ABB Brazil JCM A-1 Power Products Division Power Transformers © ABB Group 14 de abril de 2015 | Slide 1 ABB Brasil Power Products Division Dr. José Carlos Mendes Gte Tecnologia Transmissão e Produtos de Potência Gte Desenvolvimento & Engenharia Engenheiro Corporativo Executivo Global ABB Asea Brown Boveri Divisão de Produtos de Potência Transformadores de Potência São Paulo, SP - Brasil email: [email protected] tel: + 55 11 2464 8410 cel: + 55 11 9 8354 5358 + 55 11 9 8112 7575 SANTIAGO CL Jornadas Técnicas 2015 2015Abr14&15 Power Transformers: Life Cycle and Operational Cost Optimization – Conventional, Wind and Solar Applications

Transformer Life Cycle Power Transformers

  • Upload
    others

  • View
    13

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-1Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 1

ABB BrasilPower Products Division

Dr. José Carlos MendesGte Tecnologia Transmissão e Produtos de PotênciaGte Desenvolvimento & EngenhariaEngenheiro Corporativo Executivo Global

ABB Asea Brown BoveriDivisão de Produtos de PotênciaTransformadores de PotênciaSão Paulo, SP - Brasil

email: [email protected]: + 55 11 2464 8410cel: + 55 11 9 8354 5358

+ 55 11 9 8112 7575

SANTIAGO CLJornadas Técnicas 2015

2015Abr14&15

Power Transformers:Life Cycle and Operational Cost Optimization –

Conventional, Wind and Solar Applications

Page 2: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-2Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 2

Guarulhos, São Paulo - BR

ABB BrazilPower Products Division

Power Transformers

Blumenau, SC - BR

n PPTR Power Transformersl power transformers up to 765kVl shunt reactors up to 765kVl heavy current industrial transformersl service (Eng Solution, Factory and Site Repairs,

Monitoring Systems, TrServices)l insulation componentsl transformer components (Bushings, Tap

Changers, etc)n PPMV Medium Voltage, PPHV High Voltage

PPTR Distribution Transformers

ABB Brasil Power Products DivisionPower and Distribution Transformers

Page 3: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-3Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 3

ContentContent

Content

q introductionq renewables energy

§ solar and wind power generation§ transformers applications and needs§ useful life and maintenance

q life cycle optimization§ from specification to end of life§ design optimization§ selection of alternatives§ loss evaluation to efficient transformers§ advanced technologies

q performance, reliability and failure modesq advanced minimum maintenance

§ optimized monitoring§ knowledge, condition and event based§ minimum periodic inspection

q advanced asset managementq conclusions

ContextRenewables Energy and Transformers Optimization

Page 4: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-4Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 4

Renewables Energy and Transformers ApplicationsSolar and Wind Power Generation – Trends and Transformers Needs

Page 5: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-5Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 5

ContextRenewables Energy – Solar Power

Vision by 2035 - SolarEnergy Supply from Chile

ChileRenewables Central Strategy§ 2018 - reduce electricity price§ 2014 - solar and wind up to 20% in tenders for regulated clients§ 400MW solar PV generation under contruction

Cerro Dominador 110MWCSP Concentrated Solar Power Plant

Atacama DesertPV Solar Power Plant

Page 6: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-6Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 6

ContextRenewables Energy – Wind Power

El Arrayán 115MWWind Park 50x2.3MW, 0.69/35kV-220kV

ChileRenewables Central Strategy§ 2018 - reduce electricity price§ 2014 - solar and wind up to 20% in tenders for regulated clients§ 836MW wind installed capacity (~500MW in 2014)

Page 7: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-7Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 7

