8/9/2019 CIP 2009.2010[1]
1/32
,$;.F*
CapitalImprovementPlanandCapital Budget
TllE TOWN OT
Fiscal Year2009-2010
8/9/2019 CIP 2009.2010[1]
2/32
T}lE TflW]I flI
May 7,2010Mayor William H. Seay, Jr.Town Council MembersHighland Park, TexasMayor and Town Council:We areherein. pleased to submit the Town's 2009-2010 Capital Improvement Plan ("CIP") as presentedIntroductionThis document contins the Town's plan for meeting its capil needs for the next five years andestablishes the foundation for meeting capital needs long into the future.The development of this Capital Improvement Plan ("CIP") began in April, 2009. The initial step wasto identifu projects for consideration and collect supporting information on estimated cost and scope foreach. This step was completed in May, 2009. Because of the necessity of focusing staffs energies onmanaging the 2008-2009 Operating Budget during a period of decreased revenues over the last half ofthe 2009 fscal year, no additional work on the development of the CIP was undertken until October,2009, when the compiled information was submitted to the Council for an initial review. Since thatinitial presentation, the Town Council and stff have moved forward in quantiffing each project basedon a common set of criteria that resulted in a ranking of the projects. The criteria used to evaluate eachproject are included on page 8.A Capital Improvement Plan is just that - a plan. It is a blueprint towads accomplishing the task ofresponding to short and long-term capital needs. Capital planning is not a new concept for the Town.A five-year historical review of the Town's capil spending reflects a spending plan that is very similarin appearance to the proposed CIP spending plan.
TEXAS
8/9/2019 CIP 2009.2010[1]
3/32
8/9/2019 CIP 2009.2010[1]
4/32
The remaining four years represent a forecast of future capil needs that may be funded givensufficient resources.ResourcesThe development of a formal CIP required that parameters, or practices, be established in order toretain the viability of the Plan. One such requirement is a minimum fund balance in the CapitalProjects Fund of $2,000,000. Another parameter, as recommended by staff, is the aggregation of thevarious available resources into the existing Capital Projects Fund. This is accomplished by themovement of fund surpluses in the General Fund and Utility Fund into the Capital Projects Fund. Atransfer of $3,000,000 from the Utility Fund to the Capital Projects Funds has already been approvedby ordinance and the transfer of $1,200,000 in General Fund surplus is included for consideration alongwith the adoption of the CIP. A third, as mentioned previously, is the inclusion of the two existingcapital programs and funding sources into the CIP.The Town will continue to explore the potential of public and private funding for projects. DallasCounty has shown a willingness to assist in providing some funding toward street right-of-wayimprovements. There may also be other sources of funding through grants and private donations,particularly as we approach the Town's centennial celebration.The following schedule reflects the funding sources for implementing the proposed five-year CIP:
Capital Proct FirndSash BahnceArnual Transr
REVENT]ES
General FundExcess Cash BalanceStreet ReswcingMbc. CorrcreteCarryover Prior FY
BeginnlgBlancefinn009
Utility FIndCash BalarceIntastucfure UDdate
$ 5.900.000
Storm Wate r Drainage UtilityF\lndCash BalarrceAnrnal Allocation
2009-2010Allocation
$ 1,200,000$ 10,234
Other SourcesConb:utiorsDonationsOther Govemnpntal
$ 650.0002010-2011Allocation
s 3.000.000s 529.435
Inveshrnnt Eamings
$
$ 260.000$ 650,000
20a012Allocaon
$ 464,609
Annual Res ourtes/Revenue s
I 620,740
$ 535,720
$ 1.100.000
$ 265,000$ 650,000
2012:2013:Alloction
$ 55t,790
$ 180,000$ 1.800.000
$ 270,000$ 650,000
20aM4Alloction
$ 10826.974
$ 551 ,790
$ 180,000
TMAI;ALIOCATION
$ r.800.000
$ 275,000$ 650,000
$ 100,000s 3284.044
$ 568,345$ 5,900,000
$ t 80,000$ 1.800.000
s 500.000
$ 280.000$ 3.250.000
$ 125,000
$ 1.200.000
$ 4.055,720
$ 2,843,314
$ 180,000$ 1.800.000
$ 500,000
$ 1,350,000
$ 165,000$ 4.116.790
$ 3.000.000
$ 180,000$ 8,300,000
$$ 120,000$ 3.576.790
$ 620.740$ 900,000$$ 66,000$ 3;544345
$ 1.000.000$ 576,000$ 27.364.0s4
8/9/2019 CIP 2009.2010[1]
5/32
ExpendituresCapital projects are defined as major, non-recurring expenditures exceeding $50,000 that improve theTown's physical assets. Capital projects are further delineated in the following categories:o Facilitieso Parkso Public Safetyo Public Workso Storm & Surface Watero StreetsThe completion of the assessment process resulted in the prioritization of projects for fundingconsideration. The Town Council and staff held a work session in March, 2010, to review and discussthe proposed CIP developed from this assessment process.
