DÍLIDRAINAGEINFRASTRUCTUREUPGRADINGPROJECT(DDIUP)-PHASEII
ENVIRONMENTALIMPACTASSESSMENT(EIA)
EIS/EMPPUBLICCONSULTATION
MINISTÉRIODASOBRASPUBLICASDIREÇÃOGERALDEÁGUAESANEAMENTO
DIREÇÃONACIONALDESANEAMENTOBÁSICO(DNSB)
CRISTO-REI,AUGUST4
2
DDIUP–FAZEII|AIA–KONSULTAPÚBLIKA
SUMÁRIUAPREZENTASAUN1. ENKUADRAMENTUNOOBJETIVUSIRAHOSIKONSULTAPUBLIKA2. REZUMUNOISTORIKUJERALPROJETUNIAN3. DESKRISAUNPROJETUNIAN4. DESKRISAUNAMBIENTAL5. IMPAKTUSPOTENSIAISAMBIENTAISNOSOSIAISNOMEDIDAS6. PLANUJESTAUNAMBIENTAL(PJA)
3
1.ENKUADRAMENTUNOOBJETIVUSIRAHOSIKONSULTAPUBLIKA
• InformanoesklaresebaparteinteresadasiranomospublikukonabakaraterisYkasiraprojetunian,inkluimosimpaktusambientaispotensiaisnomedidasmiYgasaun;
• PromovediskusaunkonabaDIAnoPJA;
• RekollakontribuisoinsnointegrasaunhosiparteinteresadasirabaihaDIAnoPJA
DDIUP–FAZEII|AIA–KONSULTAPÚBLIKA
1.SaidamakItaPropoinhela?
4
SaidamakItaPropoinhela?
5
MinisteriuObrasPublikashosiGovernuTimor-Leste(GoTL)bukahelaaprovasaunba:
• konstrusaunnooperasaunbaDíliDrainageInfrastructureUpgradingProject(DDIUP);
• projetukrusialidaaturehabilitakanaisderanjennianihaSidadeDililaranhonianarukbesik70Km
MapaJeralIntervensaunnian
6
IstoriaProjetunian• 2011–PlanDezenvolvimentuEstratejiku(PDE)2011-2030:melloramentuba
operasaunnomanutensaunhosisistemadrenajenDilinian=sidadeidane’ebemosliunoreduzinundasaun
• 2010to’o2012–Faze1–DESIGNPlanuMestrebaSaneamentunoDrenajenDilinian(2011-2030)[AprovaduhosiKonselluMinistrus]1.Hadi’ak/aumentakapasidadehosiinfraestruturakanaisdrenajenezistenteihaDiliatuhamenusinundasaunihaSidadelaran2.Konstroibasiaretensaunbainundasaunihafaanestratejikusiraaturegularizaudan-beenihatempuudanboot;3.Konstroiestruturasdrenajenniaatuprolongadurasaunhosifasilidadepublikusiraseluk(i.e.Estradas)
• 2014to’o2018–Faze2–DetailedEngineeringDesign(DED)DDIUPnian:1. RevizaunnoatualizasaunbaEskalanodadusDSDMPnian2. Atualizasaunhosinetworkrecords,mapeamentunodesignhosisesaunfounsirane’ebekonstroientre2012no20143. PreparasaunhosiDetailedEngineeringDesigns(DEDs)
• 2018to’o2020–Faze2–DED– AvaliasaunImpaktuAmbiental
FUTURU-2021baoin– ImplementasaunAsaunReasentamentuhosiGovernu(DNSB);2021to’o2025– Konstrusaunno/kaRehabilitasaunhosiDrenajenSidadenian
2.TansamakItaPresizaProjetune’e?
