45
OPM3 O Médico da sua Empresa © 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., [email protected], (71) 3012.6611 Slide 1 v.1.1 21/10/2009 Manaus – AM - Brasil O Médico da sua Empresa Gerhard J. Tekes, 3PTA PMI certified OPM3 Assessor & Consultant

Presentation about OPM3

Embed Size (px)

DESCRIPTION

Presentation about OPM3, the Project Management Institutes (PMI) model for organizational project management maturity, given by Gerhard Tekes, PMI certified OPM3 Consultant and Director of 3PTA - Project Management at the 1st international Project Management Congress in Manaus-Amazona-Brazil at 21st of October 2009.

Citation preview

Page 1: Presentation about OPM3

OPM3O Médico da sua Empresa

© 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., ���� [email protected], ���� (71) 3012.6611 – Slide 1v.1.1

21/10/2009Manaus – AM - Brasil

O Médico da sua Empresa

Gerhard J. Tekes, 3PTAPMI certified OPM3 Assessor & Consultant

Page 2: Presentation about OPM3

3PTA - Tekes & Associados do Brasil

� Fundada em 1982

� Gerhard Tekes, PMP

� PMI certified OPM3 Assessor and Consultant

� Atuação em 4 continentesEPMDesenvolvimento

Outsourcing

Análise

Integração

Treinamentos (Cursos, Workshops, ToJ)

Serviços, Serviços, Consultoria & AssessoriaConsultoria & Assessoria

PMO BSC EVA OPM Obras e Paradas

PPP ManagementFísico e Financeiro

Controle com EVM / EVA

Geração de Relatórios

OPM3Introdução

Assessment

Priorização

Execução

das melhorias

© 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., ���� [email protected], ���� (71) 3012.6611 – Slide 2

Integração

Implementação

Optimization & Upgrades

Process Re-Design

PessoasPessoas –– ProcessosProcessos –– Projetos Projetos -- TecnologiaTecnologia

Geração de Relatórios

Definição de Processos

Auditoria de Processos

Decision Support

Gerencia de Riscos

Gerencia de Comunicação

das melhorias

Reavaliação

Process Re-Design

Definição de Indicadores

Avaliação de Capabilities

Page 3: Presentation about OPM3

• Porque se preocupar com melhoria de processos

� Alinhamento estratégico da organização

� Os três pilares

� Gerenciamento de Projetos, Programas e Portfólio

� Professional Competency Development Framework

Agenda

© 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., ���� [email protected], ���� (71) 3012.6611 – Slide 3

� Professional Competency Development Framework

� OPM3

• OPM3

� Histórico

� O Modelo

� OPM3 SAM ou ProductSuite Assessment

Page 4: Presentation about OPM3

O PMI (30/06/2009)

� Fundado em 1969

� 306.980 PMI associados (+13%)

� 170 países

� 250+ Capítulos em 70 países

© 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., ���� [email protected], ���� (71) 3012.6611 – Slide 4

� Todas as indústrias presentes

� 30+ grupos de estudos técnicos (SIGs)

� 2 Colleges

� 359,973 Project Management Professionals (PMP®s)

� 8139 Certified Associate in Project Management (CAPM™) (8655 com elegibilidade aprovada)

� 2,8 milhões+ cópias do PMBOK em circulação

Page 5: Presentation about OPM3

Os Métodos

© 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., ���� [email protected], ���� (71) 3012.6611 – Slide 5

Page 6: Presentation about OPM3

© 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., ���� [email protected], ���� (71) 3012.6611 – Slide 6

Page 7: Presentation about OPM3

© 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., ���� [email protected], ���� (71) 3012.6611 – Slide 7

Page 8: Presentation about OPM3

PORQUE PREOCUPAR-SE COM MELHORIA DE PROCESSOS?

© 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., ���� [email protected], ���� (71) 3012.6611 – Slide 8

Page 9: Presentation about OPM3

As novas demandas

52 É a percentagem dos projetos de construçãono Emirados Árabes que foram adiados = US$582Bi

© 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., ���� [email protected], ���� (71) 3012.6611 – Slide 9

32,5 Bilhões de US$ foram investidos pela Petrobras no primeiro semestre

Page 10: Presentation about OPM3

As novas demandas

Mudança de Foco

• Fluxo de Caixa em vez de ROI

• Projetos em apuros são projetos mortos

• Alto riscos para projetos de longa duração

• Controle mais rígida, mais marcos

© 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., ���� [email protected], ���� (71) 3012.6611 – Slide 10

• Controle mais rígida, mais marcos

Tendências

• Hiper Eficiência

• Transparência total

• Alianças

• Demissões

• “Near Sourcing”© PMI-Network, Vol 23, No 6

Cash is King by Bud Baker e 5 Trends by Sarah Fisher

Page 11: Presentation about OPM3

© im

agem: pragm

aS

YS

TE

MS

CO

RP

OR

AT

ION

,

Mudanças

© 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., ���� [email protected], ���� (71) 3012.6611 – Slide 11

Quanto tempo você pode esperar para adequar a Quanto tempo você pode esperar para adequar a

performance da sua empresa ao novo cenário?performance da sua empresa ao novo cenário?