Solar and Wind Power PlantsPower Transformers Applications

CollectorTransformer

InverterTransformer

InverterTransformer

ConnectionTransformer

CollectorTransformer

InverterTransformer

InverterTransformer

PV DCGenerator

PV DCGenerator

PV DCGenerator

PV DCGenerator

Connection, GSUTransformer

ConnectionTransformer

WTGTransformer

CollectorTransformer

CollectorTransformer

WTGTransformer

WTGTransformer

WTGTransformer

Wind Farms

Solar CSP

Solar PV

WTG Technologies

Page 8: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-8Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 8

Power TransformersSolar and Wind Power Applications

Wind Farm – Daily Variation of Load Current, Voltage, Power Factor

Wind Farm Collector Substation - Load Current, Voltage and Power Factor

Current, Arms Voltage, pu power factor, pu

Page 9: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-9Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 9

Wind Farm – Steady State Voltage Load Flow

Us LF IL UHVc ULVc Ulim

pu % pu pu pu pu

1.00 54 0.28 1.035 1.044 1.091

1.05 54 0,28 1.086 1.095 1.091

1.00 100 0.52 1.038 1.052 1.070

1.05 100 0.52 1.089 1.100 1.070

TL69-1

Connection SSBUS 230 kV

G

Collector SSBUS 69 kV

WTGBUS 690 V

Wind Farm 2

Wind Farm 3

Wind Farm 4

Wind Farm 5

US

TL69-2

CapacitorBank

TL230 - 1

TL230 - 2

TL230 - 3

TL230 - 4

TL230 - 5

TL230 - 6

CapacitorBank

Connection SSBUS 69 kV

Collector SSBUS 34.5 kV

UChv

UClv

IL , LF = load factor

Wind Farm 1

Ulim

ConnectionTransformer

CollectorTransformer

WTGTransformer

WTGBUS 690 V

Power TransformersSolar and Wind Power Applications

Page 10: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-10Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 10

Wind Farm - Voltage Control and Transformers Taps Adjustments

back-feedingno-load

SIN BR 230kV SIN – CEAS1 69kV COLLECTOR 34.5kV WTG DFIG 0.690kV

1 – 70.725 kV2 – 69.000 kV3 – 67.275 kV4 – 65.550 kV5 – 63.825 kV

1 – 36.225 kV2 – 35.363 kV3 – 34.500 kV4 – 33.638 kV5 – 32.775 kV

0.690kV34.500kV

Nhvc Nlvc Nhvg Nlvg

UgUgUcUcULUs Us UL

Uc =NhvgNlvg

× UgUL = NhvcNlvc

× Uc

UL =NhvcNlvc

×NhvgNlvg

× Ug

UL = NlvL

NhvL× Us

NhvL NlvL

operationinductive PF

US = NhvcNlvc

× NhvgNlvg

× UgNhvL

NlvL×

US = × ULNhvL

NlvL

P ± jQ

Power System WIND FARM 300MW – Electrical System

complete analysis requires Load Flow and Harmonic Load Flow for loading conditions

50.2GVA 1.5GVA9.8GVA

Power TransformersSolar and Wind Power Applications

Page 11: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-11Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 11

Renewables Energy and Transformers ApplicationsLife Cycle – From Specification to End of Life

Page 12: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-12Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 12

Power TransformersLife Cycle Optimization

Transformer Life Cycle

Page 13: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-13Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 13

Specification, Design, Manufacturing, Tests, Transportation, Receiving,Storage, Installation, Operation, Monitoring, Maintenance, End of Life

Transformer Life Cycle

Power TransformersLife Cycle Optimization

Page 14: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-14Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 14

Renewables Energy and Transformers ApplicationsLife Cycle – Design Optimization

Page 15: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-15Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 15

Transformer§ core§ windings§ insulation§ connection§ tank§ expansion tank§ accessoriesØ bushingsØ tap-changersØ radiatorsØ motor-fansØ thermometers, level indicators, Buchholz

relay, pressure relief valve, pressure relay,air breathers, etc

Ø bushing current transformers BCTsØ surge arrestersØ command, control and protectionsØ sensors and monitoring system