The following schedule reflects the spending plan that makes up the proposed CIP. The schedulepresents both all identified and prioritized,capital projects that are apart of the CIP process regardlessof funding status. The project costs shown are based on current estimates that will require updating infuture year CIP presentations. The schedule also includes the two on-going capital
Current ProjectsMockingbird taneExall lke DamAbbott Dainaeg Ir
Lr.rn sprr.
Hackberry Creek RestorationConnor Park StabiliationMirarnar Cuert Modf atiorsTraft Signal UpgradePreston Road RehabilittionRetaining Wall@ Town HallBridge Irspection & RepairsExa[ tke dredgingService Center wallTennb Court recorsErrctionTown HallparkingSfreet signage rrydateWillow Wood Allev Pavino
20tw0fl,,lloco[
$ 6,572,380
2W-2Qt2:rAllcadon,;
$ 372,380
.':,2.97?4!!*3,,,;,'Alldcoii l.
$ 300,000
$ 1,300,000 $ 2,000,000
$ 270,000
$ 1,600,000
$ 150,000
$ 1,300,000
$ 230,000 $ 380,000
8/9/2019 CIP 2009.2010[1]
6/32
The projects funded for 2009-2010 are presented on pages 12-20 while pages 2I-31 containinformation on projects that are unfunded and subject to future consideration. Detail for the two annualprograms is included on pages l0 & I l.CIP SummaryThe staff believes that the proposed CIP is a fiscally sound plan that will set the tone of future capitalproject management. It is understood that this is a dynamic plan and process and, like the annualoperating budget, will be continually managed. The proposed 2010 CIP, in summary, is as follows:
$ 10.826.974
ConclusionWe wish to thank the Mayor, each Councilinvaluable assistance in the development of thisRespectfully submitted,
$ 4,rt6,462$ 9,994,556
jj4 / ^r/t"7ill LindleyTown Administrator
$ 4,055,720 $ 4,116,790 $6.936.676
$ 3,576,790
Member and each Town Department Head for theirformal CIP and resulting capital plan for 2009-2010.
$ 5,976,676
$ s,976,676 $ s,472,676
'tBill PollockDirector of Fiscal & Human Resources
8/9/2019 CIP 2009.2010[1]
7/32
FACILITIESo Town Hall parkingo DPS Facility Flood-proofingPARKSo Tennis Court ReconstructionPUBLIC SAF'ETYo DPS Communications, DPS Administration, DPS Support Services & Town AdministrationFacility RenovationPUBLIC WORKSo Concrete Wall @ Service CenterSTORM & SURFACE \ryATERo Beverly Drive Culvert Modifications (between Drexel Drive & St. John's Avenue)o Connor Park Shoreline Stbilization & Silt Removalo Hackberry Creek Stream Bank Restorationo Exall Lake Dredging & Silt Removalo Reconstruction of Retaining Wall @ Town HallSTREETSo Beverly Drive Rehabilitationo Bridge Inspection and Repairso Miramar Avenue Culvert Modifications (between Drexel Drive & St. John's Avenue)o Preston Road Rehabilittion. Upgrade Traffic Signals - Bishop & Airline Avenue @ Mockingbird Laneo Uperade Town Signage Willow Wood Alley Paving EnhancemenPROGRAMSo Annual Miscellaneous Concrete and Street Resurfacing Projectso Annual Water & Sanitary Sewer Reconstruction/Rehabilitation Project
CAPITAL PROJECTS BY CATEGORY
6
8/9/2019 CIP 2009.2010[1]
8/32
Collection of selected projects with supporting documentationPresentation of Initial Listing of Projects to CouncilCouncil discussion on CIP developmentBudget amendment for the moving of specific resources betweenGeneral, Utility and Capital Projects Funds in anticipationof implementing the proposed CIPAssessment of projects and development of a prioritized listPresentation of assessment results to the Council and CIP discussionCIP work session - Council and staffFinal CIP review prior to submission for approvalAdoption of CIP and Capital Budget
CIP DEVELOPMENT CALENDARApril,2009
October 13,2009November 23,2009