SY

ST

EM

S C

OR

PO

RA

TIO

N, w

ww

.pragmasystem

s.com

Page 12: Presentation about OPM3

E ¾ das Mudanças Organizacionais falham

Inspirado na apresentação Project

Mudanças

© 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., ���� [email protected], ���� (71) 3012.6611 – Slide 12

Inspirado na apresentação Project ofC

hangede P

eter Pfeiffer

Page 13: Presentation about OPM3

O Problema

�“Empresas em todos países perdem bilhões, desperdiçados em projetos”

�“uma dos principais fatores, que causam este desperdício é a grave falta de alinhamento entre os projetos e a

© 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., ���� [email protected], ���� (71) 3012.6611 – Slide 13

é a grave falta de alinhamento entre os projetos e a estratégia organizacional”

Isto é uma conseqüência de:Isto é uma conseqüência de:

Falha de implementar as melhores práticas no Gerenciamento de Projetos

Michael Stanleigh, Ivey Business Journal, March/April 2006

Page 14: Presentation about OPM3

Performance

Vision

Organization Goals

TargetsCulture

Purpose

Identity BHAGs

© 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., ���� [email protected], ���� (71) 3012.6611 – Slide 14

© modelo: Stanford Group(USA)

Organization Goals

Performance

MetricsStructure

OperationsOperations

Investment

Strategy

Implementation

Program Project

Portfolio

Page 15: Presentation about OPM3

TargetsCulture

Purpose

Identity

GoalsOrganization

Vision

BHAGs

Performance é uma função do alinhamento de todos os elementos

© 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., ���� [email protected], ���� (71) 3012.6611 – Slide 15

MetricsStrategyStructure

Portfolio

Program Project

OperationsOperations

Goals

Performance

Investment

Implementation

© modelo: Stanford Group (USA)

OPM3OPM3

Page 16: Presentation about OPM3

Implementation

Investment

Strategy

Portfolio

Ambiente

© 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., ���� [email protected], ���� (71) 3012.6611 – Slide 16

Program Project

Projetos certos

PPPscertos

Seleção

Ambiente Organizacional

Page 17: Presentation about OPM3

QUAL MODELO, PADRÃO OU METODOLOGIA?

© 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., ���� [email protected], ���� (71) 3012.6611 – Slide 17

Page 18: Presentation about OPM3

Alguns dos modelos analisados

Organizational Project Management Maturity Model (OPM3®)© 2005 Project Mananegment Institute, Inc. All rights reserved

Page 19: Presentation about OPM3

OPM3®OPM3Organizational Project ManagementMaturity Model

© 2005 Project Management Institute, Inc. All rights reserved. Not for further distribution without the express permission of PMI. “PMI”, the PMI logo, “PMP,” PMP logos, “Project Management Journal”, “PM Network”, “PMI Today”, OPM3 and “Making Project Management Indispensable for Business Results” are marks of Project Management Institute, Inc. For a comprehensive list of PMI marks. Contact the PMI Legal Department.

Page 20: Presentation about OPM3

O que é Gerenciamento de Projetos Organizacional?

Introdução ao OPM3

Organizational Project Management Maturity Model (OPM3®)© 2005 Project Mananegment Institute, Inc. All rights reserved

“A aplicação de conhecimento, capacidades, ferramentas e técnicas às atividades organizacionais

e de projetos para alcançar os objetivos da organização por meio de projetos.”

OPM3 Knowledge Foundation, p. 5

Page 21: Presentation about OPM3

O nível em que uma

Maturidade organizacional em Gerenciamento de Projetos?

Introdução ao OPM3

Organizational Project Management Maturity Model (OPM3®)© 2005 Project Mananegment Institute, Inc. All rights reserved

pratica

Em...

Page 22: Presentation about OPM3

A Solução – OPM Continuum Towards High-Performance

Organizational Project Management Maturity Model (OPM3®)© 2005 Project Mananegment Institute, Inc. All rights reserved

Page 23: Presentation about OPM3

Elementos do OPM3

Gerenciamento organizacional de projetos, maturidade, Best Practices relevantes

e como usar OPM3

Introdução ao OPM3

Organizational Project Management Maturity Model (OPM3®)© 2005 Project Mananegment Institute, Inc. All rights reserved

Figure 2.1 Elementos do OPM3 Standard

Seqüência de desenvolvimento de Capabilitiesagregando emBest Practices

Métodos deDiagnóstico deBest Practicese Capabilities

Page 24: Presentation about OPM3

OPM3 On-line Interativo– Contém Self-

Assessment(SAM)Livro impresso

Arquitetura física do OPM3Introdução ao OPM3

Organizational Project Management Maturity Model (OPM3®)© 2005 Project Mananegment Institute, Inc. All rights reserved

Livro impresso– OPM3 Knowledge

Foundation

Ferramenta para Diagnósticos baseados em evidencias

Page 25: Presentation about OPM3

Quem pode aplicar OPM3?