8
9
Problemasiranee’ebeaumentaRiskuInundasaunihaDíli• Kanaisezistentesdezenadus
inadekuadamente;• Drenajenhokapasidadene’ebemenus
tambaintupidusnosedimentasaun• Niveldezenvolvimentuurbanu
inkontrolavelne’ebeaas,ne’ebeaumentaareaimpermeavelihasidadelaran;
• InfrastruturaDrenajemlimitadubaestradanoarearesidensialihajeral;
• Obstrusaunbabe’ehalaehusiinfrastruturasira(ponte,estradanoedifisiusira)ihadrenajenletennoagrikultura(kankung);
• Entupimentuhusipassajememanoestradaihacanalletennebereduzseksaunkanalnian
• Manutensaundificilkonabasystemaarmadillalixunian(Lixuurbanu)
RsultaduProjetunebeesperadu• RedusaunRiskuBe’eSaebainhirahalomelloramentuSistemaMotanian,basiaretensaunnokanaldrenajen
• MelloriaSaudePublikaJeralbalonguprazu,ihaDíli
• Oportunidaditraballonoempregudiretunoindiretubalonguprazunokriasaunempreguhusiakavidadikonstrusaunnooperasaunsistemadrenajemnian
• Melloramentudeseñunoplaneamentuurbanusidadenian
3.TansamakItaPresizaEIAbaDDIUP?
10
ProjetuDDIUPne’epresisalisensiamentuambientalnoaprovasaunGovernuniantuirLeiTimoroan.ANLAklassifikaprojetune’ehoKategoriaA(AvaliasaunImpaktuAmbiental[AIA])tuirDekretu-Leino.05/2011– LisensiamentuAmbiental,tuirSektorXII:FaktorLokalizasaun,item4–AreanebePopulasaunDensidadeaa’s– Reassentsmentu>300emanain
11
4.SaidamakaProssessuEIA?
12
SumariuProsesuAIAnianDokumentu
Projetu Klassifikasaun
Temus Referensia
(TOR)
Esbosu EIS no EMP
EIS/EMP Konsulta Publika
EIS no EMP Final
Aprovasaun Lisensa nian
Monitorizasaun Ambiental
Regulador Ambiental (15 loron ba revisaun)
Regulador Ambiental (15 loron ba revisaun)
Responsavel Ambiental Superior (10 loron atu halo
desisaun)
Kategoria B (IEE)
Kategoria C (Fim prossessu)
Kategoria A (EIA)
Estudu Ambiental
PROJETU ATUALMENTE
IHA NE’E
FAZE ESTUDO
FAZE APROVASAUN
TOR Konsulta Publika
Reassentamentu (Komissaun
Interministerial Governu)
EnkontruPublikusirahalopartekonabaprossessukonsultapublika(ArYgu11DL05/2011)nebeakonteseihaestruturaEIAnialaran
14
Pasus7:1. Triajen(DokumentuProjetunian):fazedahulukihane’ebeReguladorAmbiental
[ANLA]desidekarikpresizahaloAIA.2. DefinisaunAmbito(TermusReferensia):definesaidamakatuavalianorlataiha
DIAnoseirealizaKonsultaPublikaida;3. AvaliasaunBaseline:rekollainformasaunrelevantesirakonabakondisoins
Ambientais(baseline)projetunian;4. AvaliasaunImpaktu:Prosesuavaliasaunformalhosiprojetupropostuatudefine
impaktusignifikaavusirabafazedesign,konstrusaunnooperasunnohakerekihaDIA
5. JestaunImpaktunoMonitorizasaun:BainhiraimpaktuadversusignifikaavusiralakonsegeminimizamakaseikonsideranotausolusaunminimizasaunbaihaPlanuJestaunAmbientál(PJA)
6. DrapEIS/EMPtoEnvironmentalRegulator:BainhiraAIAkompletaonamakaseisubmeteDIAnoPJAbaANLAatuhalorevizaunnoseirealizamósKonsultaPúblikaselukidahodibelesimukomentáriubaDIA/PJA.ITAIHAHELAFAZEIDANE’E
7. DesisaunANLAniankonabaLisensiamentuPasutuirfali:EkipaGovernunianseirealizarevizaunatualizaduhosikomunidadeafetadusiranoPlanuReasentamentune’ebepresiza.
5.SemakProponenteProjetunoEkipaAvaliasaun
nian?
