Scott Bensley, Principal Metallurgist Processing - Resource Development/Metallurgical Development, Rio Tinto Iron Ore delivered this presentation at the 2013 FE Tech Conference. The event focussed on the economics of processing and the beneficiation of iron ore. In light of the slowdown in demand for iron ore and pricing decreases, the need to process more efficiently and cost effectively is a challenge. The conference examined on how we can achieve greater value from the iron ore supply chain, with topics addressing optimisation and streamlining processes, applying improved technologies, understanding the ore body and how to properly characterise it, knowing the steel makers needs. For more information please visit the conference website: http://www.informa.com.au/fe-tech

Citation preview

RTIO Pilot Plant Experience FeTech 2013

26 November 2013 RTIO Pilot Plant Experience 2

Recent Pilot Plant History

• 2003 Yandi Scrubbing Pilot Plant

• 2005/6 Marra Mamba BWT Pilot Plant

• 2009 & 2011 IronX Pilot Plant

• 2011 Hybrid Sizer Pilot Plant

• 2012 Low Grade Pilot Plant

2003 Yandi Low Grade Scrubbing

26 November 2013 RTIO Pilot Plant Experience 3

2006 Marra Mamba Desliming

26 November 2013 RTIO Pilot Plant Experience 4

2009 & 2011 IronX

26 November 2013

RTIO Pilot Plant Experience 5

2011 Hybrid Sizer

26 November 2013

RTIO Pilot Plant Experience 6

26 November 2013

RTIO Pilot Plant Experience 7

2012 Low Grade Beneficiation

26 November 2013

Presentation Title 8

Feed Prep Plant

Fines Plant (-1mm)

26 November 2013

Presentation Title 10

Jig Plant

26 November 2013

Presentation Title 11

Site selection

• Self sufficiency vs integration with Ops (MOU’s)

• Feed sourcing & transport

• Waste disposal

• Land, power, water

• Travel and accommodation availability

26 November 2013

Presentation Title 12

Low Grade Pilot Plant at Brockman 4

26 November 2013

RTIO Pilot Plant Experience 13

LGPP

BS4 Ops

BS4 LG

BS4 Mine

HSE learnings

• HSE

– Dust in eye incidents

– Rocks falling

26 November 2013 RTIO Pilot Plant Experience 14

Falling rock hazard

26 November 2013 RTIO Pilot Plant Experience 15

HSE learnings

• HSE

– Dust in eye incidents

– Rocks falling

– Isolation procedures

– Access platforms

– HSE support staff

26 November 2013 RTIO Pilot Plant Experience 16

Plant Design

• Site and Plant design

– Layout – HME separated from plant/operators

26 November 2013 RTIO Pilot Plant Experience 17

Separating HME, LV and Pedestrians

26 November 2013 RTIO Pilot Plant Experience 18

Plant Design

• Site and Plant design

– Layout – HME separated from plant/operators

– Scaleability of unit processes

– Matching capacities

– Sampling – Experienced team members to review designs

• Floor spillage and flow interruption

– Flowsheet with flexibility

26 November 2013

RTIO Pilot Plant Experience 19

Management

• Setting expectations for staff early

• Crew roster and structure

• Staggered crew members or 9/5 for better handovers

• Accommodation! Remember Maslow’s Hierarchy

• Preparation of Safety and Operating systems – allow a skeleton crew

• Early managers safety audit just prior to commissioning

• Control systems support staff

• Deadlines – budget, accommodation, people

• Project finishes when report is complete

26 November 2013 RTIO Pilot Plant Experience 20

Management (cont.)

• Extent of Laboratory services

– Everything on site (what turnaround)

– Prep on site or send to Perth

• Have all the equipment you might need available

– EWP, water cart, forklift, loaders (IT), trucks, service trailer

• Schedule the construction/commissioning/operations transition

• Plan for decommissioning/removal or care and maintenance

26 November 2013 RTIO Pilot Plant Experience 21

Feed Collection & Preparation

• Feed collection and homogenisation

– Many oretypes & sufficient quantity

– Incremental shovelling of feed piles

– Use of crushing and screening contractors or production plant

26 November 2013 RTIO Pilot Plant Experience 22

Stockpiles at the Low Grade Pilot Plant

26 November 2013 RTIO Pilot Plant Experience 23

Collecting samples with a belt plough

26 November 2013 RTIO Pilot Plant Experience 24

Feed Collection & Preparation

• Feed collection and homogenisation

– Many oretypes & sufficient quantity

– Incremental shovelling

– Use of crushing and screening contractors or production plan

– Moisture

26 November 2013

RTIO Pilot Plant Experience 25

Wet Feed

26 November 2013

RTIO Pilot Plant Experience 26

Feed Collection & Preparation

• Feed collection and homogenisation

– Many oretypes & sufficient quantity

– Incremental shovelling

– Moisture

• Sampling and quality control of feed preparation

– Sizing – regular checks to ensure lump and fines are on spec

– Contamination – preserving a ‘stockpile base’

– Oversize – incorporate trash removal in design

26 November 2013

RTIO Pilot Plant Experience 27

Marra Mamba Pilot Plant – Oversize Issues

26 November 2013

RTIO Pilot Plant Experience 28

Low Grade Pilot Plant Oversize and Contamination in Lump

Things you get right but don’t realise the importance at the time • Sample hoists

26 November 2013

RTIO Pilot Plant Experience 31

Fines Plant Material Hoist

Things you get right but don’t realise the importance at the time • Sample hoists

• Distributors

26 November 2013

RTIO Pilot Plant Experience 33

Things you get right but don’t realise the importance at the time • Sample hoists

• Distributors

• Data historians

• Belt filter operation

26 November 2013

RTIO Pilot Plant Experience 34

Important things you discover

• Up Current Classifier pulsating discharge to filter

26 November 2013

RTIO Pilot Plant Experience 35

Allflux discharge

26 November 2013

RTIO Pilot Plant Experience 36

Important things you discover

• Up Current Classifier pulsating discharge to filter

• Retreating primary cyclone overflow prior to WHIMS

• Sand filters on process water

26 November 2013

RTIO Pilot Plant Experience 37

Important things you discover

• Up Current Classifier pulsating discharge to filter

• Retreating primary cyclone overflow prior to WHIMS

• Sand filters on process water

• Pumping UCC underflow

– Unstable slurry at 35% solids v/v (65% w/w)

26 November 2013

RTIO Pilot Plant Experience 38

26 November 2013

RTIO Pilot Plant Experience 39

Technical

• It’s not just a mini gravel washing plant!

• Conveyor weightometer setup and test calibration

• Can’t have too much instrumentation

• Testwork Program

– This can and will change

– Consider duplicates and statistical design

– Plackett Burman, Factorial, Central Rotatable Composite

– Understand variability

• Mass balancing and data analysis

• Take lots of bulk samples

26 November 2013

RTIO Pilot Plant Experience 40