Power Transformer

Power TransformersLife Cycle Optimization and Global Evaluation of Alternatives

Page 16: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-16Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 16

§ core induction§ no load losses - core§ load losses – windings, connections, metal

structures§ short-circuit impedances§ leakage flux§ inrush-current§ short-circuit current§ short-circuit forces§ core over-excitation§ DC excitation component§ voltage and current harmonics§ overloading§ insulation (windings and main)§ cooling and temperature rise§ noise level§ new technologies (Nomex, Vegetable Oil,

Vacuum OLTC, CTCs, Bushings RIP & RIS, etc)§ on-line monitoring and diagnostic§ on-line asset management

Power Transformer – Design Optimization

Transformer Design

§ cost optimization§ no load losses optimization§ load losses optimization§ characteristics optimization§ performance (thermal, loading, short-

circuit, etc) optimization§ transportation limits§ interchanged ability

§ transformer optimization strategies:Ø Total Initial CostØ Losses CostØ Total Operational CostØ Life Cycle Total Cost

Transformer Design Optimization

Power TransformersLife Cycle Optimization and Global Evaluation of Alternatives

Page 17: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-17Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 17

Steps:

1. Technical Specification2. Procumeremt process3. Manufacturer and Factory qualification4. Quotations, Technical&Economic Analysis, Purchase, Contracts5. Electrical Design6. Design Review7. Mechanical Design8. Manufacturing9. Factory Final Acceptance Tests10. Final Tests Results and Analysis11. FRA at Factory before transport12. Monitored Transportation13. FRA at Site after transportation14. Erection at Site15. Commissioning at Site16. Energization17. Operation18. Monitoring19. Maintenance

Transformer Life Cycle

Power TransformersLife Cycle Optimization and Global Evaluation of Alternatives

Page 18: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-18Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 18

Renewables Energy and Transformers ApplicationsLife Cycle – Optimized Selection of Alternatives

Page 19: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-19Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 19

USD$kVA x Useful Life x Overloading Factor

Capital Cost:n purchasen transportn installation

Operation Cost:n losses (noLoad,

Load, Auxiliar)n maintenancen insurance premiumn repairsn performance

End of Life Cost:n replacementn transfern refurbishment

NPV, Total Cost / Life Cycle $ = $1+$2+$3

$1

$2

$3

Warranty of Useful Life Garantida, year

Life Cycle, years

Transformer Life Cycle

Power TransformersLife Cycle Optimization and Global Evaluation of Alternatives

Page 20: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-20Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 20

Usual Method does not Evaluate:§ Quality§ Design and Manufacturing§ Withstand (electrical mechanical, thermal)

§ Risk of Failure§ Useful Life Expectancy§ Overloading Capability

Usual Evaluation Method:

n initial total cost:q equipment initial costq spare components costq transport costq installation cost (erection, supervision, etc)q comissioning costq extended guarantee cost

n losses cost (capitalisation)q no-load, load, auxiliar losses

n technical data tableq technical performance dataq technical guaranteed data

Global Value Index:§ total initial price, USD$§ rated power, kVA§ guaranteed useful life, years§ guaranteed overload, pu§ return on investment, % year

Transformer Life Cycle

Power TransformersLife Cycle Optimization and Global Evaluation of Alternatives

Page 21: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-21Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 21

Technical Performance Evaluation

§ quantitative evaluation method§ powerful technical performance comparison of

different suppliers§ technical & economical equalization of several

technical quotations§ main performance data:Ø thermal performance (core, windings, connections)Ø useful life (as per IEEE)Ø total lossesØ short-circuit (IEC)Ø certified/qualified seismic performanceØ transient voltages and internal insulation withstand

