Citation preview
Daimler Trucks
PMBoK um guia de melhores prticasCV-DS a metodologia empregada na indstria automotiva
Metodologia CV-DS
Guia para Ger. Projetos na Automotiva
Segue princpios PMI/PMBOK
Baseada em Quality Gates
Prev:
inicio (S)
fim (QG 0)
responsabilidades
Substitui a necessidade da EAP Estrutura
Analtica do Projeto
Alemanha desenvolveu metodologia para gerenciamento de projeto de produtos CV-DS
CV-DS = Commercial Vehicles Development System
1 verso (CV-DS 1.0) estruturado como check-list, com definio de Quality Gates
como barreiras
CV-DS 2.0 aplicado em conjunto com o Software R-Plan, melhorando processo de reporte e
alterando o conceito de barreira para os QGs
Status atual: CV-DS 3.0 melhoria com base nos inputs gerados da aplicao do 2.0
Daimler Trucks
CV-DS 3.0
Optimize BC Confirm CD
Component Test Component test Component test Analyze results of D1comp. testing
ReleaseB
Release D(Finalize design)
Finalizationdevelopment work
Product releaseinhouse parts
Design
AnalysisA-sample
AnalysisB-samples Confirm final design status
Analysis
Drawing
release
Select series supplierwith prototype tools
Assign series supplier with series tools
Tool manufacturingSeries supplier
Requirement specs for manufacturing equipment
Final approval + handover
to series production
Productiontests 1-3 Ramp-up
Product releasepurchased parts
Styling FreezeData-control
-model
Test
IQG 0
TestB-samples
Confirmation run D-samplesBuild-up Build-upTest
A-sample Accelerated test Build-up
Installation Start-up approval
Trackmanufacturing equipment
Request for quotesOrder placement
Request for quoteorder placement
Test C-sampleentire product
Seriesproduction
Plant locationdecision
Make or buydecision
Marketreq.
Strategy for develop. depth
and general make-or-buy
Prepare and define
product- and production concepts
Techn.ideas
Pre-
selection
Projectimpl.specs
Concept competitions Develop. contracts
Productreq.spec
Productionreq. specsProject
req. specs
Product impl.spec
Production.impl.specs
Sys + Componentreq. specs
Component impl. Spec(inhouse+ext. development
P _
Verific.Certific.run
Only vehicles
Optimizationand finalization
Optimization
Design B-sample components
V E
P
E
100%parts P
100%parts _
100%parts E
Ensure parts availability for production tests
Delivery date of first parts from series production tool (D1)
100% product release (ISIR)
!
"#
100%parts V
Concept A
Manufacturability
Production concept
Selected P-releases
Develop. supplierspre-selected
Finalization
designComponentreq. specs
Projectreq. spec
Project scope andworking directionsStart
C-sampleavailable
Finalization ofLL-tools release
100% customer ready parts SOP
Market lauchcompl.
ReleaseC
AnalysisC-samples
Release of comp. without required confirmation
Workingdirections
Engineering Release of entire product
Product reliability
$
Concept selection
6 09 128 57 410
S
QFD
37a Finalization development
Release of comp. with required confirmation
Project implem. specB-samples available
Simulation
Components
Entire product
Daimler Trucks
CV-DS 3.0 Exemplo fase conceito
Optimize BC Confirm CD
Component Test Component test Component test Analyze results of D1comp. testing
ReleaseB
Release D(Finalize design)
Finalizationdevelopment work
Product releaseinhouse parts
Design
AnalysisA-sample
AnalysisB-samples Confirm final design status
Analysis
Drawing
release
Select series supplierwith prototype tools
Assign series supplier with series tools
Tool manufacturingSeries supplier
Requirement specs for manufacturing equipment
Final approval + handover
to series production
Productiontests 1-3 Ramp-up
Product releasepurchased parts
Styling FreezeData-control
-model
Test
IQG 0
TestB-samples
Confirmation run D-samplesBuild-up Build-upTest
A-sample Accelerated test Build-up
Installation Start-up approval
Trackmanufacturing equipment
Request for quotesOrder placement
Request for quoteorder placement
Test C-sampleentire product
Seriesproduction
Plant locationdecision
Make or buydecision
Marketreq.
Strategy for develop. depth
and general make-or-buy
Prepare and define
product- and production concepts
Techn.ideas
Pre-
selection
Projectimpl.specs
Concept competitions Develop. contracts
Productreq.spec
Productionreq. specsProject
req. specs
Product impl.spec
Production.impl.specs
Sys + Componentreq. specs
Component impl. Spec(inhouse+ext. development
P _
Verific.Certific.run
Only vehicles
Optimizationand finalization
Optimization
Design B-sample components
V E
P
E
100%parts P
100%parts _
100%parts E
Ensure parts availability for production tests
Delivery date of first parts from series production tool (D1)
100% product release (ISIR)
!
"#
100%parts V
Concept A
Manufacturability
Production concept
Selected P-releases
Develop. supplierspre-selected
Finalization
designComponentreq. specs
Projectreq. spec
Project scope andworking directionsStart
C-sampleavailable
Finalization ofLL-tools release
100% customer ready parts SOP
Market lauchcompl.
ReleaseC
AnalysisC-samples
Release of comp. without required confirmation
Workingdirections
Daimler Trucks | 4
Engineering Release of entire product
Product reliability
$
Concept selection
6 09 128 57 410
S
QFD
37a Finalization development
Release of comp. with required confirmation
Project implem. specB-samples available
Simulation
Components
Entire product
Recommended