    technology case studies

    Hospital Sarah Kubitschek

    Joao Pedro de Lacerda Campos

    2015

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    2/35

    Locotion

    Rio de Janeiro, Brazil

    Architect

    Joao FIlgueiras Lima (Lele)

    Builted Area

    54 . 376 m2

    Year

    2002 - 2009

    Hospital Sarah Kubitschek

    Joao Pedro de Lacerda Campos

    2015

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    3/35

    Introduction

    Enviromental Strategy

    Structure

    Skyn

    Services

    Summary

    index

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    4/35

    Finished in 2009, the Hospital Sarah Kubitscheck in Rio de Janeiro was

    the last from the hospital network that consagreted Joao Filgueiras Lima (Lele) as

    an Architecture Master. Followig his previous work, the Hospital was desingned

    as an human enviroment, according to the concept of Progresseve Care, an idea

    that was discussed with the clients since the first hospital, in Salvador (BA, Brazil).

    Being so, the hospital is full of green and open spaces, where the pacients can

    spent time and make exercises, and it also has a huge consideration concernig the

    enviromental confort and the weel being of the pacients in their roms.

    The project should attend not only the complex program of an hospital

    assigned to locomotor diseases, but also should suply the demands for new

    technologies and maintenance without depend of big industries. Besides the

    technical premises, there is a clear intention to provide a differential enviroment.

    It can be seen in his assosiation with the artist Athoss Bulcao, making the colours

    and the artistic components not only decorative, but elements integrated with the

    Progressive Care concept.

    Introduction

    The architecture is its own

    purpose- Joao Filgueiras Lima

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    5/35

    The building has a linear shape, with the bigger facades oriented in

    the east-weast direction. This seems paradoxal cosidering the insolation, and

    the fact that Brazil has a hot weather, requiring the buildings to be protected

    from the sun. Althoug this orientation is the one that more receive solar load,

    in the specific site this is also the one that is more favorable to wind, an

    impotant element to remove heat out of the building. To bypass the solar issue

    the building takes advantage of a series of complex protection systems thatinvolves brises-solei and double layer covers with a huge air space between

    them. It also maximizes the venilation with a sophisticated shed roof, that

    covers the entire building and allows the air flux through suction (negative

    pressure) and chiminey effect. That, combined with the humidity provided by

    the lake and vegetation, and also an air-conditionig system, guarantees a

    cofortable enviroment inside the building.

    from almost any point in the hospital,

    the building allows pleasant views

    of Rio de Janeiro.

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    6/35

    The hospital is made from fou buildings interconected: General Services Block, Techinical Services

    Block, Hospitalization and Auditorium. The land, partially flooded, had to be landfilled to reach a secure

    level, 1,8 meters above the lake level. As an additional precaution against flooding, was designd an

    artificial lake surrounding the buildig. This lake receives all the rain water from the building and lead them

    to the big lake.

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    7/35

    Site Planscale: 1/1250

    1 - gate house

    2 - hospital access

    3 - service yard

    4 - parking lot

    5 - garden

    6 - water mirror

    7 - helipad

    8 - solarium

    9 - auditorium

    10 - ambulatory

    11 - hospi talization

    12 - service block

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    8/35

    Ground Floorscale: 1/1250

    1 - main entrance

    2 - hall

    3 - waiting room

    4 - ambulatorium

    5 - physiotherapy

    6 - orthopedics

    7 - radiology

    8 - hospitalization

    9 - first stage

    10 - cirurgic centre

    11 - chan ging room

    12 - lab

    13 - multipurpose room

    criativity centre/cafe

    14 - library

    15 - auditorium

    16 - parking lot

    17 - service yard

    18 - hydroterapy

    19 - water mirror

    20 -garden

    21 - solarium

    22 - cafe

    23 - hospitalization

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    9/35

    1 - technical floor

    2 - lifts

    3 - cafe

    4 - study center/auditorium access

    Technical Floorscale: 1/1250

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    10/35

    The unit Rio de Janeiro, like the others in Sarah network, is all build from pre-fabricated

    and padronizated components, due to the economy and better quality in the finishing, despite the

    reduction on the execution time. The mass industry logic, aplyed to the architecture also allows

    more investment in the project and in the detailing process, because the costs are diluted in the

    production serie. Besides, ampliations and reforms can be made using pieces and components

    fabricated with the same characteristics as the original ones.

    In the construcion of Sarah Kubitschek in Rio de Janeiro it was used pre-fabricated

    components in concret, steel and reinforced grout. The least one is a very versatile element,

    with a small thickness - wich allows it to adapt into several shapes. The architect stablished that

    by using reinforced grout he could get a reduction in weigh equal a four time the traditional

    construction, in concret and bricks. Steel was largely u sed to replace elemets before made of

    concrete, like the structure and zenital openings.

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    11/35

    Rio de Janeiro is located in southeast of Brazil, at 22,5 degrees of latitude.