(switching of reactors!)Ø reliability analysisØ global economic evaluation

Guaranteed Technical Data

To meet declared guaranteedtechnical data it is not a guarantee:

q for a specified minimum performanceq for a specified useful lifeq for a short-circuit withstand with

reliabilityq for a economic optimized solutionq for a minimum LC total costq for a reliable operation life with no

failure

USD$kVA x UsefulLife x OverLoadingFactor

Increasing Asset Quality: Minimum Maintenance

Power Equipment Performance Equalization

Power TransformersLife Cycle Optimization and Global Evaluation of Alternatives

Page 22: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-22Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 22

USD$kVA x UsefulLife x OverLoadingFactor

Power Equipment Performance Equalization

Alternatives A B

Characteristic Unit Cellulose ThUpgradedPaper, 65Cdeg

Hybrid, Nomex Paper,95Cdeg

Initial Cost USD 1 000 000 1 200 000Rated Power kVA 50 000 60 000Useful Life years 42 80Overloading Factor pu 1.15 1.40Overloadind Time h 4 4Global Value Index USD/kVA . year 0.46 0.23Ratio % 100 50.4

Power TransformersLife Cycle Optimization and Global Evaluation of Alternatives

Page 23: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-23Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 23

Renewables Energy and Transformers ApplicationsLife Cycle – Losses Evaluations to Efficient Transformers

Page 24: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-24Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 24

q core induction, diameter, massq winding current densityq distance between windingsq winding diameters, width, height, massq tank mass

lossescost

manufac-turing cost

transformer mass, kg

valu

e,$

manufac-turing cost

transformer mass, kg

valu

e,$

manufacturingcost + losses cost

$$ Total Cost = Manufacturing Cost + Losses Cost = f (design variables)

Loss Capitalisation Cost, $/kWmaximum cost to pay to reducetransformer losse by 1 kW

Power Equipment Performance Equalization

lossescost

optimization

Manufacturing Cost:§ material§ labor§ over-heads

Power TransformersLife Cycle Optimization and Performance Equalization

Page 25: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-25Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 25

No LoadLosses

EvaluationsValues

Interest rate 0.02 $/kWh 0.03 $/kWh 0.04 $/kWh

4% 3100 4650 6200

8% 2100 3150 4200

12% 1550 2300 3100

1 kW losses in 30 years 8600 hours/year

Load Loss evaluations depend on load profile per day, months etc and aretherefore a varying % of the full year value

Power Equipment Performance Equalization

Power TransformersLife Cycle Optimization and Performance Equalization

Page 26: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-26Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 26

Specificationsfor low loss

powertransformers

Net present value of future losses§ assumed value of energy losses during lifetime

§ interest rate to calculate present value

Values translated into§ value of NoLoad loss $/kW

§ value of Load losses $/kW

Loss evaluations are key part of specifications§ actual values reflect future energy price expectations

§ interest value chosen determines time horizon

Power Equipment Performance Equalization

Lossevaluations inspecifcations

have beenrelatively stablein recent years

Power TransformersLife Cycle Optimization and Performance Equalization

Page 27: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-27Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 27

Renewables Energy and Transformers ApplicationsLife Cycle – Specification for High Performance and Reliability

Page 28: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-28Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 28

Harmonic Voltage and CurrentEffect on Transformer and Design Consideration

Harmonics: Voltage & Current§ core & windings losses§ faster degradation of insulation system

§ possible partial discharge

§ arcing

Required data from user§ K factor

§ harmonic spectrum

Design Considerations§ alteration of induction

§ additional cooling capacity

DC CurrentEffect on Transformer and Design Consideration

Presence of DC current§ small % of DC current leading to

saturation§ harmonics significantly higher for

unbalanced DC

Required data from user§ % of DC present

Design Consideration§ core appropriate induction

Power TransformersLife Cycle Optimization and Performance Equalization

Page 29: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-29Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 29

Continuous OverVoltage - OverExcitationEffect on Transformer and Design Consideration

StepUp and StepDown Operation and OverLoadingEffect on Transformer and Design Consideration

