Formato de anúncio para consulta pública sobre os Termos de Referência propostos para o estudo do DIA dos projetos da Categoria A. REPÚBLICA DEMOCRÁTICA DE TIMOR-LESTE Ministério do Petróleo e Minerais Autoridade Nacional do Petróleo e Minerais (ANPM) Torre do Ministério das Financas pisos 6 e 7 Aitarak Laran, Dili Telefone: 73099995/73099996 Announcement of proposed project Category A Decree Law no.5/2011, Environmental License Law Public Consultation of proposal Term of Reference for study of Environmental impact Timor Resources Oil & Gas Drilling, Covalima 1. Proponent: Timor Resources Pty Ltd (“Timor Resources”) 2. Site of the proposed project: A maximum of Five Sites are proposed within the Covalima District. The exact locations are subject to approval from the Government of Timor Leste and operational considerations. Maps are attached in Annex I. 3. The above-mentioned proponent would like to implement a minimum of drilling one Oil & Gas Well in at least three of the above Sites. Each Well would require a temporary site of approximately one hectare; a longer-term arrangement for a smaller area would be subject to the results of drilling. 4. Timor Resources wishes to construct a drilling pad on the locations as per the description stated above. This may, subject to the final agreed location, require access roads and other temporary sites to accommodate the activities. These other activities may include, but are not restricted to, camps, equipment yards, pipeline rights-of-way, vehicle parking and site offices. The operation will be conducted on a 24 hour / 7 day per week basis and will comply with all regulations as determined by the Government of Timor Leste. The operation will also require the movement of heavy vehicle along the access routes and public roads. The duration of the project at any one site is not expected to exceed 2 months but will be subject to the results of the drilling and operational factors. 5. As per Decree Law no. 5/2011, the proposed project is classified as Category A and must follow an environmental evaluation process, as specified in the Law. 6. The Terms of Reference for this study must be approved by the Environmental Authority prior to the elaboration and submission of the Environmental Impact Statement to the proposed project. 7. The draft Terms of Reference was submitted to the Environmental Authority and is now available for public comment. 8. The draft Terms of Reference is available for viewing in the following address: Autoridade Nacional do Petroleo e Minerais in Health, Safety and Environment (HSE), Autoridade Nacional do Petróleo e Minerais (ANPM), Edifício do Ministério das Finanças, Pisos 6, Apartado 113, Ministry of Finance Tower, Aitarak Laran, Dili. http://www.anpm.tl/category/public-consultation/ Edificio Municipal Ministério do Petroleo and Minerais, Suai, Covalima. Timor Resources Office (Dili) located at CBD#3, Suite#303, Timor Plaza, Comoro- Dili Timor Resources Office (Suai) located at Avenida De Hilario, Madeira, Suco Camanassa, Aldeia

REPÚBLICA DEMOCRÁTICA DE TIMOR-LESTE Ministério do ...timorresources.com.au/wp-content/uploads/2019/09/... · Gomes at Autoridade Nacional do Petróleo e Minerais, Torre do Ministério

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: REPÚBLICA DEMOCRÁTICA DE TIMOR-LESTE Ministério do ...timorresources.com.au/wp-content/uploads/2019/09/... · Gomes at Autoridade Nacional do Petróleo e Minerais, Torre do Ministério

Formato de anúncio para consulta pública sobre os Termos de Referência propostos para o estudo do DIA dos projetos da Categoria A.

REPÚBLICA DEMOCRÁTICA DE TIMOR-LESTE

Ministério do Petróleo e Minerais

Autoridade Nacional do Petróleo e Minerais (ANPM)

Torre do Ministério das Financas pisos 6 e 7 – Aitarak Laran, Dili

Telefone: 73099995/73099996

Announcement of proposed project Category A

Decree Law no.5/2011, Environmental License Law

Public Consultation of proposal Term of Reference for study of Environmental impact

Timor Resources Oil & Gas Drilling, Covalima

1. Proponent: Timor Resources Pty Ltd (“Timor Resources”)

2. Site of the proposed project: A maximum of Five Sites are proposed within the Covalima District. The exact

locations are subject to approval from the Government of Timor Leste and operational considerations.

Maps are attached in Annex I.

3. The above-mentioned proponent would like to implement a minimum of drilling one Oil & Gas Well in at least

three of the above Sites. Each Well would require a temporary site of approximately one hectare; a longer-term

arrangement for a smaller area would be subject to the results of drilling.