    The weather is hot and humid, with temperatures between 15 and 40 degrees

    celcius. In a tropical weather like this, the main enviromental strategys are to protect

    from direct sunlight, insulate the building to avoid beeing heat by the sun, and also

    allows ventilation and air circulation. The predominant wind direction in summer is

    north and souheast - in summer the wind speed is higher, about four meters per

    second. The severe weather coditions in Rio were determinants in the architectural

    aproache.

    Lele has aways been known by his concerns about he enviromentalstrategy and how to make buidings in a confortable and sustentable way.The two

    most significant guidelines for the project defined by the architect in response to

    the weather were, first, the adoption of an horizontal strategy with green areas

    integrated to treatment and hospitalization spaces. Second, the proposal of

    alternative natural and artificial ventilation sistems giving priority to the first one

    whenever it was possible. However, the higlihgt detail in the project is the roofing

    system, which is basicaly a serie of huge skylighs that allows not only the natural

    ilumination, but also the natural ventilation of the iternal spaces.

    You can not restric theuse to the air conditioning,and not propose a moreefficient system.- Joao Filgueiras Lima

    Environmental

    Strategy

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    12/35

    Although the air conditioning system is used in all the internal area of the

    building, all the spaces also have a natural ventilation strategy. This is made manly

    by the skylight system. The hole building has a roof that is completely disconected

    of the internal layout, with variable heights that can reach eight meters. This roof

    has a serie of openings to allow the light to come in, and also the hot air from the

    internal spaces to get out. This happens because the air in internal spaces of the

    building gets hot by the presence of people inside, the hot air has less density then

    the cold air, therefore it tends to go up. Since the building has openings o the roof,

    the hot air goes up and out through this openigs, which makes room for air from the

    outside to come in. This ventilation strategy is called chimney effect.

    Under this roof there is a plain ceeiling in the internal enviroments. The space

    between the ceeiling and the roof has an air layer that works as an insulation. Both

    natural ilumination and ventilation can be controled by frames on the ceeiling, which

    works like windows, but horizontal. This way the user can regulates the conditionson his own room, without intefering in other spaces, even if the huge roof is the

    same for the entire building.

    Besides that, on the base floor the building has a technical floor, used to

    house machines and specialy the air conditioning system. This system is a fan coil

    kind, and in the hospital it is capable to capturate natural air that circulates in the

    technical floor and breath it to the rooms using its own ducts. On extremely hot

    days, the ceeiling frames are closed and the fan coil system is turned on. This way

    it breaths cold air inside the building. The return for the fan coil unites is made by

    other ducts, located in a raised floor. Lele used to say that in extremely hot cities,

    like Rio, it is inevitable to use air condioning. But his strategy was to use it only in

    really hot days, providing natural ventilation for the mild days, since he belived that

    air conditioning was an expesive and unhealthy solution that have beeing used

    indiscriminately.

    Glazing

    Brise Solei

    Air

    Air

    Return

    Fan Coil Technical Floor

    Ducts

    air flow inside the building

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    13/35

    The ventilation in the building can be made by three diferent ways:

    - natural ventilation only by the ceeiling frames and roof openings

    - forced natural ventilation, made by natural air from the technical floor injected in the rooms by the

    air conditionig ducts. The air is extracted by the roof openings.

    - refrigerated air, injected by the same ducts of tre previous case. The fan coil unites are turned on,

    and the openings are closed. the air is extracted by another ducts.

    air flow inside the building

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    14/35

    air gets in from the technical floor

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    15/35

    hot air gets out through th e roof

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    16/35

    in very hot days the openings are closed and the air conditioning turned on

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    17/35

    the roof shape, the brises solei and the ceeiling protec the rooms from direct sun

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    18/35

    One of the biggest concerns in Leles architectural practice has always

    been to make the construction more efficient, cheaper, and faster. This thought is

    reflected in every decision he takes, and specially in the structural system. Like the

    other buildings from the Sarah network, the hospital in Rio was designed following

    a modular system. Modular constructions are knwon to be more efficient and more

    rational, particularly in the production of the compoents and in the assembly in the

    location.

    All the hospitals from Sarah network are cases of well-heeled use of

    modular systems. According to the architect, the main point is to decide the basic

    module, since it will determinates the entire project. In this case the basic unit is

    1,25 meters, and all the dimensions are multiples from this one. The choice for

    this particular number was made considering the dimensions of other pre cast

    components, making easier to use elements already avaible in the industry. This

    way the construction is more economic, and the material waste is minimized.

    The buildings structure israised to poetry, as partof the aesthetics. There isno diference.- Lina Bo Bardi

    structure

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    19/35

    The hospital was build using metallic structure, with columns and beans in variable sections,and also metallic lattices, which made easier to give form to the roofs. The opition for metallic structure

    was made considering the advanteges of pre fabrication and assembly. The floor structre is also

    made from metallic frame, with gaps that vary from 2,5m; 3,75m or 5m. This frame transfer the loads

    from the floor to the columsn. The floor slab is made of pre cast reiforced grout.