Exceeding V/F (Volts/Hz) ratio &component’s rating§ additional losses- core and coil§ insulation system weakening under full load

with overvoltage§ partial discharge PDs generation§ failure of component

Required data from user§ possible voltage limits§ frequency & duration of voltages going over

the continuous overvoltageDesign consideration§ core appropriate induction§ possible increase in BIL§ strengthen insulation system & processing§ possible use of power transformer components

Back feeding a step up transformer§ transformer designed as step up§ inrush current, voltage compensation

Required data from user§ step up /down operation possibility

§ short time overload duration & frequency

Design considerations§ core appropriate induction§ cooling§ additional kVA

Power TransformersLife Cycle Optimization and Performance Equalization

Page 30: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-30Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 30

Dissolved gas analysis(DGA) use as guidingprinciples

§ Standard refers to powertransformers

§ IEEE reviewing large databut pertaining to powertransformers

§ it is still an art not ascience

§ volume of paperinsulation/absorption ofgases

Reference to IEEE Standard C57.104, Table 1

Guideline for TDCG - Total Dissolved CombustibleGases

Two key points:

§ Table 1 assumes that no previous tests on thetransformer for DGA have been made and that norecent history exists.

§ the numbers shown in Table 1 are in parts of gas permillion parts of oil (ppm) volumetrically and are basedon a large power transformer with several thousandgallons of oil.

Power TransformersLife Cycle Optimization and Performance Equalization

Renewables Energy Transformers: DGA Dissolved Gas Analysis

Page 31: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-31Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 31

DGA can be used as a guide to detect:

§ partial discharge PD

§ high energy electrical arcing

§ thermal faults

§ cellulose insulation breakdown

§ overload(s)

§ overexcitations

Dissolved gas analysis(DGA) use as guidingprinciples

§ Standard refers to powertransformers

§ IEEE reviewing large databut pertaining to powertransformers

§ it is still an art not ascience

§ volume of paperinsulation/absorption ofgases

Power TransformersLife Cycle Optimization and Performance Equalization

Renewables Energy Transformers: DGA Dissolved Gas Analysis

Page 32: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-32Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 32

The principal or key gasses associated with each typeof issue:§ Hydrogen (H2): generated by partial discharge/arcing

§ Methane (CH4): generated by relatively low elevatedtemperatures (150° C).§ Acetylene (C2H2): generated by arcing.

§ Ethane (C2H6): generated by high temperatures(<300° C).§ Ethylene (C2H4): generated by high temperatures

(>300° C).

§ Carbon Monoxide (CO): generated by oxidation ofcellulose insulation.

§ Carbon Dioxide (CO2): generated by oxidation ofcellulose insulation.

Dissolved gas analysis(DGA) use as guidingprinciples

§ Standard refers to powertransformers

§ IEEE reviewing large databut pertaining to powertransformers

§ it is still an art not ascience

§ volume of paperinsulation/absorption ofgases

Power TransformersLife Cycle Optimization and Performance Equalization

Renewables Energy Transformers: DGA Dissolved Gas Analysis

Page 33: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-33Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 33

Points to be considered in data analysis

§ generation of gases in normal operation of transformer

§ rate of change of gases over a period of time

§ necessity of more than one sample over a period oftime

§ significance of change with reference to any event

§ normal operation of components

§ manufacturing process

§ comparison with a baseline DGA

Dissolved gas analysis(DGA) use as guidingprinciples

§ Standard refers to powertransformers

§ IEEE reviewing large databut pertaining to powertransformers

§ it is still an art not ascience

§ volume of paperinsulation/absorption ofgases

Power TransformersLife Cycle Optimization and Performance Equalization

Renewables Energy Transformers: DGA Dissolved Gas Analysis

Page 34: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-34Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 34