December 14,2009January,2010
February 8,2010March 2,2010
March 22,2010May 10,2010
8/9/2019 CIP 2009.2010[1]
9/32
SAFETY - The level of risk or hazard to public health and safety that includes the determination ofpotential for loss of life, personal injury, loss of property or property value. (30%)TOWI\ SERVICES - The maintenance of existing or the development of new services, facilities andinfrastructure which allows the Town to deliver essential services to residents. (15%)QUALITY OF LIFE -The maintenance and enhancement of the Town's infrastructure and serviceswhich supports our residential community. This criterion would include projects which preserve andenhance the overall quality of life and projects which ensure economic viability to support a sustinablecommunity. (20%)
ASSESSMENT CRITERIA(WITH WETGHTED VALUE)
NECESSITY - The level of importance given to the project considering the consequences of deferralboth in its impact on public health and welfare and financial/opportunity loss. (20%)OUTSIDE FINANCIAL SOURCES - Extent to which non-Town funds in the form of grants,matching funds, or private donations are likely to be available to fund this project. (10%)BUDGETARY IMPACT - The impact that thiscosts. (5%) project will have on current and future operating
8/9/2019 CIP 2009.2010[1]
10/32
PROJECTDETAIL
9
8/9/2019 CIP 2009.2010[1]
11/32
Town of Highland Park, TexasCapital Improvement Plan
Pmct CategoryTotal Pmcted CostDes
An annual program of resurfacing asphalt road surfaces throughout the Town based upon surface and road be conditions and thereplacement of adjoining concrete surfaces (sid ewalk, curb & gutter, inverts and approaches). Although all fund ing for this program ismanaged through the Capital Projects Fund's ROW ("CPF-ROW') subfund, the source of funding for the annual street resurfacing prognmis from a transfer from the Utility Fund based upon a 5% street rental fee charged on goss rvenues forwate sanitary sewer and solidwaste coleection and disposal services, The miscellaneous concrete element is funded from an annual transfer from the General Fund fromcurent revenues. Program expenditures and resources are projected to be used in conjunction with the Beverly Drive Rehabilitation Projectin FY 201 l.
of
SteetsAnnual Progra.m
ExoenditurtsConsrction
Department of ResponsibilityUseful Life
Fundins SouresCPF - ROW
Previoustr'undino
Totl $ 59 r ,230$ s9r,230FY 2010$ 789.435$ 789.435
PrcviousFundins
Totl s 472,12
FY201t$ 800.720
s 472,tt2
Fairx (from Lonn Aho to Bever) = 8,877 syN. Versailhs (from Rohnd to Ar6tong) = 5pl7 syS. Versails (from Robnd to Arnrstong) = ,013 syBebbire (tom Roland to lonn AIto) = 3,ZqO syLorraine (fom Doughs to Preston) = 2,870 syArcady (from Dowbs to Preston) = l,S[] 5y
Engireringl 0 years
$ 800.720
FY 2010s 789.43s
['V?tt 2$ 821.790
$ 789.435
$ 821.790
FY201l$ 800,720
"v 2013$ 826,790
$ 800.720
$ 826.790
Fr2012
FY 2014
$ 821,790
$ 848,345
$ 821,790
$ 8484s
FY2013
Fv20l5
$ 826.790
$ 870,395
$ 826,790
$ 870J9s
FY2014$ 848.345
$ 5,548,705Total
$ 848,34s
$ 5,548,705
FY20t5$ 870.395$ 87039s $ 5.429.587Total
$ s.429.587
l0
8/9/2019 CIP 2009.2010[1]
12/32
Town of Highland Park, TexasCapital Improvement Plan
ProJect CrtegoryTotal Pructed Cost
The Town has maintained a pay-as-you-goprogram for the replacement/rehabilitation of its aging water and sanitary sewer systems since theI 980's. The Town funds this program through current revenues for the sale of water and sanitary sewer services. The Utility Fund generates theresources which are trnsferred to the Capital Projects Fund - Utility Infrastructure ("CPF-Utilities").
