0,407 8,550 23,234 14,870 0,000 0 0,000 0,000 1 0,910 0,000 0 0,000 0,000 0,00 0,00 0,00 21,00 0,00 0,00 0,00 0,00PV 24 B 221,390 221,390 222,610 1,220 1,220 PV24 1 1,220 0,000

PV 25 A 228,770 228,770 229,770 1,000 1,000 PV25 PV26 46,00 40 0 0,00 1,065 0,040 1,105 0,20 1,00 9,200 0,000 0,000 9,200 60,030 0,213 0,000 0,000 0,181 8,324 17,524 42,506 0,000 1 1,000 0,000 0 0,000 0,000 0 0,000 0,000 0,00 46,00 0,00 0,00 0,00 0,00 0,00 0,00PV 26 A 225,270 225,270 226,400 1,130 1,130 PV26 PV26a 46,00 40 0 0,00 1,235 0,040 1,275 0,20 1,00 9,200 0,000 0,000 9,200 67,850 0,213 0,000 0,000 0,181 8,324 17,524 50,326 0,000 1 1,130 0,130 0 0,000 0,000 0 0,000 0,000 0,00 46,00 0,00 0,00 0,00 0,00 0,00 0,00PV 26a C 221,770 220,910 223,110 1,340 2,200 PV26a PVE1 17,00 120 0 0,00 2,225 0,130 2,355 0,20 2,20 7,480 1,660 2,822 17,982 106,059 0,915 0,000 0,000 1,674 28,461 38,763 67,296 25,599 0 0,000 0,000 0 0,000 0,000 1 2,200 0,700 0,00 0,00 0,00 0,00 0,00 0,00 17,00 0,00PV E1 C 220,570 220,570 222,820 2,250 2,250 PVE1

PV 27 A 229,480 229,480 230,480 1,000 1,000 PV27 PV28 42,00 40 0 0,00 1,180 0,040 1,220 0,20 1,00 8,400 0,000 0,000 8,400 59,640 0,213 0,000 0,000 0,181 7,600 16,000 43,640 0,000 1 1,000 0,000 0 0,000 0,000 0 0,000 0,000 0,00 42,00 0,00 0,00 0,00 0,00 0,00 0,00PV 28 A 228,140 228,140 229,500 1,360 1,360 PV28 PV29 15,00 40 0 0,00 1,530 0,040 1,570 0,20 1,00 3,000 0,000 0,000 3,000 26,550 0,213 0,000 0,000 0,181 2,714 5,714 20,836 0,000 1 1,360 0,360 0 0,000 0,000 0 0,000 0,000 0,00 15,00 0,00 0,00 0,00 0,00 0,00 0,00PV 29 A 227,660 227,040 229,360 1,700 2,320 PV29

PV 30 A 232,000 232,000 233,400 1,400 1,400 PV30 PV31 20,00 40 0 0,00 1,385 0,040 1,425 0,20 1,00 4,000 0,000 0,000 4,000 32,500 0,213 0,000 0,000 0,181 3,619 7,619 24,881 0,000 1 1,400 0,400 0 0,000 0,000 0 0,000 0,000 0,00 20,00 0,00 0,00 0,00 0,00 0,00 0,00PV 31 B 230,960 230,860 232,330 1,370 1,470 PV31 PV32 30,00 50 0 0,00 1,280 0,050 1,330 0,20 1,20 7,200 0,000 0,000 7,200 55,080 0,277 0,000 0,000 0,283 8,482 15,682 39,398 0,000 0 0,000 0,000 1 1,470 0,000 0 0,000 0,000 0,00 0,00 30,00 0,00 0,00 0,00 0,00 0,00PV 32 B 229,300 229,200 230,390 1,090 1,190 PV32 PV33 30,00 60 0 0,00 1,385 0,060 1,445 0,20 1,30 7,800 0,000 0,000 7,800 64,155 0,347 0,000 0,000 0,407 12,215 20,015 44,140 0,000 0 0,000 0,000 1 1,190 0,000 0 0,000 0,000 0,00 0,00 0,00 30,00 0,00 0,00 0,00 0,00PV 33 B 227,760 227,760 229,340 1,580 1,580 PV33 PV29 15,00 60 0 0,00 1,950 0,060 2,010 0,20 1,30 3,900 0,000 0,000 11,010 50,205 0,347 0,000 0,000 0,407 6,107 10,007 40,198 23,700 0 0,000 0,000 1 1,580 0,080 0 0,000 0,000 0,00 0,00 0,00 15,00 0,00 0,00 0,00 0,00PV 29 B 227,040 227,040 229,360 2,320 2,320 PV29 1 2,320 0,820

