Energy Cables and Systems - Utilities High Voltage Tests and Diagnostics in Cables Pietro Corsaro – PIRELLI GianCarlo Montanari – University of Bologna

Ensaios Em Alta Tensão e Diagnósticos de Cabos s506

  • Upload
    wbt1

  • View
    214

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Ensaios Em Alta Tensão e Diagnósticos de Cabos s506

Energy Cables and Systems - Utilities

High Voltage Tests and Diagnostics in Cables

Pietro Corsaro – PIRELLIGianCarlo Montanari – University of Bologna

Page 2: Ensaios Em Alta Tensão e Diagnósticos de Cabos s506

Energy Cables and Systems - Utilities

Contents

• European Scenarios

• Overview on measuring technique

• Conclusions

• Case Study

Page 3: Ensaios Em Alta Tensão e Diagnósticos de Cabos s506

Energy Cables and Systems - Utilities

European Scenarios

Various approach within Europe, due to:

• Adoption of different testing standard:–Quality insurance approach;–High Stress Test;– IEC Standards.

Page 4: Ensaios Em Alta Tensão e Diagnósticos de Cabos s506

Energy Cables and Systems - Utilities

European ScenariosFrance

• Power systems and installation condition highly standardized.

• Few installers qualified by EdF.• Extremely long qualification process.• Installed Systems are therefore

considered a priori failure proof.• EdF therefore does not see the need of

field tests.

Page 5: Ensaios Em Alta Tensão e Diagnósticos de Cabos s506

Energy Cables and Systems - Utilities

European ScenariosThe Netherlands - Germany

Cables and accessories are factory tested at high voltage level

Vtest = 2.5*U0

Customers do not feel the need of any further test due to the high test level.

Page 6: Ensaios Em Alta Tensão e Diagnósticos de Cabos s506

Energy Cables and Systems - Utilities

European Scenarios Spain

- After-Installation test in agreement with IEC standard (withstand test 1 hour/off-line);

- Increasing demand of PD monitoring from major utilities due to contingency:– Abnormal failure rate in the last year with

consequent increased interest of utilities in preventive diagnostic.

Page 7: Ensaios Em Alta Tensão e Diagnósticos de Cabos s506

Energy Cables and Systems - Utilities

European ScenariosItaly

–After-Installation test in agreement with IEC standard (withstand test 1 hour/off-line);

– Increasing demand of accessories with embedded PD sensors (from 275 kV and higher) for new systems.

– Increasing demand of PD monitoring at commissioning stage and after repair.

Page 8: Ensaios Em Alta Tensão e Diagnósticos de Cabos s506

Energy Cables and Systems - Utilities

Pirelli-TechImp Cooperation

In 1999 Pirelli started a collaboration with University of Bologna / TechImp to develop PD sensors and testing techniques on power transmission systems, particularly focused on accessories, to provide reliable information for Condition Based Maintenance.

Page 9: Ensaios Em Alta Tensão e Diagnósticos de Cabos s506

Energy Cables and Systems - Utilities

Pirelli-TechImp CooperationMain outputs

A wide range of PD sources has beencharacterized for testing reference:–Cavity–Misalignment–Protrusion–…

Thanks to Pirelli cable expertise and TechImp technological know-how.

Page 10: Ensaios Em Alta Tensão e Diagnósticos de Cabos s506

Energy Cables and Systems - Utilities

Pirelli-TechImp CooperationMain outputs

A number of sensors has been developed:–HFCT– Inductive Clamps–Capacitive embedded

to be capable to test in reliable way both new and existing installations

Page 11: Ensaios Em Alta Tensão e Diagnósticos de Cabos s506

Energy Cables and Systems - Utilities

Detectable defects

All those non conformities causing an high electrical gradient and lack of material and consequent partial discharge:– Air gap– Not-compressed cuts– Semi-conductive elements mispositioning– Electrical trees– Protrusion– …

Page 12: Ensaios Em Alta Tensão e Diagnósticos de Cabos s506

Energy Cables and Systems - Utilities

PD: Testing method

Main difference on voltage test source:• ON LINE: System under test is

energized by means of the grid

• OFF LINE: System under test isenergized by means of mobile resonant test set.

Page 13: Ensaios Em Alta Tensão e Diagnósticos de Cabos s506

Energy Cables and Systems - Utilities

PD: Testing method - Pro & ConsOff-Line On-Line

Potential problem on the grid in case of failure

Induced noise from the grid

Induced noise from adjacent phase

Test Voltage level

Released power in case of failure

Costs

Page 14: Ensaios Em Alta Tensão e Diagnósticos de Cabos s506

Energy Cables and Systems - Utilities

Mobile Test Sets Fleet

2 x150 kV

220 kV – 440 kV50 kV

100 kV

260 kV260 kV – In progress

160 kV

Page 15: Ensaios Em Alta Tensão e Diagnósticos de Cabos s506

Energy Cables and Systems - Utilities

Testing Procedure

–If power system does not have embedded sensors, external sensors are applied on it;

–Sensors are calibrated;–The system is then energized @ no

load;–PD activity, if any, can be then

monitored on one or more accessories at the same time.