ofPm
Storm & Surce WaterProgram
ExnrxlihrnsCorstuctbn
De parrc nt of Re spons ibilityUseful Ufe
PrcviousFhnllmTotal $ I,800,000$ r.800.000
EV 20tO$ r,800,000$ 1.E00.000
FY20lt$ 1,800.000$ 1,800,000
Pro.lcctRcplace watcr and sanitary sewer line - eascment in 44OO Blockbetwccn Mockingbird Lane and Southem AvcnueRcplacc watcr and sanitary sewer line - easemcnt in 44OO Blockbctwcen Livingston Avenuc and Edmondson AvenucRcplace water and sanitary sewcr line - casement in 44OO Blockbctween Fairfax Avenuc and Elcvcrly DriveReplacc watcr and sanitary sewcr linc - cascmcnt in 43OO Blockbctwccn Bcvcrly Drivc and Vcrsailles AvcnueRcplacc watcr and sanitary sewer line - easemcnt in 42OO Blockbctween Fairfax Avenue and Edmondson AvenueRcplacc watcr and sanitary scwer line - allcy in 42OO Blockbetwecn San Carlos Drive ([Jniversity Park) and Potomac AvcnucWaterline at Lcmmon bctwccn Wcstside Drivc and MacArthurAvcnueCIPP of sanitary scwcr linc in St. John's Drivc from EuclidAvcnue to Amstrong AvcnueReplacc watcr and sanitary sewcr linc - 37OO Block of Crcsccnt,A'venuc Total
Engineering80 years
FY:012$ r.800.000$ r.800.000FY20l3$ 1.800.000$ 1.800.000
FY 2014$ 1.800.000$ 1.800.000
2009-2010
FY2015$ 1.800.000$ r.800.000 $ 12.600.000Total
$ 12.600.000
$ 12,600,000
Estlmatc Costs 237,500
237,5002so,ooo3l6,000252,5o0275,OOO
50,oool25,OOO56,500$ l,800,ooo
8/9/2019 CIP 2009.2010[1]
13/32
Town of Highland Park, TexasCapital Improvement Plan
Pmct CategoryTotal Procted Cost
This project involves the development of greenspace at two locations along Mockingbid Lane. At 35 I 8 Mockingbird Lane, the projectedincludes the purchase ofa parcel of land and the development of a grcenspaco to improve pedestrian safety at the intersection ofMockingbirdlaneandByronAvenuewhereaschool crosswalkislocated. ThesecondisthedevelopmentofagreenspaceatMockingbirdLane's east intersection with the Dallas North Tollway. Tis site will serve as a visual entry portal for the Town on its west side.
of
Parks$334,s26
Departnrcnt of ResponsibilityUseful Life
Fundins SourcesCPFPrtvlowFhndins
Totl $ 98,796
ParksSrrchro - 50 yearsIandscape - Continuors
$ 9E.796FY 2010$ 236.997s 236.997
FY 201 I Fr20l2 FY 2013 FY2014
II
Fv201s$ 335,793
Totl$ 33s.793
I2
8/9/2019 CIP 2009.2010[1]
14/32
Town of Highland Park, TexasCapital Improvement Plan
This project provides for an engineering study ofthe Exall Lake Dam and an analysis of its integrity.any improvements identified and needed,of Proct
EngirreringUndetermined
Funding of $500,000 is available for
l3
8/9/2019 CIP 2009.2010[1]
15/32
Town of Highland Park, TexasCapital Improvement Plan
Proct CrtegoryTotal Pructed Cost
The Town televised the Abbott Avenue storm sewer to determine scope of work needed to improve drainage. The esult ofthat study is acontract for identified improvements.
Storm & Srrce Water$349,650
Departnrent of ResponsibilityUseful Life
Engheering50 Yean
t4
8/9/2019 CIP 2009.2010[1]
16/32
Town of Highland Park, TexasCapital Improvement Plan
Pmject CategoryTotal Pmcted Cost
Acquisition of ncccssary rcplacemcnt communications cquipment will neccssitatc thc cxpansion of thc DPS Communications arca. Thiscxpansion will, in tum, impact thc spacc occupicd by DPS Administration and DPS Support Scwiccs and, possibly, Town Hall. Thc scopc ofthis projcct is to idcntify cunent and future spacc nccds within DPS Communications, DPS Administration, DPS Support Scwiccs and TownAdministration and to addrcss thesc nccds through rcnovation ofcxisting spacc and possiblc cxpansion.
