A E R O D I N Â M I C A E Q U I P A M E N T O S I N D U S T R I A I S FLANGES PVC e CPVC Schedule 80 Norma ANSI B 16.5 150 psi PARAFUSOS : DIMENSÕES e TORQUE de APERTO Ø Flange Qtde. Furos Ø Parafuso Comprimento (Mínimo) Torque Torque N x m N x m O'RING JUNTA PLANA 1/2" 4 1/2" 2" 3 7 3/4" 4 1/2" 2" 4 9 1" 4 1/2" 2.1/4" 5 10 1.1/4" 4 1/2" 2.1/4" 10 20 1.1/2" 4 1/2" 2.1/2" 12 25 2" 4 5/8" 3" 15 30 2.1/2" 4 5/8" 3.1/4" 18 35 3" 4 5/8" 3.1/4" 20 40 4" 8 5/8" 3.1/2" 22 45 5" 8 3/4" 3.3/4" 25 50 6" 8 3/4" 4" 30 60 8" 8 3/4" 4.1/2" 60 75 10" 12 7/8" 5" 60 75 12" 12 7/8" 5" 60 75 OBSERVAÇÕES: 1. COMPRIMENTO DOS PARAFUSOS CONSIDERANDO INSTALAÇÃO FLANGE X CONTRA-FLANGE 2. TUBULAÇÃO DEVE ESTAR PERFEITAMENTE ALINHADA 3. TUBULAÇÃO DEVE ESTAR FIXA PARA EVITAR MOVIMENTAÇÃO DURANTE O APERTO 4. VERIFICAR A SEQUENCIA DE APERTO DOS PARAFUSOS (ver anexo) 5. APERTAR PARAFUSOS/PORCAS PRIMEIRO COM A MÃO 6. A SEGUIR APERTAR COM INCREMENTOS PEQUENOS DE TORQUE (NUNCA APERTAR EM UMA UNICA PASSADA) AERODINÂMICA EQUIPAMENTOS INDUSTRIAIS [email protected] www.aerodinamica.com

Flanges Torque de Aperto e Dimensoes Dos Parafusos

Embed Size (px)

Citation preview

  • A E R O D I N M I C A E Q U I P A M E N T O S I N D U S T R I A I S

    FLANGES PVC e CPVC Schedule 80 Norma ANSI B 16.5 150 psi

    PARAFUSOS : DIMENSES e TORQUE de APERTO

    Flange

    Qtde. Furos

    Parafuso

    Comprimento (Mnimo)

    Torque Torque

    N x m N x m

    O'RING JUNTA PLANA

    1/2" 4 1/2" 2" 3 7

    3/4" 4 1/2" 2" 4 9

    1" 4 1/2" 2.1/4" 5 10

    1.1/4" 4 1/2" 2.1/4" 10 20

    1.1/2" 4 1/2" 2.1/2" 12 25

    2" 4 5/8" 3" 15 30

    2.1/2" 4 5/8" 3.1/4" 18 35

    3" 4 5/8" 3.1/4" 20 40

    4" 8 5/8" 3.1/2" 22 45

    5" 8 3/4" 3.3/4" 25 50

    6" 8 3/4" 4" 30 60

    8" 8 3/4" 4.1/2" 60 75

    10" 12 7/8" 5" 60 75

    12" 12 7/8" 5" 60 75

    OBSERVAES:

    1. COMPRIMENTO DOS PARAFUSOS CONSIDERANDO INSTALAO FLANGE X CONTRA-FLANGE 2. TUBULAO DEVE ESTAR PERFEITAMENTE ALINHADA 3. TUBULAO DEVE ESTAR FIXA PARA EVITAR MOVIMENTAO DURANTE O APERTO 4. VERIFICAR A SEQUENCIA DE APERTO DOS PARAFUSOS (ver anexo) 5. APERTAR PARAFUSOS/PORCAS PRIMEIRO COM A MO 6. A SEGUIR APERTAR COM INCREMENTOS PEQUENOS DE TORQUE (NUNCA APERTAR EM UMA UNICA