Renewables Energy Transformers: DGA Dissolved Gas Analysis

Recommendation

§ IEEE C57.104 Table-1: use as a guide

§ analyze the data based on more than one sample

§ compare the analysis with the baseline

§ further testing based on significant rate of change

§ consult manufacturer for furthertesting/recommendations

Dissolved gas analysis (DGA)use as guiding principles

§ Standard refers to powertransformers

§ IEEE reviewing large databut pertaining to powertransformers

§ it is still an art not a science

§ volume of paperinsulation/absorption ofgases

Power TransformersLife Cycle Optimization and Performance Equalization

Page 35: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-35Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 35

Wind Farm Collector Transformers: DGA and Gasssing

120 ppm

Power TransformersLife Cycle Optimization and Performance Equalization

TRc01 TRc02 TRc03 TRc04 TRc05 TRc06 TRc07 TRc08 TRc09 TRc10

Page 36: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-36Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 36

2500 ppm

Power TransformersLife Cycle Optimization and Performance Equalization

TRc01 TRc02 TRc03 TRc04 TRc05 TRc06 TRc07 TRc08 TRc09 TRc10

Wind Farm Collector Transformers: DGA and Gasssing

Page 37: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-37Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 37

Renewables Energy and Transformers ApplicationsLife Cycle – Performance, Reliability and Failure Modes

Page 38: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-38Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 38

voltageover-excitation

oil gassaturation

oil and insulationmoisture

actions drying insulation degassing oil WTG voltage controlTransf TAPS adjustments

oil, core, windingtemperature reduction

Replace Motor Fans D800Temperature Controlled

oil & insulation condition monitoringby a Hydran M2

daily load variation

WFarm Coll Tr01WFarm Coll Tr02WFarm Coll Tr03

load, MVA

Power Factor, puLoad Factor, ONAF2, pu

l

CollectorTransf TR03

Power TransformersLife Cycle and Failure Mode

Page 39: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-39Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 39

Dielectric Inter-Turn Insulation Failure of LV Winding

reduced inter-turn insulation strength (withstand)

• free water• bubbles• water droplets

low-energy PD

reduced breakdown voltage

Dielectric Inter-TurnInsulation Failure

oil gas saturation

oil and insulation moisture

daily load variation

voltage over-excitation

• free-water formation at reduced temperatures• free water vapor bubbles at load changes• oil and insulation oxidation• increased oil conductivity• water droplets in the oil• reduced PD inception voltage• reduced Insulation Breakdown Voltage

• dissolved gas in oil• free gas bubbles at load changes• reduced PD inception voltage• reduced Insulation Breakdown Voltage

• winding temperature fast reduction• oil temperature slow reduction• water exchange from oil to insulation• free-water and bubbles at oil-insulation interfaces• bubbles formation at reduced temperatures• free water vapor bubbles at load changes• reduced PD inception voltage• reduced Insulation Breakdown Voltage

• magnetic core saturation• high harmonics saturated flux outside the core• overheating and metal hot-spots• oil gassing• water formation• oxidation oil/insulation• moisture increasing

Power TransformersLife Cycle and Failure Mode

Page 40: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-40Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 40

water in oil

oil gas saturation

• insulation residual moisture at factory• entry during factory preparation for shipment• entry during transportation• moisture condensation over long time storage• moisture condensation in accessories

(conservator – shipped/storage not pressurized)• entry during site assembly• short-vacuum time at site after long time storage• core/winding/insulation heating in operation

water in insulation

• insulation residual moisture at factory• entry during factory preparation for shipment• entry during transportation• moisture condensation over long time storage• entry during site assembly• short-vacuum time at site after long time storage• core/winding/insulation heating in operation

• long time storage• high N2 content trapped in insulation• oil gassing from heated core/winding/metal parts• water and/or moisture vapor• oil/insulation oxidation (ñCO2)• short-vacuum time at site after long time storage

environment

• long time storage under N2 Nitrogen:Ø long time under N2 with in-tank gas variable

pressure (not automatic gas injection system)