Public Safcty$6,500,000
ExoendituresArchitcchral dcsConfinnicationsConsErrtion
y'spacc phn IPrcvioustr'undins
Funding Sources
Depament of ResponsibiligUseful Life
s 72,380
PF
Totl $ 72.380FY20l0$ 300,000
s 300.000Previousf'rnlino
Total
FY20ll
$ 72,380
$ 1.000.000$ 300.000
s 72-ft
$ r,300,000
DPS8 ycars - Equnnnt50 ycan - Fac
FY 2010
Fv012
$ 300,000$ 300.000
$ 2.000.000$ 2.000.000
F\/ tot l
$ 1.300.000FY20ll$ 1300.000
s r.600.000$ 1.600.000
FY20l4
Fr20t2$2,000.000 I $r,600.000 I $r.300,000
$ 1.300.000
$2.000.000 I s1.600.000
$ 1300.000
Fy 201 5
FY20l3
$ 372,380Total
['v 2014
s 1.000.000
su00.000
$ 5.20U-UU0s 6.572.380
FY 2015 $ 6.572.380Total$ 6.572.380
l5
8/9/2019 CIP 2009.2010[1]
17/32
Town of Highland Park, TexasCapital Improvement Plan
The retaining wall along Hackberry Creek were it runs under the parking deck and the DPS facility requires flood-proofing to stop theseepage ofwater into the basement during heavy rainfall events.of
ExoenditursConsfirction
Fndins SouresCPF
PrtviousFrndlnoTotal
FY20l0
PrcviorsFlndinpTotol
FY20lts 20.000$ 20.000
DPS20 pan
FY20l0
FY20l2s I 8l .600s tflt-60n
Fv20tl$ 20,000
FY 2013
$ 20,000FV20t2$ r 81,600
Fv2014
$ 18t,600FY 2013
FY 2015
FY20t4
$ 20t,600Total$ 201.600
FY 2015 $ 201.600Tnfcl$ 201.600
l6
8/9/2019 CIP 2009.2010[1]
18/32
Town of Highland Par TexasCapital lmprovement Plan
DescThe culvert located at Beverly Drive and St. John's Drive is undersized for the amount of water flow during heavy rains. This projectincludes an engineering study, in conjunction with the development of a master plan for Hackberry Creek, and reconstruction of the culvertsto alleviate water flow restrictions and improve water flow along Hackberry Creek.
ofDepartment of ResponslbllityUseful Llfe Engineering50 years
t7
8/9/2019 CIP 2009.2010[1]
19/32
Town of Highland Par TexasCapital Improvement Plan
Fullyrehabilitateallinadequatesubsurfaceutilities,pavement,curbandgutter,andresurfaceroadway. Thescopeofworkwillincluderepairs to storm sewer, sub-base repairs, sidewalk repairs and elimination oflow areas in the pavement.of Pro
Construction
Fundinq Sources-ROWounty
PrevousFundine
Engineering20 years
FV 201n$ 65,000$ 5_O00
FY 20tl$ t.000.000$ 50().0(xt$1.500.001,
FY20l2$ 617.000$ 500.000$ 1.117.000
FY 20t3 F.Y 2014 FY 20rs It tr5.t,tl(lTotal$ t,17,000$ r.000.000I -flz-ililil
l8
8/9/2019 CIP 2009.2010[1]
20/32
Town of Hlghland Park, TexasCapital Improvement Plan
Proct CategoryTotal Pmjected Cost
Heavy rain events have resulted in the erosion of the stream bank along Hackberry Creek.treesto fall, creating blockages and collection ofsediment.of
Storm & Srrce Water$3, r 80,000
Exnendlturusu'vey & Ensineerins
Departnnt of ResponsiblllgUeful Llfe
PrtvlowlrndlnoTotl
v tor n FY20il
As a result, tree roots have been exposed, causing
Ergircering30 years
Ftrtol2$ 150.000$ 150.000FY2013$ 230.000$ 230.000
FY2014 FY201s s 380.000Totl$ 380.000
l9
8/9/2019 CIP 2009.2010[1]
21/32
8/9/2019 CIP 2009.2010[1]
22/32
Town of Highland Park, TexasCapital Improvement Plan
The culverts located at Miramar Drive and Hackberry Creek are undersized for the amount of water flow during heavy rainfall events.Waterbackup affects adjacent private property.ofProct
F;tgineering40 years
2t
8/9/2019 CIP 2009.2010[1]
23/32
Town of Highland Park, TexasCapital Improvement Plan
The upgradeof signals and signage at this intersection will bring conformity in appearance and technology withthe recently completedreconstnction of Mockingbird Lane from Hillcrest Avenue to the Town's west limit line.of
Engirrcering15 years
1%====--T iIgFj-lr-E=WAL
=E=ffi22
8/9/2019 CIP 2009.2010[1]
24/32
Town of Highland Park, TexasCapital Improvement Plan
Preston Road has been showing signs of cracking and deterioration. Large, heavy tncks travel on it daily as well as a high level ofpassenger vehicles. The driving surface has begun to fail in some areas due to weakened subgrade. Thee is the potential offundingparticipation by Dallas County and the scheduling of this project will likely coincide with their funding schedule.