4. Timor Resources wishes to construct a drilling pad on the locations as per the description stated above. This

may, subject to the final agreed location, require access roads and other temporary sites to accommodate

the activities. These other activities may include, but are not restricted to, camps, equipment yards, pipeline

rights-of-way, vehicle parking and site offices. The operation will be conducted on a 24 hour / 7 day per

week basis and will comply with all regulations as determined by the Government of Timor Leste. The

operation will also require the movement of heavy vehicle along the access routes and public roads. The

duration of the project at any one site is not expected to exceed 2 months but will be subject to the results of

the drilling and operational factors.

5. As per Decree Law no. 5/2011, the proposed project is classified as Category A and must follow an environmental

evaluation process, as specified in the Law.

6. The Terms of Reference for this study must be approved by the Environmental Authority prior to the elaboration

and submission of the Environmental Impact Statement to the proposed project.

7. The draft Terms of Reference was submitted to the Environmental Authority and is now available for public

comment.

8. The draft Terms of Reference is available for viewing in the following address:

• Autoridade Nacional do Petroleo e Minerais in Health, Safety and Environment (HSE), Autoridade

Nacional do Petróleo e Minerais (ANPM), Edifício do Ministério das Finanças, Pisos 6, Apartado 113,

Ministry of Finance Tower, Aitarak Laran, Dili.

• http://www.anpm.tl/category/public-consultation/

• Edificio Municipal Ministério do Petroleo and Minerais, Suai, Covalima.

• Timor Resources Office (Dili) located at CBD#3, Suite#303, Timor Plaza, Comoro- Dili

• Timor Resources Office (Suai) located at Avenida De Hilario, Madeira, Suco Camanassa, Aldeia

Page 2: REPÚBLICA DEMOCRÁTICA DE TIMOR-LESTE Ministério do ...timorresources.com.au/wp-content/uploads/2019/09/... · Gomes at Autoridade Nacional do Petróleo e Minerais, Torre do Ministério

Ailok Laran

9. The draft Terms of Reference is available for viewing during normal working hours.

10. Any member of the public has the right to comment on the draft Terms of Reference.

11. Any comments on the draft Terms of Reference must be submitted in writing to Mr. Jose Sarmento or Mrs. Isaura

Gomes at Autoridade Nacional do Petróleo e Minerais, Torre do Ministério das Financas Pisos 6 e 7 Aitarak

Laran, Dili Timor-Leste, P.O. Box 113. It can also be sent via email to [email protected] or

[email protected].

12. All the comments must be received by the Environmental Authority on 2 October 2019.

Timor Resources

GM Exploration

Sr. Jan Hulse

12 September 2019

Page 3: REPÚBLICA DEMOCRÁTICA DE TIMOR-LESTE Ministério do ...timorresources.com.au/wp-content/uploads/2019/09/... · Gomes at Autoridade Nacional do Petróleo e Minerais, Torre do Ministério

ANNEX I

SITE LOCATION MAPS

1. “KARAU”, Covalima, Suai-Kota, Matai / Debos / Camanassa

9.309139S 125.252415E 9.292621S 125.267432E 9.305551S 125.284976E 9.323975S 125.270291E

Page 4: REPÚBLICA DEMOCRÁTICA DE TIMOR-LESTE Ministério do ...timorresources.com.au/wp-content/uploads/2019/09/... · Gomes at Autoridade Nacional do Petróleo e Minerais, Torre do Ministério

2. “KUMBILI”, Covalima, Suai-Kota, Camanassa

9.296694S 125.301915E 9.296509S 125.330410E 9.314087S 125.330526E 9.314272S 125.302030E

Page 5: REPÚBLICA DEMOCRÁTICA DE TIMOR-LESTE Ministério do ...timorresources.com.au/wp-content/uploads/2019/09/... · Gomes at Autoridade Nacional do Petróleo e Minerais, Torre do Ministério

3. “LAFAEK”, Covalima, Suai-Kota, Labarai

9.281827S 125.283457E 9.281674S 125.307348E 9.296658S 125.307446E 9.296812S 125.283554E

Page 6: REPÚBLICA DEMOCRÁTICA DE TIMOR-LESTE Ministério do ...timorresources.com.au/wp-content/uploads/2019/09/... · Gomes at Autoridade Nacional do Petróleo e Minerais, Torre do Ministério

4. “RAIKETAN”, Covalima, Suai-Kota, Labarai / Belekasac / Holbelis

9.250795S 125.291299E 9.250527S 125.332790E 9.274675S 125.332949E 9.274943S 125.291455E

Page 7: REPÚBLICA DEMOCRÁTICA DE TIMOR-LESTE Ministério do ...timorresources.com.au/wp-content/uploads/2019/09/... · Gomes at Autoridade Nacional do Petróleo e Minerais, Torre do Ministério

5. “LAISAPI”, Covalima, Mape, Beko Ii / Raimea

9.205871S 125.424527E 9.205566S 125.469383E 9.243755S 125.469649E 9.244061S 125.424788E