PV 34 A 233,390 233,390 234,390 1,000 1,000 PV34 PV35 40,00 40 0 0,00 1,295 0,040 1,335 0,20 1,00 8,000 0,000 0,000 8,000 61,400 0,213 0,000 0,000 0,181 7,238 15,238 46,162 0,000 1 1,000 0,000 0 0,000 0,000 0 0,000 0,000 0,00 40,00 0,00 0,00 0,00 0,00 0,00 0,00PV 35 A 232,670 232,670 234,260 1,590 1,590 PV35 PV36 20,00 40 0 0,00 1,735 0,040 1,775 0,20 1,00 4,000 0,000 0,000 13,540 49,040 0,213 0,000 0,000 0,181 3,619 7,619 41,421 31,800 1 1,590 0,590 0 0,000 0,000 0 0,000 0,000 0,00 20,00 0,00 0,00 0,00 0,00 0,00 0,00PV 36 A 232,310 232,310 234,190 1,880 1,880 PV36 PV37 40,00 40 0 0,00 2,130 0,040 2,170 0,20 1,00 8,000 0,000 0,000 30,560 117,360 0,213 0,000 0,000 0,181 7,238 15,238 102,122 75,200 1 1,880 0,880 0 0,000 0,000 0 0,000 0,000 0,00 40,00 0,00 0,00 0,00 0,00 0,00 0,00PV 37 A 231,590 231,590 233,970 2,380 2,380 PV37 PV38 40,00 40 0 0,00 1,855 0,040 1,895 0,20 1,00 8,000 0,000 0,000 36,560 112,360 0,213 0,000 0,000 0,181 7,238 15,238 97,122 95,200 1 2,380 1,380 0 0,000 0,000 0 0,000 0,000 0,00 40,00 0,00 0,00 0,00 0,00 0,00 0,00PV 38 A 230,870 230,870 232,200 1,330 1,330 PV38 PV39 33,00 40 0 0,00 1,150 0,040 1,190 0,20 1,00 6,600 0,000 0,000 6,600 45,870 0,213 0,000 0,000 0,181 5,972 12,572 33,298 0,000 1 1,330 0,330 0 0,000 0,000 0 0,000 0,000 0,00 33,00 0,00 0,00 0,00 0,00 0,00 0,00PV 39 A 228,960 228,960 229,930 0,970 0,970 PV39 PV40 16,00 40 1 0,00 1,120 0,040 1,160 0,20 1,00 3,200 0,680 1,088 4,288 22,848 0,213 0,000 3,415 0,181 2,895 10,598 12,250 0,000 1 0,970 0,000 0 0,000 0,000 0 0,000 0,000 0,00 16,00 0,00 0,00 0,00 0,00 0,00 0,00PV 40 A 228,030 228,030 229,300 1,270 1,270 PV40 1 1,270 0,270

PV 41 A 227,690 227,690 228,680 0,990 0,990 PV41 PV42 40,00 40 0 0,00 1,055 0,040 1,095 0,20 1,00 8,000 0,000 0,000 8,000 51,800 0,213 0,000 0,000 0,181 7,238 15,238 36,562 0,000 1 0,990 0,000 0 0,000 0,000 0 0,000 0,000 0,00 40,00 0,00 0,00 0,00 0,00 0,00 0,00PV 42 B 226,610 226,510 227,730 1,120 1,220 PV42 PV43 40,00 50 0 0,00 1,535 0,050 1,585 0,20 1,20 9,600 0,000 0,000 9,600 85,680 0,277 0,000 0,000 0,283 11,310 20,910 64,770 0,000 0 0,000 0,000 1 1,220 0,000 0 0,000 0,000 0,00 0,00 40,00 0,00 0,00 0,00 0,00 0,00PV 43 B 225,430 225,430 227,280 1,850 1,850 PV43 PV44 16,00 50 0 0,00 2,090 0,050 2,140 0,20 1,20 3,840 0,000 0,000 12,720 53,808 0,277 0,000 0,000 0,283 4,524 8,364 45,444 29,600 0 0,000 0,000 1 1,850 0,350 0 0,000 0,000 0,00 0,00 16,00 0,00 0,00 0,00 0,00 0,00PV 44 B 225,000 224,900 227,330 2,330 2,430 PV44 1 2,430 0,930

Travessias de Boca de Lobo (25x) 325,00 30 0 0,00 1,980 0,035 2,015 0,20 0,90 58,500 0,000 0,000 58,500 647,888 0,160 0,000 0,000 0,108 34,944 93,444 554,443 0,000 0 0,000 0,000 0 0,000 0,000 0 0,000 0,000 325,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

Ligações de Bocas de Lobo (57x) 114,00 30 0 0,00 1,000 0,035 1,035 0,20 0,90 20,520 0,000 0,000 20,520 126,711 0,160 0,000 0,000 0,108 12,257 32,777 93,934 0,000 0 0,000 0,000 0 0,000 0,000 0 0,000 0,000 114,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

TOTAL 1528,00 0,00 317,900 8,786 451,492 2845,999 10,523 20,288 326,433 673,407 2172,592 416,019 26 6,080 18 4,230 1 0,700 439,00 739,00 149,00 184,00 0,00 0,00 17,00 0,00

Ruas Aksakof de Vilhena, Walter Dias da Costa, Orvandil Alves Lucas e 11 de JunhoEntre a Av Espanha e a Avenida General Osório Orc.Nº:Bagé – RS

Compri- Compr. de Enroca- Radier ReaterroEnv.Parcial Enrocam. Radier Envel. PV's A adic. A PV's B adic. B PV's C adic. C

(cm) (m3) (m3) (m3) (m3) (m3/m) (m3) (m3/m) (m3) (m3) (m3) (m2)

Escavação Parcial (m3)Enrocamento (m3)Radier (m3)Escavação Adic. (m3)Escavação Total (m3)Envelope Total (m3)Remoção (m3)Reaterro (m3)Escoramento (m2)

Metro Adic. PV Tipo AMetro Adic. PV Tipo BMetro Adic. PV Tipo C

Bocas de Lobo (unid)

Page 72: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide

8 – PLANILHA DE DIMENSIONAMENTO HIDRÁULICO

Page 73: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide
Page 74: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide
Page 75: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide
Page 76: PREFEITURA MUNICIPAL DE PORTO ALEGRE · sumario 1 – projeto horizontal - listagem do estaqueamento - listagem das curvas horizontais 2 – projeto vertical - listagem do greide