Qualquer Organização independente de:

� Industria

Introdução ao OPM3

Organizational Project Management Maturity Model (OPM3®)© 2005 Project Mananegment Institute, Inc. All rights reserved

� Industria

� Tamanho

� Localização geográfica

O mais CEDO possível

Page 26: Presentation about OPM3

Diagnóstico inicial: ProductSuite

Introdução ao OPM3

Webtool ou ProductSuite?

Organizational Project Management Maturity Model (OPM3®)© 2005 Project Mananegment Institute, Inc. All rights reserved

Verificações intermediarias: WebTool

Diagnósticos periódicos: ProductSuite

Page 27: Presentation about OPM3

Best PracticesComponentes do OPM3

Best Practices são uma forma ideal, reconhecida pela industria, de alcançar uma meta ou objetivo.

Capacidades representam passos necessários para um aumento da maturidade de uma Best Practice.

Organizational Project Management Maturity Model (OPM3®)© 2005 Project Mananegment Institute, Inc. All rights reserved

Um Artefato é um resultado tangível ou intangível, demonstrando ou aplicando uma Capacidade

Um Key Performance Indicator (KPI), representa o meio para medir um Resultado

Page 28: Presentation about OPM3

Best PracticesComponentes do OPM3

Organizational Project Management Maturity Model (OPM3®)© 2005 Project Mananegment Institute, Inc. All rights reserved

Figure 3-3: Dependências podem envolver uma seqüência de Capacidades

Page 29: Presentation about OPM3

Best PracticesExemplo de OPM3 Best Practices

Estabelecer Comunidades internas de Gerenciamento de Projetos

Coordenar atividades de Gerenciamento de Projetos

Organizational Project Management Maturity Model (OPM3®)© 2005 Project Mananegment Institute, Inc. All rights reserved

Patrocinar atividades de Gerenciamento de Projetos

Desenvolver consciência de atividades de Gerenciamento de

Projetos

Facilitar atividades de Gerenciamento de Projetos

Page 30: Presentation about OPM3

O Ciclo de Vida OPM3

Diagrama do Ciclo

Organizational Project Management Maturity Model (OPM3®)© 2005 Project Mananegment Institute, Inc. All rights reserved

Page 31: Presentation about OPM3

Wrap-up & Conclusion

Wrap-Up

Organizational Project Management Maturity Model (OPM3®)© 2005 Project Mananegment Institute, Inc. All rights reserved

O Desafio: Alinhar a estratégia organizacional com projetos consistentes, previsíveis e bem sucedidos.Figure ES-1: OPM3 fecha o gap entre a estratégia organizacional e projetos bem sucedidos.

Page 32: Presentation about OPM3

© 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., ���� [email protected], ���� (71) 3012.6611 – Slide 32

Page 33: Presentation about OPM3

O que fazer (e o que não.....)

© 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., ���� [email protected], ���� (71) 3012.6611 – Slide 33

Page 34: Presentation about OPM3

1.) Definição do Escopo

© 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., ���� [email protected], ���� (71) 3012.6611 – Slide 34

Page 35: Presentation about OPM3

2.) Um Diagnóstico (WebTool)

© 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., ���� [email protected], ���� (71) 3012.6611 – Slide 35

Page 36: Presentation about OPM3

2.) Um Diagnóstico (ProductSuite)

© 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., ���� [email protected], ���� (71) 3012.6611 – Slide 36

Page 37: Presentation about OPM3

3.) Planejar as Mudanças

© 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., ���� [email protected], ���� (71) 3012.6611 – Slide 37

Page 38: Presentation about OPM3

Fatores Críticos de Sucesso

A Equipe faz toda a Diferença

© 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., ���� [email protected], ���� (71) 3012.6611 – Slide 38

Page 39: Presentation about OPM3

Pessoas

Resistência,Duvidas,Medo

© 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., ���� [email protected], ���� (71) 3012.6611 – Slide 39

Medo

Inspirado na apresentação Project of Change de Peter Pfeiffer

Page 40: Presentation about OPM3

Grupos

Influencia,Controle,

© 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., ���� [email protected], ���� (71) 3012.6611 – Slide 40

Controle,Poder

Inspirado na apresentação Project of Changede Peter Pfeiffer

Page 41: Presentation about OPM3

© 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., ���� [email protected], ���� (71) 3012.6611 – Slide 41

Page 42: Presentation about OPM3

© 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., ���� [email protected], ���� (71) 3012.6611 – Slide 42

Page 43: Presentation about OPM3

© 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., ���� [email protected], ���� (71) 3012.6611 – Slide 43

Page 44: Presentation about OPM3

© 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., ���� [email protected], ���� (71) 3012.6611 – Slide 44

Page 45: Presentation about OPM3

That's all folksThat's all folksThat's all folksThat's all folks

© 2009 3PTA – Tekes e Associados Serv. Gerenciais Ltda., ���� [email protected], ���� (71) 3012.6611 – Slide 45

That's all folksThat's all folksThat's all folksThat's all folks

Gerhard Tekes, OPM3 Service Provider

Fone: +55-71-3012.6611E-mail: [email protected]: www.3pta.com.brForum: www.3pta.com.br/forum