15
1.PROPONENTDDIUPNOEKIPAPROJETUNIAN
16
Proponente1. MinisteriuObrasPublikas2. DiresaunJeralbaBeeno
Saneamentu(DGAS)3. DiresaunNasionalba
SaneamentuBaziku(NDBS)4. PesoaResponsavel:João
NazarethdePiedadeBrás(DiretorNasional)
KonsultorLiderDDIUPnianAdP-TL(ÁguasdePortugal–Timor-Leste)KonsultorAmbientalOASIS–SustainableProjects(Timor-Leste),apoiaduhosiJGP-Nvist(Portugal)
Component Name Academic/Professional
GeneralandLocalCoordinaaon
VascoLeitão EnvironmentalEngineerandMasterinInternaaonalUrbanandEnvironmentalManagement
Co-Coordinaaon PauloPereira EnvironmentalEngineer
LocalCoordinaaonAssistant RicardoFlorindo EnvironmentalTechnician
GeologyandGeomorphology
SérgioRosa GeologicalEngineer
AirQuality PauloPereira EnvironmentalEngineer
Noise InêsPaulino EnvironmentalEngineer/DFAAcousacEngineering
Biodiversity(Terrestrial) NunoVilela Biologist,MasterinEcologicalEconomy
HydrologyandWaterResources
PauloPereira EnvironmentalEngineer
Soils,Landuse,PlanningandZoning
ElisabeteRodrigues Geographer
Water,WasteandWastewaterManagement
MonicaPatel EnvironmentalTechnologyExpert
SocioeconomicPlan JoãoJoséMarans SociologistandSpecialistinCity,TerritoryandRehabilitaaon
Heritage(ArchitectureandArchaeology)
JoãoAlbergaria Archaeologist
TechnicalDesignandGIS JoãoValado Design,MapandGIStechnician
6.SaidamakItaniaProjetuidane’e?
17
Rehabilitasaunno/kakonstrusaunfounbakanaisdrenajen(Motanokanaisdrenajennivelprimeirunosegundu)ihaAreaSidadeUrbanaDílinian
• IntervensaunTOTALnianaruk:70,453m;• NumeruTOTALIntervensaun:55• PerioduEsamadubakonstrusaun:2021to’o2025
18
IntervensaunDDIUPnian
DDIUP
6.1.Atuimplementaihane’ebe?
19
20
AREAESTUDUDDIUPnoAPs
AREA
DDDIUPhoPostusAdministraavusnoSukus
21
IntervensaunTOTALnianaruk:70,453m;NumeruTOTALIntervensaun:55
PerioduEsamadubakonstrusaun:2021to’o2025
MainProjectComponents
Length(m) CRISTOREI DOMALEIXO VERACRUZ NAINFETO
Group1ChannelSystem
D1 307 BidauLecidereD2 2608 Kuluhun BidauLecidere,Akadiruhun
D3 4406 Colmera,Caicoli BidauLecidere,GricenforSantaCruzD4 219 Colmera,Caicoli,Mascarenhas D5 397 Motael,Colmera D6 2112 Motael,Colmera,Mascarenhas SantaCruzD7 730 BidauLecidere,AkadiruhunD8 667 Motael,Colmera
D9 5554 Kuluhun,BidauLecidere Bemori,BidauLecidere,Gricenfor
D10 2088 Kuluhun Gricenfor,BidauLecidere,SantaCruz,BemoriD11 2213 Motael,Colmera,VilaVerde
Nota:Sistemamotasirane’ebelainkluiihatabelaidane’e
DDDIUPhoPostusAdministraavusnoSukus
22
MainProjectComponents
Length(m) CRISTOREI DOMALEIXO VERACRUZ NAINFETO
Group2ChannelSystem
D12 795 BairroPité D14 2492 KampungAlor,BairroPité D15 996 KampungAlor,Fatuhada D18 2083 Fatuhada,Comoro D19 462 Fatuhada,Comoro D21 300 BidauSantana D22 79 BidauSantana D23 218 BidauSantana D24 415 BidauSantana D25 294 BidauSantana
D26 69 BidauSantana D27 999 BidauSantana,Kuluhun
D28 427 Becora
D29 640 Camea D30 2903 Becora D31 559 Becora,Kuluhun D32 672 LahaneOrientalD33 918 Kuluhun LahaneOrientalD34 676 LahaneOriental,BemoriD35 1237 LahaneOriental,Bemori
6.3.BainhiramakitaPropoinatuhaloidane’e?
23
OrariuPlaneaduDDIUPnian
24
25
6.4.Oinsaamipropoinatuhala’o?