    Because of the weak ground, the foundations are direct on the grond. Although, they do notneed to be very deep, due to the horizontal plan of the building. Most of the foundation block are

    isolated, and the columns are set direct on the concrete.

    on section is easy to se t he modulation

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    20/35

    the main structure are modulated porticos

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    21/35

    the roof is structured by metallic latticework

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    22/35

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    23/35

    the frames on the ceeiling are suported by a metal structure

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    24/35

    the buiding structure

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    25/35

    The auditorium structure is made of radial metallic frame,

    enchased on the top mettalic ring, and also o the reinforced

    concrete ring on the bottom. The top ring is covered by a semi-

    sphere in stainless steel. This structure is segmented in a way that is

    possible to completely open the circular gap.

    Top RingAluminium Sheets

    Raft

    Base Ring

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    26/35

    opening system auditorium sstructure

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    27/35

    All the walls on the building are made from pre cast reinforced grout panels.

    This makes easier the assembly and execution. All the components are made on the

    Centro de Tecnologia da Rede Sarah - CTRS (Sarahs Network Technology Centre).

    Lele experimented a lot with reinforced grout panels on his buildings. He claimed

    that building made by this system could be even four times lighter than traditional

    construction - with reinforced concrete structure and mansonry walls. Furthermore,

    the panels are light and can easily be carried by two or trhee people, which

    reduces the use of heavy machines on the construction.

    The walls are made by two panels, with an empty space between them.

    This gap generates an air layer that works as an insulation to the building, avoinding

    the building from beeing heated by the sun. The base has an aluminium sheet that

    helps the fixation on the ground. The conection between the two panels is made to

    avoid them to have contact with each other, which could create a way from heat

    transmitance.

    The mass production,today seen as base forarchitecture, always existedin nature- Lina Bo Bardi

    skin

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    28/35

    Air Layer

    Fixation

    Reinforced Grout Panel

    Aluminium Base

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    29/35

    reinforced grout panels fixations system

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    30/35

    The roof is made of aluminium sheets painted in white to help reflecting the sunlight. The

    ceeiling is made from transparent polycarbonate panels. All the panels are dumpers, to allow the air

    flux. The opening system is automated, which makes easier its use.

    Metalic Frame and Polycarbonate

    Column

    Maintenca Walkway

    Primary Beam s

    Secondary Beams - Ceeiling

    Reinforced Grout Slab

    Floor Ripping

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    31/35

    Acording to the architect, in very hot cities, like in Rio de Janeiro, you can

    not waive the air conditionig, otherwise you will not reach an internal confort

    suitable for work or living. Thus all internal spaces in the hospital are served by air

    conditioning. The system used is known as fan coil. This system is generaly used in

    environmets that need huge power, and it uses cold water, releasing the direct use

    of refrigerant fluids.The buildig has a huge central machine, located on the techinical

    floor, and the cold air is insufflated on the room by a series of ducts on the raised

    floor.

    One of the most important ideas on the Sarahs design is the flexibility. The

    architect aims to allow the entire building to be easily rearrenged without many

    losts. This way all the services are completely separeted from the walls. Most of the

    times the are instaled toghether with the structure, or inside small gaps between

    two beams or two columns. With the services running outside the axis of walls

    and partitions, the lamps are instaled beweent the envelope and the roof. All the

    structural sections were designed by the architect, and the beams have functions

    like gutters, eletric pipes and base to fix other elements.

    In very hot cities, youcan not waive the airconditioning, or you wontreach an internal confort- Joao Filgueiras Lima

    services

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    32/35

    Green Area

    Natural Ventilation Only

    Served by Air Conditioning

    Solarium

    Water Mirror

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    33/35

    1 - Aluminium Roof

    termoacoustic insulation

    2 - Gutter for Rain Water

    3 - Phone and Internet Cables

    4 - Termoacoustic Insulation

    5 - Fan

    6 - Eletric Cables

    8 - Lamp

    9 - Concrete

    10 - Pre Cast Slab

    11 - Raft

    12 - Pipe for Rain Water

    7 - Column

    conducts rain water

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    34/35

  • 7/25/2019 Sarah Hospital - Joao Filgueiras Lima

    35/35

    The hospital Sarah Kubitschek in Rio de Janeiro can be considered as

    the masterpiece of Joo Filgueiras Lima. All the technical solutions are complitely

    integrated, and work toghether to make the building extremely functional and

    confortable. The roof, definitely the most important element in the design, takes

    its most perfect shape, maximizing the ventilation and the ilumination inside the

    building. All the other services only complement the roof: the lighs and the air

    coditioning systems are not needed all the time, but caan perfectly meet the needs

    when it is necessary.

    But the most important is that all these technical solutions are not made

    only for economy and efficience. They all answer to the architects believe that a

    hospital should be a more human environment. Thats way he filled the rooms with

    natural light and fresh air - instead of making perfect airtight spaces. The hospital

    becomes a pleasant place, full of energy, life and light, to help the pacients get

    throught this difficult time in the best environment possible.

    Lele is the architect who

    makes art and technology

    meet each other, he is the

    builder- Lucio Costa

    summary