Page 16: Ensaios Em Alta Tensão e Diagnósticos de Cabos s506

Energy Cables and Systems - Utilities

PD: SENSORSHFCT

Can be used in the earthing connection of the termination Can be used with LINK BOXGood sensitivityObject measured has to be sectionalised (can not be used on stright joint)

INDUCTIVE CLAMP A.C.M.S. (Around Cable Metallic Sheath)No limit in application (need just the cable)Easy to be appliedLow sensitvity

INDUCTIVE CLAMP U.C.M.S. (Under Cable Metallic Sheath)No limit in application (need just the cable)Can be embedded during the accessory assemblingGood sensitivityThe cable metallic sheath has to be cut

CAPACITIVE “EMBEDDED”Very High sensitivity PD Located immediatelyCan be applied ONLY during the accessory assembling

Page 17: Ensaios Em Alta Tensão e Diagnósticos de Cabos s506

Energy Cables and Systems - Utilities

PD: Sensors Sensitivity

Sensitivity

HFCT

UCMS

ACMS

Embedded Capacitive

Page 18: Ensaios Em Alta Tensão e Diagnósticos de Cabos s506

Energy Cables and Systems - Utilities

PD: embedded capacitive sensor

Page 19: Ensaios Em Alta Tensão e Diagnósticos de Cabos s506

Energy Cables and Systems - Utilities

PD: embedded capacitive sensor

Page 20: Ensaios Em Alta Tensão e Diagnósticos de Cabos s506

Energy Cables and Systems - Utilities

Testing Procedure

Feasibility of on-line or off-line energisation depends on the sensors used.

It is not technically correct to guarantee a priori a sensitivity level for on-site monitoring applicable to every installed system.

Sensitivity level for on-site measurement must be defined case by case

Page 21: Ensaios Em Alta Tensão e Diagnósticos de Cabos s506

Energy Cables and Systems - Utilities

PD: METHODS“JUST A CHECK”

Can use the earthing connection of the terminationMeasurements performed only from the terminationNot applicable to Long Link

SEQUENTIALCan use LINK BOXCan be applied to OLD link without any problemsBreakdown can happen without any PD evidence on jointnot “on measurement”

SIMULTANEOUSAll the accessories measured in “ONE SHOT”PD Location easiestNO data “LOST”On old link can be used only with Inductive or embeddedSensors

MONITORINGGive an evaluation of the PD PATTERN TRENDVery helpful for condition base maintenanceCan be used only with Inductive or embedded Sensors

Page 22: Ensaios Em Alta Tensão e Diagnósticos de Cabos s506

Energy Cables and Systems - Utilities

Pirelli-TechImpHow we act

We are able to provide an optimised configuration for PD testing:

– Mobile test-set world-wide (to avoid influence to/from the grid);

– Sensors for PD detection with ultra broad band frequency acquisition

– Acquisition tool capable to manage a large amount of data.

– Professional data analysis for reliable condition assessment.

Page 23: Ensaios Em Alta Tensão e Diagnósticos de Cabos s506

Energy Cables and Systems - Utilities

PD MEASUREMENTS

2451

70

150 152

300

0

50

100

150

200

250

300

Tota

l leng

th o

f cab

les (k

m)

Num

ber o

f acc

esso

ries

2002 2003 2004 (first6 months)

Year

Partial Discharge MeasurementOn Site Activity: 2002÷2004

Cable lengthaccessories

Page 24: Ensaios Em Alta Tensão e Diagnósticos de Cabos s506

Energy Cables and Systems - Utilities

PD MEASUREMENTS

0

10

20

30

40

50

60

70

80

Total

leng

th of

cable

s (km

)

2002 2003 2004 (first 6months)

Year

Partial Discharge MeasurementsOn Site Activity: 2002÷2004

< 150 kV220 kV400 kV

Page 25: Ensaios Em Alta Tensão e Diagnósticos de Cabos s506

Energy Cables and Systems - Utilities

In SummaryBest results in diagnostics for HV systems

are obtained by:energizing the power system with mobile test-set (off-line method) for both withstand test and PD measurement;Using PD measurement to detect a wide range of defect undetectable with other testing methods;Performing PD measurement at every single accessory;Performing PD using capacitive embedded sensors;

Page 26: Ensaios Em Alta Tensão e Diagnósticos de Cabos s506

Energy Cables and Systems - Utilities

Cases StudyTechnical notes

and Real Application

OfPD measurements for Power System

condition assessment