26
Aturedusriskubainundasaun,DDIUO–FazeIIdezenhaahaonasistemadrenazemurbanahokapasidadene’ebebootliuhodihasorueventuextremusira:Antes:Redene’ebeihaahaonaho
tempuretornu=anan5Futuru:Sistemabaredehotempuretornuanan25nokanalatufahenoregularizasaunbamotahotempuretornuhodurasaunanan100
27
1) Rehabilitasaunno/kakonstrusaunbaDrenazemne’ebeihaahaonanokanaldrenazemfoun;
2)Kanaldrenazemnianbadesviu(interseptor)(KaikolinoVilaVerde)hodidesviakorentebebaihasistemamota(kuluhunnomaloa)hodidiminuiriskuinundasaunbasentrusidade;3)Rehabilitasaunhoeskalabootbamotabootsirahodihafasilbeesulinhusifohobatasi;4)Basiaretensaunbainundasaunhodiajudakontrolafluxoihasidadenialaran;no
AYvidadekonstrusaunsaidadeit?
OINSA?1)RehabilitakakonstruifilafaliredefounKanalPrinsipal
28
Sistemabadrenazembelefahebazeiabamedidahusivaletakaniauzu,makhanesan:a) Rededrenazemki’ik(minor)
(sekundariunotersiaria):- Valetaihadalannininkavaleta
husikomunidadeniahelafaankaedifisiugovernunian;
b)Rededrenazemprinsipal(apuprimariu)OBJETIVUPRIMARIU:- HaloluanValeta(Modelu
retangulukatrapeziu)- Valetane’ebetakamean.(i.e:)
Valetane’ebetakameanihaavenidasirasidadelaran.
OINSA?1.1)Kanalne’ebeRehabilitaahaonaDependebaasesukahelafaanne’ebeihasidade,rehabilitasaunseihala’ohomodelu:a)Hamoosnoke’evaletahodi:i)hamoossolidu;ii)hamooscrosssec@on;iii)diminuirezistensiabafluxubee;b)Mudadimensaunnoprofilhusikanal:haloremodelasaunnore-inklinasaunbacrosssec@onsirahodisaiingrimeliu,kleanliunobootliuhodihalobeesulinholalais;
Antes Depois
OINSA?1.1)Kanalne’eberehabilitaahaona
30
OINSA?1.2)KanalFoun
31
Konstrusaunbakanalfounihaestradaniaokosnohalokoneksaunbadrenazemne’ebeihaahaonahodiaumentakapasidadedrenazemhusiraiokosnoraileten.Konstrusaunselukbelehala’oihadrenazemnatural(maibelaihakonstrusaundrenazem)entreumasira.
OINSA?2)KanalbaDesviu
32
Ezemplu:MascarenhasTOTALcomprimentu:2048m;(KoneksaunbasistemaKuluhunnian)VilaVerdeTOTALcomprimentu:925
m;(Koneksaunbasistemamaloanian)Objeavu– HodialeviaareaCaicolinoCentrusidadene’ebelaihaposibilidadeatuintervensaunbarakakontese
OINSA?3)RehabilitasaunbaMota
33
River System Length (m) Design ARI, YearKuluhun 3000 100
Maloa River 2450 100
Santana River
Santana River 1062 100
Becora/Benamauk Tributary 4135 100
Bemori Tributary 1595 100
o Wideninganddeepeningoftheriverbedbymeansofbo}omexcavaaon;o Adjustmentofriveralignment,smoothingallthebendsandbo}omre-lining;o Construcaonofnewandhigherconcretesideretainingwallsalongtheriverbanks(bankstabilizaaon);o Replacementoftheexisangbridgesorbridge/weir;o Leveeconstrucaon;o Fencingtheriverwiththewall.
OINSA?3)RehabilitasaunbaMota
34
o Konstrusaunbaestruturasaidanianbatasihodifasilitadrenazembeebatasi
OINSA?4)Basiaretensaunbainundasaun
35
o Ajudadiminuiinundasaunlongoprazuniannoabsorveexesuhusifluxuhusisistemadrenazemsira,inkluidrenazemhusiestrada
• Ajudakontrolapresaunhusi
eskoamentuihazonajusante
Retention Basin Area, Ha Design ARI, Year RB-1 (Caicoli) 2.2 25
RB-3 (Aimutin) 4 50
CAICOLI
Recommended