• site assembly:Ø standard final processingØ standard vacuum time even after a long time

storage

• long time storage:Ø oil filled

• insulation conditioning:Ø oil samples and tests only 2 months beforeØ oil/insulation not conditioned to energization

• energization:Ø voltage control during a Wind Farm start-upØ connection to a strong HV power systemØ WTG GSU and collector transf tap settingsØ over-excitation

transformer• designed according to the specification• no-load excitation very low margin• full-load excitation very low margin• motor-fans OFF due to control with high

temperature settings keeping• long time storage under N2 with in-tank gas

variable pressure (no-automatic injection system)

oil and core high temperatures

• fans may be OFF due controls high settings• high core and windings hot-spots temperatures

Power TransformersLife Cycle and Failure Mode

Environment and Conditions

Page 41: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-41Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 41

Renewables Energy and Transformers ApplicationsLife Cycle - Operation Monitoring Optimization

Page 42: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-42Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 42

Monitoring

On-Line Monitoring and Sensors:

n load – current & voltagen ambient temperaturen top-oil temperaturen winding hotspot temperaturen moisture in oil/solid insulationn gas in oil H2, CO, C2H4, C2H2 (Hydran)n HV OIP cond bushings C1 & tand

ABB TECüs

üs

üs

! !

üs

MinimumSensors

Power TransformersLife Cycle and Operation Optmization

üs

üs

Page 43: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-43Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 43

Renewables Energy and Transformers ApplicationsLife Cycle – Advanced Asset Managment

Page 44: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-44Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 44

Advanced Asset Management

ActionAnalysisData1 2 3

EAM Mobile ERP

Sensors SCADA Historiador

§ Strategic Decisions§ Maintenance Plan§ Later Maintenance§ Replacement

§ Centralized Information§ Data Storage§ Data Management§ Data Protection

ALGORITHMS

§ ABB Methods§ Data Mining§ Condition Assessment ModelsØ failure riskØ asset condition

Power TransformersLife Cycle and Operation Optmization

Page 45: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-45Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 45

Advanced Operational BI

Data Processing andAnalytics

Subject Matter Workbench

Enterprise Asset and WorkManagement

Engineering Workbench

Complete InformationFleet to Equipment HealthActionable NotificationsBusiness Process WorkflowOptimization &Planning

Enterprise DataSources

Advanced Asset Management

Power TransformersLife Cycle and Operation Optmization

Page 46: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-46Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 46

Advanced Asset Management - Potential Benefits

Power TransformersLife Cycle and Operation Optmization

Page 47: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-47Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 47

Advanced Asset Management - Monitor

Power TransformersLife Cycle and Operation Optmization

Page 48: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-48Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 48

Advanced Asset Management - Monitor

Power TransformersLife Cycle and Operation Optmization

Page 49: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-49Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 49

Advanced Asset Management – Maintenance Planning

Power TransformersLife Cycle and Operation Optmization

Page 50: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-50Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 50

Renewables Energy and Transformers ApplicationsConclusions

Page 51: Transformer Life Cycle Power Transformers

ABB Brazil JCM A-51Power Products Division

Power Transformers© ABB Group14 de abril de 2015 | Slide 51

Conclusions§ technology is now available for economic Wind and Solar power production§ renewables energy power generation are fast moving up in Chile and SAM§ up to 2018 will be 20% and in 2025-2030 will be 30% of power source in Chile§ Wind and Solar together Hydro and Natural gas forming Hybrid Power Plants§ renewables energy bring demand for power transformers§ specific requirements are established for such transformers applications§ transformers key aspects:

Ø environmental friendlyØ advanced technology applicationØ long useful life minimum 30 yearsØ high reliability and availability at minimum maintenanceØ intelligent monitoring and advanced asset managementØ optimum overall life cycle

§ demand for a partner with a solid and experienced technology

Power TransformersLife Cycle Optimization and Performance Equalization

Renewables Energy Transformers

Page 52: Transformer Life Cycle Power Transformers