Engneeringl0 pars
23
8/9/2019 CIP 2009.2010[1]
25/32
Town of Highland Park, TexasCapital Improvement Plan
Pmct CrtegoryTotal Projected Cost
The retaining wall along Hackberry Creek as it passes under Town Hall and south is separated due to undermining and erosion.streambed is also restricted from Town Hall to Euclid Avenue causing potential for flooding as experienced in 1995.
Storm & Srce Water$5 t 3,000
Department of ResponslbllltyUsefrl Life
Engneering50 pars
24
8/9/2019 CIP 2009.2010[1]
26/32
Town of llighland Park, TexasCapital Improvement PIan
Proct CrhgoryTotal PrcJechd Coct
Conduct inspection ofthe Town's 8 bridges that carry vehicular taffic in conjunction with the biennial TDOT bridge inspection to assistin identifying early ss of erosion and structual failures.of
Stets$60,000
Departm nt of RecponrlblllgUsefrl llfe
II
ErUirEeringN/A
25
8/9/2019 CIP 2009.2010[1]
27/32
Town of Highland Park, TexasCapital Improvement Plan
Proct CategoryTotal Projected Cost
Accumulated sediment is restricting flow capacity of the dammed portion of Turtle Creek - Exall Lake. The poor water quality is due to aninadequate water depth and algae growth. The dredging would include the area from Beverly Drive to Exall Dam.of
Storm & Surce Water$900,000
Departrne nt of Re spons ibiltyUseful Life
Engrreering30 years
26
8/9/2019 CIP 2009.2010[1]
28/32
Town of Highland Park, TexasCapital Improvement Plan
Pmct CategoryTotal Pmcted CostDesc
Replace approximately 460 linear feetofwood fencingaround storage arealparking lot atthe Service Center. This project may be absorbedinto the water & sanitary sewer infrastructure program as this site is used for material storage on Public Works projects.
Public rvVorks$ss,000
Departnrcnt of ResponsibllityUseful Llfe
Engineering30 years
:
liiiri i
27
8/9/2019 CIP 2009.2010[1]
29/32
Town of Highland Park, TexasCapital Improvement Plan
Descriotion ofReconstruct tennis courts #1, #3,#4,#5,#6,#7 &.#8 with a post-tension concete slab, new fencing and new lighting.
Parks20 yean
li'..u.*'+ ll--*.(
\i
I
8/9/2019 CIP 2009.2010[1]
30/32
Town of Highland Park, TexasCapital Improvement Plan
Construct angle parking spaces at Bartholow Square along Drexel Drive and restripe parking spaces along Euclid to incree the number ofparking spaces by I 6. This project has a high potential of being incorporated into any construction project scheduled for the DPS/TownHall facility.of
Engineering50 years
29
8/9/2019 CIP 2009.2010[1]
31/32
Town of Highland Park, TexasCapital Improvement Plan
Pmct CrtegoryTotal hocted Cost
ImprovementintheappearanceoftheTown'ssignagewithnewbranding. IncludesT00stretnamesigns,355streetlightsandl2trafficsignals. New LED technology will be used for lighting.of
SEets$270,000
Departne nt of Re sponsibllltyUsetul Llfe
EngineeringN/A
30
8/9/2019 CIP 2009.2010[1]
32/32
Town of Highland Park, TexasCapital Improvement Plan
In response to requests, this project will enhance both the appearance and the life ofthe asphalt surface for the alley leading to Teddy BearParkforpedestriantraffic. ThisalleyservesasakeylinkinthewesttoeastfoottafficthroughtheTown. Thisprojectmaybeabletobeincluded in a future street resurfacing program.
of
EngineeringI 5 years
3l