8/17/2019 Relatório Quantitativos de Vigas
1/3
Relatório quantitativos de vigas
Obra: Modelo 1
Data: 29/03/2016 00:59:23
Materiais:
Concreto: C20, em geral
Aço: CA-50 e CA-60
Tipo A.neg.kg
A.pos.kg
A.pelekg
A.est.kg
Totalkg
Ø5kg
Ø8kg
Ø10kg
Ø12.5kg
Ø16kg
Ø20kg
V.conc.m³
Pavimento Superior (+3,50)*V 1V-101(P15-P16)
Alta
8.5
4.7
2.9
16.1
2.9
13.2
0.272
V-102(P16-P17) Alta 4.4 4.4 2.7 11.5 2.7 8.8 0.256
V-103(P17-P18) Alta 8.5 4.7 2.9 16.1 2.9 13.2 0.272
Total V 1 21.4 13.8 8.5 43.7 8.5 35.2 0.800
*V 2V-104(P5-P7)
Alta
21.4
17.0
6.4
44.8
6.4
15.2
9.4
13.8
0.575
*V 3V-105(V 7-V 8)
Alta
1.7
2.3
1.2
5.2
1.2
4.0
0.100
*V 4V-106(P1-P2)
Alta
7.3
5.9
2.6
15.8
2.6
5.9
7.3
0.330
*V 5V-107(P1-P5)
Alta
8.7
7.9
3.7
20.3
3.7
14.8
1.8
0.360
V-108(P5-P9) Alta 11.3 5.8 3.6 20.7 3.6 1.4 15.7 0.352
V-109(P9-P11) Alta 5.8 5.7 3.6 15.1 3.6 11.5 0.344
V-110(P11-P13) Alta 8.5 5.7 3.6 17.8 3.6 1.4 12.8 0.344
V-111(P13-P15) Alta 9.3 6.0 3.7 19.0 3.7 0.7 14.6 0.360
Total V 5 43.6 31.1 18.2 92.9 18.2 3.5 69.4 1.8 1.760
*V 6V-112(V 4-V 2)
Alta
5.6
11.7
3.6
20.9
3.6
17.3
0.420
*V 7V-113(V 8-V 2)
Alta
6.5
14.1
3.8
24.4
3.8
13.3
7.3
0.468
*V 8V-114(P2-P3)
Alta
3.8
3.8
0.9
2.2
10.7
3.1
7.6
0.263
V-115(P3->) Alta 1.5 1.7 0.8 4.0 0.8 3.2 0.083
V-116(
8/17/2019 Relatório Quantitativos de Vigas
2/3
Tipo A.neg.kg
A.pos.kg
A.pelekg
A.est.kg
Totalkg
Ø5kg
Ø8kg
Ø10kg
Ø12.5kg
Ø16kg
Ø20kg
V.conc.m³
*V 6V-312(P2-P3)
Alta
3.8
3.7
2.2
9.7
2.2
7.5
0.210
V-313(P3->) Alta 2.9 1.7 0.7 5.3 0.7 3.2 1.4 0.066
V-314(
8/17/2019 Relatório Quantitativos de Vigas
3/3
Relatório quantitativos de vigas
Obra: Modelo 1
Data: 29/03/2016 00:59:23
Materiais:
Concreto: C20, em geral
Aço: CA-50 e CA-60
Resumo de quantitativos (+10%)
Tipo Aço Ø5kg
Ø8kg
Ø10kg
Ø12.5kg
Ø16kg
Ø20kg
Totalkg
Pavimento Superior (+3,50) CA-50 e CA-60 76.1 9.2 272.5 25.4 8.0 15.2 406.4
Porta Frontal (+5,00) CA-50 e CA-60 4.5 16.5 21.0
Cobertura (+7,00) CA-50 e CA-60 68.6 234.4 18.2 321.2
Total Obra 149.2 9.2 523.4 43.6 8.0 15.2 748.6