Esquema Elétrico NGD 9.3

Embed Size (px)

Citation preview

  • 8/12/2019 Esquema Eltrico NGD 9.3

    1/2

  • 8/12/2019 Esquema Eltrico NGD 9.3

    2/2

    H

    I6 for Volkswagan Titan Truck Application

    System Schematic (24V B-Sample Modules)

    Approvals DateDRAWN

    CHECKED

    ENGR

    DESIGNACTIVITY

    PROGRAMNAME

    SCALE SHEET

    REV.DRAWINGNO.SIZE

    TITLE

    International Truck and Engine

    2 of 2DATEPRODUCTGRP.

    B

    Confidential and Proprietary - Departmental Use Only

    A.Merrick

    A.Merri ck

    10/042004

    I6 Volkswagan (24V)

    3/4/2004

    3/4/2004

    545-20462

    Revison A: 03/04/2004

    Original Release

    Revison B: 04/30/2004

    Deleted RPS, RVAR and RPRE signals, due to new Remote Pedal

    Strategy (to be exactly the same as prior engine suppliers to VW)

    Revison C: 06/03/2004

    Corrected Diagnostics Connector drawing

    Bolded and put in RED wires that are different from Zero (+) samples

    to B-Sample modules for ease of updating the vehicle wiring harnesses

    Revison D: 07/20/2004

    Added possible two speed fan clutch wires for discussion purposes

    Added note on C-Sample change on PBA to +24V input

    Corrected pin out of Hella Pedal

    Added views of chassis side connectors

    Added pin numbers on switchs on chassis side

    Revison E: 07/22/2004

    Added CAN calibration and monitor connector. (Required for

    calibration and EMI test monitoring.) Added detail to starter to be more accurate

    Revison F: 08/02/2004

    Added Transmission Neutral Switch (ZF) on low side of the starter

    relay.

    Revison G: 09/09/2004

    Changed part numbers of wire harnesses to reflect latest I313

    changes

    Revison H: 10/04/2004 Reversed the ATA (+) and ATA (-) pins on the ECM